Home

SPRAYING BOOM ECO BDM

image

Contents

1. 4 2 4 ATTACHMENTS UPON 4 SAFETY INFORMATION 3 1 GENERAL SAFETY 8 9 5 HANDLING AND LOADING 41 TRANSPORTATION PACKAGING AND 6 4 2 LOADING AND UNLOADING 6 4 3 INSTALLATION OF THE DISASSEMBLED 1 21 1 12 100 000000 7 4 3 1 Boom Structure INStallatiOn ce ssssesssseseeeeeceeeeceeeecececeeeecesessuseaeseasaseaeaseeeececeeeeeseeees 7 4 3 2 Water system Installation 8 44 REAR LIGHTS INSTALLATION IF 02 2 000000 00 14 ADJUSTMENT AND SETTING UP THIS INFORMATION IS NOT CURRENTLY SUPPLIED USE AND OPERATION 6 1 UNFOLDING AND FOLDING OF THE SPRAY BOOM 15 EQUIPMENT MAINTENANCE TA DAILY MAINTENANCE 3 00 00 16 7 2 ROUTINE MAINTENANCE EVERY 40 8 2 16 7 3 UNSCHEDULED 222 22000000 0000 16 TAST WINTER STOP ee eed ee 16 368 005 F Ec 0 368 005 0 1 1 GENERAL INFORMATION DA Read carefully this manual before servicing the equipment PURPOSE OF THE MANUAL This manual has been
2. Keep this service manual to hand during the machine equipment s working life SPRAYING BOOM ECO BDM user manual ENGLISH Translation of original instructions Serial number Edition 1 1 7 11 2006 INDEX Booklet SPRYING BOOM 9 No part of this publication may be reproduced without the permission in writing of the Manufacturer The Manufacturer follows a continuous improvement policy and reserves the right to change this document without notice provided that such changes do not imply risks to safety via della Cooperazione 20 40026 IMOLA ITALY tel 390542648511 fax 390542640539 SISTEMA www bargam com e mail salesimola bargam com SI 3065 UNI ISO 9001 2000 INDEX GENERAL INFORMATION 1 14 1 1 2 MANUFACTURER S IDENTIFICATION AND 2 1 3 LIST OF THE ANNEXES 2 2 4 4 0 2 TECHNICAL INFORMATION 2 1 GENERAL DESCRIPTION OF THE SPRAYING 3 2 2 TECHNICAL 3 2 3 gt AANE
3. 368 005 F 0 4 HANDLING AND LOADING Displace the boom structure 20 mm to the right with respect to the tank unit uprights and position it as shown in fig 3 tighten the U bolts A nuts 4 3 2 Water system Installation Should the filters be supplied fit them aligned as shown in fig 4 making sure the arrow on the filter case is turned downwards BDM 6 8 10 12 ECO BDM 14 15 16 18 m HANDLING AND LOADING 4 Check the assembly position of the jet nozzle bodies according to the boom length as shown in figure 5 4 4 4 5 4 4 12 14m 4 15m 4 4 16 m e 4 5 18m 368 005 F Ec 0 368 005 0 4 HANDLING AND LOADING Fit nozzle bodies A fig 6 onto pipes B IDM 05 008 Ec 0 Legend 1 Uni jet nozzle body supplied with quick coupling 2 Uni jet nozzle body supplied with threaded head 3 Tri jet nozzle body supplied with quick coupling 4 Quadri jet nozzle body supplied with quick coupling Fasten pipes B and protections C if supplied to the spraying boom as shown in figure 7 UNI GET 005 009 Ec 0 HANDLING AND LOADING 4 Fit guard bands A as shown in figure 8 IDM 05 020 0 Connect the water hoses as shown in the figures below 3
4. GENERAL INFORMATION 1 2 MANUFACTURER S IDENTIFICATION AND EQUIPMENT fig 1 A Manufacturer identification Model Total weight D Year of construction E Manufacturing order number 368005001 01 tif 1 3 LIST OF THE ANNEXES ENCLOSED More detailed information relevant to the units which can be assembled to this equip ment if fitted is to be found in the annexes 2 TECHNICAL INFORMATION 2 1 2 2 IDM 05 002 Ec 0 GENERAL DESCRIPTION OF THE SPRAYING BOOM The spraying boom has been designed and manufactured for an agricultural use more precisely to spray either the ground or the crops through spraying nozzles This equipment can be directly fitted either on the height adjustment device or on the balancing device It is divided into more sections which can be manually folded at the rear part thus reducing the dimensions during the equipment transfer TECHNICAL SPECIFICATIONS Width Weight Qty Jets ee A ES 6 360 24 12 1980 160 8 1880 280 390 42 16 10 2070 280 390 48 20 12 2480 300 430 68 24 14 2210 330 680 93 28 15 2490 330 680 110 30 16 2490 330 680 110 32 18 2770 330 680 130 36 368 005 F Ec 0 368 005 0 2 TECHNICAL INFORMATION 2 3 SAFETY DEVICES fig 3 4 The spraying boom is supplied with locking devices preventing the accidental open ing of the boom sect
5. section spraying boom with feedings fig 9 IDM 05 021 0 368 005 F Ec 0 HANDLING AND LOADING 4 5 section spraying boom with feedings fig 10 5 section spraying boom with 5 feedings fig 11 HANDLING AND LOADING 4 7 section spraying boom with 5 feedings fig 12 368 005 F 0 4 HANDLING AND LOADING 4 4 REAR LIGHTS INSTALLATION IF FITTED Position the rear lights kit A as shown in fig 13 fastening it through U bolts B REAR LIGHT KIT FOR MOUNTED TANK UNIT REAR LIGHT KIT FOR TRAILED TANK 6 USE AND OPERATION 6 1 UNFOLDING AND FOLDING OF THE SPRAY BOOM For safety purposes carry out the following operations before unfolding and folding the boom lower the tractor height adjuster turn off the tractor engine engage the parking brake remove the ignition key taking it away Make sure that the locking device if available of the balancing device is engaged see booklet D QO Spraying boom unfolding Disengage the boom locking A fig 1 CAUTION the spraying boom must be gripped in those points marked by IDM 05 016 0 the relevant plate Remove the locking devices and unfold the boom according to the sequence shown in figure 2 as far as 5 section booms are concerned and figure 3 as far as 7 section booms are concerned IDM 05 011 Ec 0 IDM 05 012 Ec 0 D
6. drafted by the Manufacturer and it is integral part of the equip ment This manual contains both the information relevant to the procedure of operating the equipment and the safety information Said information is aimed at the professional user operator who in addition to a specific skill relevant to the driving of the tractor on which this equipment is fitted must also have acquired a certain experience in the field for which this equipment has been designed and manufactured Furthermore a generic mechanical experience and an agricultural mechanics skill are of the utmost importance to allow the user either to fit the equipment or to carry out adjustment and maintenance operations in safe conditions This manual defines the purpose for which the equipment has been designed and manufactured and contains all the information necessary to ensure a safe and cor rect operation Some important parts of the text have been highlighted and preceded by the symbols shown and defined below DANGER WARNING it shows an impending danger A which might cause serious injury give it the greatest ______ attention CAUTION it points out situations requiring a particular procedure to avoid accidents or damages to property Important technical information In pursuing a policy of constant development and updating of the product the manu facturer might introduce changes to the equipment without any prior notice 368 005 0 1
7. ions during the transfer or whenever working with the boom par tially folded The safety devices change in accordance with the boom model locking devices for 5 section boom fig 3 locking devices for 7 section boom fig 4 IDM 05 004 0 2 4 ATTACHMENTS UPON REQUEST Complete protection kit It protects the nozzle bodies from breaking due to the impact with the ground or with the crops to be sprayed 2 SAFETY INFORMATION 3 1 GENERAL SAFETY REGULATIONS Read carefully this operation and maintenance instruction manual before carrying out any installation starting operation adjustment maintenance etc 0 Installation maintenance adjustment any other servicing must be carried out with the safety devices activated if fitted previously turning off the tractor and removing the ignition key Non authorised personnel shall not be allowed to carry out any repair maintenance or other servicing operation on the equipment Unscheduled maintenance and repairs must be carried out in well equipped work shops Any change introduced to the equipment must be previously authorised in writing by the manufacturer Q Remove dangling clothes which might entangle into the running parts Q As far as road circulation is concerned the equipment must be supplied with the safety devices in compliance with the Motor Vehicle Regulation in force in the user s country QO Should it be necessar
8. isengage the locking device if available of the balancing device see booklet D QO Folding of the spraying boom Carry out the above described operations in reverse order fit the relevant locking devices 6 15 5 gt gt gt gt gt gt gt 368 005 0 368 005 0 7 EQUIPMENT MAINTENANCE 7 1 7 2 7 3 7 4 A careful and constant maintenance ensures a good working and a long life of the equipment DAILY MAINTENANCE Cleaning the equipment at the end of each working day or whenever the equipment is stopped for a period of time exceeding one hour rinse it let the water flow from the nozzles see annex A and clean the equipment through a strong water jet Nozzle body and nozzles check make sure nozzles are fastened to the nozzle bodies which in their turn must be fastened to the piping furthermore make also sure the antidrip valve is well tight ened As far as threaded nozzle bodies are concerned make sure the nozzle slot angle is turned of 5 with respect to the piping otherwise reset the value ROUTINE MAINTENANCE EVERY 40 HOURS Check the efficiency and tightening of the bolts Retouch the damaged painted components UNSCHEDULED MAINTENANCE Nozzles cleaning A CAUTION always wear protective gloves To remove clogging from the nozzles if any clean them with a compressed ai
9. r jet or with a soft bristle brush Never use sharpened or pointed tools WINTER STOP Before the equipment is put away for the winter stop carry out all the cleaning and maintenance operations as described in 7 1 7 2 and 7 3 If the circuits have not been protected with antifreezing fluid empty the piping nozzle bodies and nozzles to prevent ice from damaging the circuit components when severe temperature arises
10. y to replace parts always ask for original spare parts 368 005 F Ec 0 368 005 0 4 HANDLING AND LOADING 4 1 TRANSPORTATION PACKAGING AND UNPACKAGING The equipment can be shipped by road by train by ship The equipment is fixed to a pallet through straps and protected by thermoretractable cellophane to be removed through suitable tools before carrying out the installation 4 2 LOADING AND UNLOADING DANGER WARNING Lifting and handling operations must be carried out through suitable means and by skilled personnel IDM 05 026 Ec 0 Use a fork lift device to be positioned as shown in figure 1 Slowly lift and handle the equipment avoiding any impact HANDLING AND LOADING 4 4 3 4 3 1 INSTALLATION OF THE DISASSEMBLED PARTS Preamble The spraying boom is supplied partially disassembled since the water system must be assembled after the boom structure has been fastened to the tractor mounted tank Follow the instructions below to carry out a correct installation and assembly of the spraying boom Boom structure Installation According to the models annex C the boom structure can be directly installed on the slider kit on the slider kit supplied with spacer or on the balancing device annex D Should the boom be installed on the balancing device Lift the boom structure fig 2 and fasten it through U bolts A without tightening it

Download Pdf Manuals

image

Related Search

Related Contents

Samsung HU-6033 User Manual  Termómetro registrador de datos manual con cuatro canales Interfaz  Mode d`emploi  Notice Horloge multi-alarme.  Connection Box TCS 010 Operating Instructions  Détection radar simplifiée.  Rahier , Le Trait d`Union, numéro 42 `avril 2012  Sony Ecm-Alst1 User's Manual  Samsung ED40C Kullanıcı Klavuzu  lMAGN UMWT  

Copyright © All rights reserved.
Failed to retrieve file