Home

Aspen Installation & User Manual

image

Contents

1. 2 Accupuncture J Jet Operation The Aspen accupuncture jets offer a series of options The lower iets and upper iets can be operated independently or simultaneously depending on yothe number of times you press the accupuncture jet icon First press bg Second Press EP Third Press EPs Fourth Press b Upper Nozzles On pper nozzles off Upper and Lower pper and Lower Operate Lower Nozzles off ower Nozzle On Independently urn Off 5th Press AC 3 Steam Operation Turn controller on and press key on control panel or remote control Once button is depressed you will see the steam icon appear on the control panel Water will begin to fill in the steam generator and the room temperature will be displayed on your control panel The steam setup time automatically defaults to 45 minutes and the temperature automatically defaults to 45 degrees celsius If there is no water running to the steam generator then the LCD screen will indicate a lack of water If this happens press the steam icon again to shut off Af One minute after the steam has been shut off the solsteam generator will automatically drain any excess water from the steam basin 4 Steam duration and temperature setup While the control panel is on press the D or 5 key on the panel to increase or decrease the steam time keeping in mind that the default time is 45 minutes To adjust the temperature click on the r lU key to increase or decrease by o
2. then when the unit is completely erected snug up all bolts and screws 4 3 Installation Steps Place the shower floor unit as pictured below 1a 16 24 inches from its final installed location Now adjust the leveling feet 1c to bring the unit flat and level by using a 3 foot level 1b and an open end or adjustable wrench to turn the adjusting nuts This will raise or lower each corner as needed Once the unit is level and flat lock each leg into position with its locking nut 2 After leveling the whirlpool bathtub place the steam shower back plate on top of the tub perimeter Affix back plate to whirlpool tub using 6 number 30 screws Two people are recommended for this step Back Plate Tub Adjust the eccentric rollers to allow the door to roll and seal smoothly By turning the eccentric roller the wheel is raised or lowered This allows you to adjust the ride height of each side of the sliding glass door You want the door to be as plumb as possible Glass Door Move the glass door frame onto the bathtub top and tighten the aluminum side of the glass to the acrylic back plate using 4 number 20 round head tapping screws Two people are recommended for this step Roof cover Installation steps continued 5 Place the shower cover on top of the back plate and glass door frame Secure the shower cover to the top of the stea
3. Supp ly Steam Out Drain amp Y BY BL BY B BW BW p lt lt Steam Engine Instruction Manual for Massage bathtub 3 BF600 CONTROL PANEL BOSOOG GOO LcD Panel n Power N A O Accupuncture Jets 5 Steam Q Temperature Volume C Temperature Volume 20 Radio Overhead light D Exhaust fan D Time D Time D Radio station memory Function button 17 Steam generator cleaning function D Alarm D Power light Instruction Manual for Massage bathtub 4 REMOTE CONTROL Power Alarm N A Steam Volume Volume Function button Radio Exhaust fan Accupuncture Jets Radio station memory cGeoocoooococooe Overhead light Computer LCD description sees 9 Exhaust fan d Y amp p Water intake 3 2 8 88 D Time 4 T 5 Temperature display 5 1 Radio station LI Min HE Radio frequency 6 Q Alarm Steam 7 dB 188 e H MHz D Spray a E 11 Steam generator cleaner Instruction Manual for Massage bathtub 5 E BF600 control panel function description 1 To turn the power on press the b icon from the control panel or remote control To This will turn on the overhead light as well as display the room temperature time and overhead light icon on the display Press b icon again to shut down
4. elbow fixture of the shower head with a clamp as is shown in the below figures Figure 11 27 Figure 11 Rainfall shower hose 6 Please refer to the labels with icons on the wires of the various low voltage components They may include Telephone CD player radio loudspeaker LED lights fan and control panel Connect the wires sharing the same labels and or properly mated connector pairs The radio antenna will need to be unrolled and placed for best reception See figure 12 Figure 12 16 Connect the hot and cold water hoses the red one is for hot water while the blue one is for cold Both the hot and cold water supply lines are half inch NPT pipe thread All electrical high voltage input wiring is to a terminal block as follows 110 volt AC as pictured to the right is Ll or hot neutral and ground All 220 volt AC is LI and L2 with ground ho neutral Mote this is the inside of the box The outside of the box and where the wires come from are Tva volts Ll 12 neutral Ground wp 1E 1 This side is fed and connected by your electrician 110 volts to power the tub or 220 volts when energizing This wire when coming from the tub is 110 volts the steam generator A When it comes from the steam generator it 1s 220 volts If you have purchased the optional tub water heater the following image and instructions are for you If you have not
5. to understand that the electrical requirements for your unit have changed The heater requires a second separate electrical circuit that can supply 13 amps at 110 volts with GFI in addition to what your tub had originally needed B The size of breakers and wire gages needed is determined by local state and national codes as interpreted by the installing electrician The length of the wire going to the steam generator from the wall should be 5 feet while the length of the telephone line needed is 7 feet This allows the unit to be pulled out from the side walls if maintenance is ever needed C Drainage The diameter of the drain pipe needs to be at least 2 inches The position of the drain hole can be within 6 inches from the hole shown in the drawing on the previous page Notes 1 The distance from the top of the steam room to the ceiling of the area where it 1s installed should be 4 inches or greater The room should be at least 4 inches taller than the spa 2 It is recommended that the water pressure be at least 43 PSI and both the cold and hot water pressure should be as equal as possible If the pressure 1s lower than required have your plumber install the necessary equipment to increase the water supply pressure 3 Please have ground fault interrupter GFI protection on all power supply lines to the spa 4 It is easier to line up all panels with the hardware loose During initial assembly please attach all fasteners loosely
6. 1 Upon the arrival of your Aquapeutics spa take care to make a thorough inspection for any visible damage to the shipping container Visible damage should be reported to your carrier immediately All SHIPPING DAMAGE should be noted on the assigned shipping document 2 Itis recommended that all rough plumbing and electrical work be completed before the assembly of your Aspen begins 3 At least two people are required to lift the larger pieces into position during installation 4 Tools Wooden mallet openend wrench level Tapemeasure Screwdriver Pencil 4mm Hex wrench 2 Installation instructions Rough Plumbing amp Electrical Drain pipe can be offset as much as 6 inches from tub drain 2 2 Installation drawing for waste plug Upper Rail Roof Cover i Lights Epe IPL ETE Speaker Fan e Shower pole Towel Pole Ho iilo bd WH E Handheld Shower Mirror dr Faucet Controls TL i Accupressure Jets Water Connection i Shower hose Foot massager Soap Box lh JE Screw Cap GE a Bathtub MODEL Aspen Installation instructions A Water supply Hot and cold water supply lines are half inch NPT pipe thread Power supply A220Volt 13 amp service with GFI is necessary to energize the steam room spa and a 110 volt 11 8 amp circuit with GFI 15 needed for the whirlpool bath Please note If you have purchased a Tub with the additional heater option it is very important
7. ASPEN INSTALLATION MANUAL Thank you for choosing the Aquapeutics Aspen computerized steam shower whirlpool bath Please read the following manual in its entirety before assembling your unit Itis also very important to follow the safety suggestions outlined below at every use 1 Please keep in mind that like most shiny bathroom surfaces when they get wet they may become slippery Take care not to slip or fall 2 Children should only use this product under adult supervision 3 Users who suffer from heart disease or have high blood presser should exercise greater care when using this product 4 Senior citizens pregnant women and those who are of ill health are advised to get a doctors opinion on the recommended frequency of use of this product 1 Technical parameters amp package information Electrical data Dimensions inches NW capacity frequency Length Width 1G 110V 11 8 amps CR 1 220 13 6 34 87 390lbs ss amps gallons Please note If you have purchased a Tub with the additional heater option it is very important understand that the electrical requirements for your unit have changed The heater requires a second separate electrical circuit that can supply 13 amps at 110 volts with GFI in addition to what your tub had originally needed Installation instructions for your optional heater are in the installation section of this manual 2 Package information
8. S SES NE ELE BER I DIA REEL Ma a E BF600 control panel function description _ P A WH N Electrical control system E BF600 function and usage Function overview E 5 Exhaust Fan 6 Radio 1 Handheld infrared remote controller 1 2 Control panel 1 3 Control electric box 1 4 Steam Generator 1 5 Top light 1 1 Rated voltage AC 240V 2 Maximum radio volume 20 decibals 3 Rated frequency 60Hz 4 Temperature range 20 55 C 5 Steam time 5 50 minutes 6 Temperature measuring error 2 C 7 Power amplification output 1OWX1 8 Operating ambient temperature 5 C 40T 9 Standby power lt 10W Remote controller features 1 Operating voltage 3 0VDC 2 Powersupply 7 batteries 2 pieces 3 Expected service life of battery over one year 4 Transmit range at least three meters between the receiver and the infrared sensor 5 Transmit angle usually about 60 6 Transmit medium infrared Controlled devices 225 1 Steam Generator AC240V 60Hz 3 6KW 3 Exhaust fan DC12V 3W 2 Electromagnetic valve DC12V 6W 4 Top light AC12V 3W Instruction Manual for Massage bathtub 2 BF600 ELECTRICAL SCHEMATICS AC240V Fan DC12Y RATED VOLTAGE C240 RATED FREQUENCY 50Hz 60Hz MAIN CONTROL BOX RATED POWER 3 6kw RATED CURRENT 15 MODEL E BF600 amp TOP light AC12Y Back Light AC12V 4C220V 240V
9. m shower using 6 number 20 screws Shower Cover v Back Plate 6 Connect all hoses to and from the steam generator The appropriate outlets and inlets are labeled in the diagram below The steam generator drain hose is pushed onto the fitting straight or elbow connected to the steam generator It is this fitting by a clamp and a 3 16 X 5 8 inch round head fastener as is shown in the below diagram The steam securedto thi generator drain line needs to be plumbed to main drain Steam Outlet Cold water feed connector Electrical Feed Steam Generator When bending the insulated steam hose please Use Extreme Care not to crimp the hose as you feed it through the appropriate hole in the tub section M Photo is not of Caribbean But connections are the same The placement of components may be different The all silver hose is the water supply feed hose to the Steam generator It is attached here The rubber washer gasket that is secured by a wire tie is inserted into the end of Steam hose 4 Connect the insulated black high temperature steam pipe which is on the steam outlet to the steam jet s connector on the spa s back panel Figure 10 Black insulated high temperature steam pipe Figure 10 Front and side view of Steam outlet K The water hose for the rainfall shower goes through the hole in the shower roof ceiling and then connect it to the
10. ne degree celsius Press and hold the Or _ for 1 5 seconds to adjust the time automatically continuously The temperature ranges from 5 50 degrees celsius 5 Exhaust Fan When the panel is on press the KR key on the panel or remote control to start up the exhaust fan Press again to turn off Instruction Manual for Massage bathtub 7 6 Clock instructions To adjust the time press the FUN key for 1 5 seconds and the time icon will flash on the display When the time icon begins to flash press the hour icon to change the hour and press the i key to adjust the minutes T Alarm When there is an emergency press the E C key on the panel or remote control and the speakers will give off an alarm sound The alarm will also sound when there is something wrong with the system When this happens there will be an EE message on the LCD screen To turn off the alarm you must turn on the overhead light and exhaust fan at the same time and make sure all other functions are turned off Only then can you disengage the alarm by pressing the on off icon 9 Overhead light When you turn the steam shower on the overhead light will turn on automatically To turn off simply touch the overhead light icon on the display or remote
11. oot massager open the cover of the unit as depicted in the illustration below Figure 15 Attention Within your warrantee period please do not break the seal on the electrical box or the steam generator Doing so will void your warrantee There are no user serviceable parts inside DO NOT repair or replace these units on your own If you do experience any problems please contact Aquapeutics Toll Free Customer Service line 1 800 290 6812 for after sale service ASPEN OPERATION MANUAL Contents Operation instruction Of E BF600 9 MM Function Overview MM SES MEME a m The control Control system features enne nnn nr nnne rrr nunt nnnm nnns nnn nennen eenen TE aaa a EET Giria i stm Electronic control system E BF600 installation and wiring diagram E a E BF600 control system key description MMMMeeemM M MMMeMM Remote controller keys descr m a Computer LCD description VAILE TE E EN LE RS ESO LDE NENA E E E BITE
12. then please skip and disregard this section and you may pick up on the next page water jet pipe Cut and discard Ze m m m m Pick side wall water jet pipe that is convenient to work on Measure the distance taken up by the water heater Approximately 7 and 5 8 inches Cut this part out Glue the ends of the water heater and wait until the glue sets as per the manufactures instructions Plug the heater in It has its own thermostatically controlled on off and temperature controls It will turn on when there is water present and the temperature is below 102degrees and will shut off at 104 degrees Remember that this heater is plugged into a separate GFI 110 volt circuit as discussed 1n two other sections of this manual Silicone application While your Aspen steam shower is still 16 24 inches away from its final installed position all joints and seams should be calked with a high marine grade silicone sealant not provided After fully testing the unit you may slide it into its final installed position Spray and foot massage installation Connect the hose of the hand held shower head B by screwing it into nozzle A as depicted below and then put the hand held shower head into its cradle C Figure 14 Figure 14 4 2 Use the same technique to install the foot massage unit Its nozzle is located approximately 16 inches below the right side as you enter hand held sprayer nozzle When using the f

Download Pdf Manuals

image

Related Search

Related Contents

トーンモデム取扱説明書 ver1.06 概要 構成 本体 接続方法 本体  MVS MV-1A    Programme standard  i @ ==期 株間クサ ト リーナ  là - Sebasto Autoradio  StarBoard Link EZ2-Pen  Miele F 12011 S    Instrucciones de servicio VEGASWING 66  

Copyright © All rights reserved.
Failed to retrieve file