Home

Haas CHT 2000 O&M Manual

image

Contents

1. Red Cone 1 See Figure 16 Wound Tf supplied with black cone mount opposite as shown Sprin Figur e 12 One spring mounted a 1 torque tube ng Left hand Bearing Bracket cable drum rec 3 o m Wl Cu R W 7 Hed Cone il LT Black Cone Center Support Bracket Right i See Figure 17 Cable Wound Figure 13 Two springs mounted on a 1 torque tube Spring eth Black 3 Shaft Coupling T Bearing Bracket mmmn oj oN LW W Red Cone Black Cone ilo _ Center Support Bracket Figur e 14 Two springs mounted a 1 keyed solid shaft Cable Left hand cable drum red fa Shaft Coupling aaao d T l H E mip AM MN mm HIRE o R W jo RW oj le L W Red Cone Red Cone d Black Cone Black eE Center Sonn Bracket Fig ure 19 Four springs mounted on a 1 keyed solid shaft oe STEP 13 Place the center support bracket and the bearing on the axles as shown in Figure 16 bearing sits inside spring fitting Bolt spring fitting s to center support bracket see Figure 16 or 17 using 3 8 dia x 1 1 2 hex head bolts Slide a cable drum on both ends of shaft Be sure correct hand drum is used see Figures 12 thru 15 Slide bearing on each shaft end if not
2. 4 2012 Haas Door Company HINGE SCHEDULE For For Figure 6 2 Track 3 Track a _ Top Brackel Top 8 Section Fs Hinge 7 Hinge 9 a 7 Section A Hinge 6 Hinge 8 w 6 Section Hinge 5 Hinge 7 i 5 Section Poe Hinge 4 Hinge 6 Te 4 Section Hinge 3 Hinge 5 83 Section a Hinge 2 Hinge 4 Lock 2 Section 5 Hinge 1 Hinge 3 Bottom 1 Section Ral Bottom Bracket Center Stile Section Figure 6 Plumb ine a Note Small doors may use a bracket without Bearing O a wall mounting leg Bracket Ma Horizontal wen Track Rope A 2 222 tL ee Zz We oy l spice Kee is Bracket Si Completion of Track Figure 9 Rev 5 12 Haas Door Commercial Instruction Manual STEP 9a HI LIFT TRACK Connect vertical hi lift track to top of existing vertical track with 1 4 x 5 8 truss head machine screws Set track plumb and fasten to jamb in the same manner as the vertical track previously installed in Step 4 Attach bearing brackets to the horizontal angles with 3 8 x 3 4 bolts amp nuts Form rope loops to a convenient overhead structural member and insert horizontal tracks through them then attach bottom of the Curved portions of track to the top of the vertical tracks at the splice brackets with 1 4 x 5 8 truss head mac
3. Section S STEP 1 INSTALLATION OF DOOR Check the size of door to be sure it is the same size as opening Inspect the track and determine if you have reverse angle or bracket mount tracks Note bracket mount has individual J brackets to attach track to jamb reverse angle has a continuous angle to attach track to jamb Note if door is supplied with reverse angle The door should be 2 wider than opening G N section End Hinge see Figure 6 on page 4 for correct hinge numbers Weatherstrio Figure 3 we J Bottom Bracket O E s Cable Drill a 3 16 diameter gt lt 4 e hole for this screw oe Q STEP 2 i Attach hardware to bottom section with 1 4 x 3 4 hex head sheet metal screws see Figure 3 If door requires struts u bars see Figure 8 on page 4 2 2012 Haas Door Company Rev 5 12 Haas Door Commercial Instruction Manual INSTALLATION OF VERTICAL TRACKS Opening Width Top of both tracks must level to each other Reverse Angle Mounting ici vertical Track Note Opening Width pume amp be parallel to each other e Both Vertical Tracks must be stop Mould Level qi Eottom Section must be level Shim as req ad Breacket Mounting Figure 4 STEP 3 Position bottom section in center of the opening allowing equal distance from
4. Support Axle Bracket Bracket Centerline Spring Fitting Spring Fitting Spring Bearing Axle gol Bearing Centerin S Notch to a Bottom Fittir Centerline J Figure 16 p Figure 17 6 2012 Haas Door Company Rev 5 12 Haas Door Commercial Instruction Manual STEP 14 Raise the shaft assembly over the door If 2 piece shaft with coupling is supplied raise half the total shaft at a time Rest the end s of shaft on the horizontal track angle See Figure 19 For coupling installation T Leit side shaft Rotating bearing hub faces the cable drum Coupling es he Coupling STEP 15 Figure 18 Figure 19 Locate and attach spring bearing plates center support bracket to mounting pads not supplied See Figure 2 for wood or steel frame jambs Mount spring brackets to structural member of building of sufficient size to withstand spring s torque When mounting springs on pads keep in mind that springs grow in length when wound Allow at least 5 space between spring fitting and cable drum If mounting the center support bracket to wood use 2 5 16 x 1 5 8 long hex head lags for each bracket For steel jambs use 2 3 8 x 1 1 2 hex head bolts If mountlng directly to concrete use 2 5 16 dia thru bolts or threaded rods not supplied STEP 16 ATTACHING THE CABLES Thread each cable between the axle and wall Then insert each cable into the entry slot of each dru
5. all components must be available for inspection by an authorized Haas Door Company representative Upon verification of a manufacturing defect Haas Door Company will provide repair or replacement part s at its option THE MANUFACTURER SHALL NOT BE RESPONSIBLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF ANY BREACH OF THIS EXPRESS LIMITED WARRANTY including but not limited to any damage to buildings other property or for any injuries or damages sustained by any person whomsoever or the recovery of any direct or indirect costs such as shipping travel lost time installation labor charges paint or painting cleaning repair or other building materials This warranty gives you specific legal rights and you may also have other rights that may vary from state to state Haas Door Company does not authorize anyone to change or modify the above warranties in any respect ANY IMPLIED WARRANTY OR MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE APPLICABLE TO THE COMMERCIAL MODEL S OF INSULATED STEEL OVERHEAD GARAGE DOORS IS LIMITED IN DURATION TO THE DURATION OF THE HAAS DOOR COMPANY WRITTEN WARRANTY SET FORTH ABOVE AND NEITHER HAAS DOOR COMPANY NOR ANY AUTHORIZED SELLING DEALER SHALL BE LIABLE FOR LOSS OF TIME INCONVENIENCE COMMERCIAL LOSS OR OTHER CONSEQUENTIAL OR INCIDENTAL DAMAGES Some states do not allow limitations on how long an implied warranty will last or the exclusion or limitation of incidental or consequential damages pa
6. each side of the opening STEP 4 Position left hand track over rollers as shown in Figure 4 Space track 1 2 from door as shown Before attaching vertical track angle or brackets to jambs it must be plumb and parallel to door and raised to match leveling of bottom door section Attach vertical track angles to jambs by welding or by using 1 4 self drilling screws on steel jambs or 5 16 x 1 1 2 hex head lag screws on wood jambs If mounting directly to masonry anchors are not supplied Repeat above step for right hand track Note Both tracks must be parallel for proper operation Insert rollers into end hinges Hook rollers into vertical track and swing end hinges onto door section as shown at left Secure with fasteners provided Correctly Installed Figure 5 STEP 5 Place 2 section on top of bottom section Note if door is supplied with cylinder lock use section with lock holes punched or drilled in it See Step 19 on page 8 Attach hinges and rollers as shown in Figure 5 See hinge schedule Figure 6 on page 4 for correct placement of numbered hinges If inside lock is supplied see Figure 7 Rev 5 12 2012 Haas Door Company 3 Haas Door Commercial Instruction Manual STEP 6 Complete the remainder of the sections at this time Top door section should only be installed after horizontal track or full vertical track has been installed Note if door is supplied with full view aluminum section s attach hin
7. 6 11 198 17 66 Oo 17 2 5 17 66 17 66 17 66 Max Door Max Door Size _ 1 8 27 182 28 27 Dae DE Slee De 38 2 Ba 38 2 242128 2427 1 6 20 16 0 32 OK Bo 1 eo On PP OE 22220 Boe ie Bee e220 Se a0 Bo e Bo O S220 Note Extruded End Cap Extruded End Cap Steel Steel Steel Steel Steel Steel Steel Steel Extruded End Cap Extruded End Cap Extruded End Cap Extruded End Cap 26 GA V Groove Woodgrain Steel 26 GA V Groove Woodgrain Steel 26 GA V Groove Woodgrain Steel 26 GA V Groove Woodgrain Steel 26 GA V Groove Woodgrain Steel 26 GA V Groove Woodgrain Steel 20 GA V Groove Smooth Steel 20 GA V Groove Smooth Steel 24 GA V Groove Stucco Aluminum 24 GA V Groove Stucco Aluminum 26 GA V Groove Woodgrain Steel 26 GA V Groove Woodgrain Steel 26 GA V Groove Woodgrain Steel 26 GA V Groove Woodgrain Steel 2012 in white 26 GA Flush Woodgrain Steel 26 GA V Groove Woodgrain Steel 26 GA Flush Woodgrain Steel 26 GA V Groove Woodgrain Steel 20 GA Smooth Steel 20 GA V Groove Smooth Steel 20 GA Smooth Steel 20 GA V Groove Smooth Steel 24 GA V Groove Stucco Aluminum 24 GA Flush Stucco Aluminum 26 GA Carriage House Panel Woodgrain Steel 26 GA Ranch Panel Woodgrain Steel 26 GA R
8. COMMERCIAL 2000 SERIES COMMERCIAL 2032 in white with full view sections COMMERCIAL VAG OORS n 2 Thick R47 66 2010 2012 2014 2016 2032 2033 2032 20 2033 20 2050 2051 2060 2070 2080 2090 2000 Series 2 thick R 17 66 he Strength To Keep Out Noise and Weather Haas 2000 Series commercial insulated steel doors are manufactured with the elements in mind They will enhance the beauty of your building while at the same time insulate and dampen outside noise Choosing high R Value sectional doors will help G increase energy efficiency and savings Polyurethane insulation provides the highest R Values available in sectional steel doors 2000 series doors are reinforced with roll formed galvanized steel struts and double end hinges as required to meet wind load specifications and to comply with ANSI DASMA 102 2004 The protective coating system is found on both the interior and exterior steel T 2032 in white with full view sections 151611 Thickness R Value 2010 2012 2014 2016 2032 2033 2032 20 2033 20 2050 2051 2060 2070 2080 2090 27 50 8mm Be 50 8mm D 50 8mm 2 50 8mm 27 50 8mm Oe 50 8mm 2 50 8mm Pu 50 8mm 21 50 8mm oe 50 8mm 50 8mm 24 50 8mm 27 50 8mm 27 50 8mm calculated R Value 17 66 OO 11 95 11 168 17 66 17 6
9. aised Panel Woodgrain Steel 26 GA Sculptured Panel Woodgrain Steel Certain weights and or applications may limit the size allowed 99 42 L 8 X914 c 0006 1e gt IFNVa dOOd a Haas Installation amp Maintenance Door Service Manual For A Nofziger Company Commercial Steel Doors 320 Sycamore Street Wauseon OH 43567 www haasdoor com Read Instructions Thoroughly Before Starting Installation Horizontal Track Support F B f Center i Horizontal Track Support SS Jam Preparation E eio ne i 1 a 22 Top Fixture Counterbalance Vertical Track Fd r 2 yer End Hinge Bottom Bracket Center Hinge Lock Assembly Figure 1 Rev 5 12 2012 Haas Door Company 1 Haas Door Commercial Instruction Manual OPENING PREPARATION Note All framing materials must be provided by building contractor or installer Some large doors may require additional oad or pads located off center to accommodate All vertical jambs auxiliary bearings and pads regardless Fig ure 2 W of tyoe must extend to top of headroom a requirement gt Steel J Channel 2 Cc Q O Opening Width me pa Min Wood a Steel Jambs Section W Interior Elevation
10. chine screws should be to inside of the tracks as shown in Figure 9b Jamb fasteners must be installed with no more than 48 between each fastener Now set bearing brackets against the plumb lines and attach brackets securely to the track and wall Plumb Line Bearing Bracket Splice me m Hs Bracket Lower Vertical Track Figure 9b STEP 11 TOP BRACKETS Place top section in position With rollers inserted in the sleeves of top roller brackets bolt brackets to section through holes provided utilizing self tapping screws Adjust bracket slide so top section is perfectly vertical and tighten adjusting bolt securely Attach top leaves of hinges from the preceding section Check tracks for proper clearance and permanently secure all fasteners Section Top Fixture H Figure 17 i EA Haas Door Commercial Instruction Manual WARNING Installing torsion springs can be a dangerous procedure and should only be performed by qualified door service personnel Do not attempt installation without proper tools and until reading and understanding the following instructions STEP 12 COUNTERBALANCE INSTALLATION Determine what type of spring assembly you have as shown in figures 12 13 14 or 15 Left hand 1 cable drum red 5 Bearing Bracket on TT I R W Center Support Bracket Black
11. ction with 1 4 20 nuts and Bottom bolts supplied as shown in fig 23 Section MAINTENANCE amp CAUTIONS Recommended Service lubricate rollers with a light oil as required Check and tighten all nuts bolts and screws annually This may be required more frequently for high usage doors Haas Door recommends servicing any part of the counterbalance system including springs drums cables bearing brackets and bottom corner brackets where cable is attached be performed by qualified door service personnel only see notice below Important Safety Notice Operate door only when properly adjusted and free of obstructions Door is under extreme spring tension Repairs and adjustments especially to cables and spring assembly can be hazardous and should be performed by qualifled door service personnel only Do not permit children to play with garage door or electric controls If door is now or later becomes electrically operated pull down rope must be removed Avoid standing in open doorway or walking thru doorway while electrically operated door is moving Should door become hard to operate or completely inoperative it is recommended that a qualified door agency be contacted The notice above has been approved and recommended by the National Association of Garage Door Manufacturers NAGDM 8 2012 Haas Door Company Rev 5 12 MIT CN CHT CMT Series MODEL 600 700 2000 800 STEEL COMMERCIAL GARAGE DOORS Haas Door Co
12. ges with 1 4 self drilling screws provided STEP 7 SLIDE BOLT LOCK The inside lock is installed on the end stile of the second section so the slide bolt rests against the top of one of the rectangular engaging slots in the vertical track See Figure 7 If door is supplied with cylinder lock see page 8 Track R H Lock Shown L H Opposite Figure 7 STEP 8 U BAR INSTALLATION All trusses u bars except top section truss are attached with tech screws below hinges as shown in Figure 8 Top section truss is located directly above the top roller brackets secured at the ends with tech screws Secure all trusses to center stiles through existing holes utilizing tech screws Note Doors over 14 2 wide require one truss per section STEP 9 STANDARD LIFT TRACK Attach bearing brackets to the horizontal angles with 3 8 x 3 4 bolts amp nuts Form rope loops to a convenient overhead structural member amp insert horizontal tracks through them then attach bottom of the curved portions of track to the top of the vertical tracks at the splice brackets with 1 4 x 5 8 truss head machine screws amp nuts Head of machine screws should be to inside of the track See Figure 9 Using a level strike a plumb line from the inside of the splice bracket to the inside of the horizontal angle on each side Place outside edges of bearing brackets against the plumb lines and attach brackets securely to the wall see Figure 9
13. hine screws and nuts Head of machine srews should be to inside of the track See Figure 98 Using a level strike a plumb line from the inside ot the splice bracket to the inside of the horizontal angle on each side Place outside edges of bearing brackets against the plumb lines and attach brackets securely to the wall Bearing see Figure 9a Bracket ree Horizontal Track L Rope 2 Rs zJ Hi Lift Vertical Track Sp CA Bracket ia JI Vertical SS Figure 9a all Track STEP 10 HORIZONTAL TRACK SUPPORT Replace temporary support hangers with steel support angle not supplied Install sway braces only after checking the horizontal track with a tape measure or spacing bar to verify that they are parallel Important steel support or other means must be strong enough to support full door weight and must be attached to a structurally sound member Note a center horizontal track Support is required for doors larger than 12 1 in height see Figure 1 Item A on page 1 Ceiling Angle A 7 Note Hanging Horizontal track Angle of 6 slopes upward ee d E per foot toward the rear of door Sway Brace Figure 10 Rev 5 12 Plumb Line 2012 Haas Door Company STEP 9b VERTICAL LIFT TRACK Place upper vertical track on top of lower vertical track Plumb track and attach to wall in same manner as lower vertical tracks Heads of ma
14. ladder so that winding cone is either to your right or to your left Never stand directly in front of winding cones or winding bars With one hand insert one winding rod all the way into the hole of the winding cone and wind the spring up one quarter turn With your other hand insert the second winding bar into the next hole remove the upper winding bar and then take another one quarter turn Proceed in this man ner until you have made all the required number of turns The number of turns are indicated on the spring tag attached to the spring assembly For example if the tag says wind spring 7 turns 7 x 4 28 one quarter turns are required to balance Note each complete turn will cause the chalk line to make one spiral After the requred number of 1 4 turns have been made tighten both set screws in the winding cone to secure it to the shaft before removing the winding bars Repeat this procedure for each spring then locking pliers can be removed Attach one red warning label to spring Rev 5 12 2012 Haas Door Company 7 Haas Door Commercial Instruction Manual STEP 19 CYLINDER LOCK INSTALLATION If lock cylinder is supplied install in lock section as shown in the exploded view see Figure 22 Outside Handle spring q Lock Bar w Cam Cyliner Lock Q Figure 22 Handle Boti l AN Night Latch Qutside Drill 2 5 16 holes Figure 23 STEP 20 LIFT HANDLES Install lift handle s on bottom se
15. m Wind the excess cable on the drum then slide the drum against the bearing plate and tighten the two set screws securing the drum to the shaft Clamp a set of locking pliers with the jaws locked onto the shaft and the other end against the wall so that cable tension On the drum is taut no slack and the shaft locked Secure the remaining drum making sure both cables have equal tension and are taut_ See Figure 20 If axle is a solid shaft use a 1 4 key for both drums Cable Right side shaft Locking Winding Bracket 7 Axle i P Winding Bar STEP 17 Figure 20 Figure 21 Before going to Step 18 Be sure door is in locked position If no lock is supplied place a clamp in both tracks of door directly above a roller to make sure door can not be raised at this tlme STEP 18 WINDING SPRING see Figure 21 Note garage door springs can cause serious injury if not handled properly Before winding the springs make sure the lock is engaged in the locked position This will prevent the door from raising up by itself in the event the springs are over wound or are too strong Use two cold rolled steel rods approximately 18 long and the same diameter as the holes in the winding cones winding rods not furnished 1 2 dia for 1 3 4 amp 2 5 8 springs and 5 8 dia for larger springs Do not use undersized rods or other tools to wind springs For your safety position yourself on a sturdy
16. mpany warrants its commercial CMT 600 CHT 700 CHT 2000 and CHT 800 series steel garage door sections to be free from delamination or rust through for a period of 10 years to the original purchaser of the building where the door sections are installed All other components are warranted to be free from defects in workmanship and material for a period of one 1 year from date of installation This ten year Warranty applies only to steel garage door sections manufactured by Haas Door Company and components manufactured or supplied by Haas Door Company The warranty excludes 1 Sections and or component parts which have been damaged due to misuse 2 Sections and or components which have been improperly installed maintained or operated 3 Sections and or components that have been damaged due to accident 4 Sections and or components that have been damaged due to exposure to salt environments including coastal areas corrosive fumes chemicals alkaline cleaning agents condensation or fire 5 Repair and or replacement labor charges including travel cost 6 Cool Black color 7 Damages resulting from other causes beyond the manufacturers control In the event any defect is claimed during the warranty periods a claim in writing must be submitted to Haas Door Company directed through an authorized Haas Door Company dealer or installer This claim must be submitted within fifteen 15 days of the discovery of the suspected defect The door and
17. rticularly in consumer transactions so the above limitations or exclusions may not apply to you TECE THIS WARRANTY IS NOT TRANSFERABLE Haas 2012 Haas Door Company Door Effective June 4 2012 Revised July 12 2012 A ziger Company evised July 0

Download Pdf Manuals

image

Related Search

Related Contents

Honeywell UV100E 2009 Air Purifier  Manuals / Full version / User manual wired  Norgen DNA Purification Guide  Traduction du Catalogue NOCH 2015  EXTER T150-st Installation Manual  Sistema de transmisión trasero  

Copyright © All rights reserved.
Failed to retrieve file