Home

Operation and Installation Manual for

image

Contents

1. P h F h b 4 gt 10 cm p q ri 4 Fig 7 2 Mounting clearances for correct convection gt Avoid heavy soiling Dust can impair the performance of the device gt Protect the solar power inverter from heavy rain and snow deposits 7 1 3 Consideration of Asymmetrical Grid Load The 3 phase solar power inverters have integrated grid load bal ancing This ensures that the fed in power is always distributed equally across all phases EN Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 21 7 Installation 7 2 Attaching the Solar Power Inverter Awane OOO A Risk of injury due to weight The solar power inverter is very heavy see 15 Technical data p 83 Improper handling may result in injury gt The solar power inverter must be lifted and carried by at least two people 7 2 1 Required Tools and Accessories Included in delivery Mounting plate lo ol Mounting nuts and washers 2 pcs each for mounting the solar power inverter to the mounting plate Retaining clip Not included in delivery Screws 96 mm dowels for attaching the mounting plate to the wall At least four screws are required Drill and drill bits suitable for the wall material and size of the dowels Sc
2. Fig 13 1 Replacing the fan 1 Unplug the fan plug Pull out the four fan retainers Remove the fan Fit the new fan Press in the four fan retainers oa F oO DN Plug in the fan plug Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 81 14 Decommissioning Transport Storage Disposal 14 Decommissioning Transport Stor age Disposal DANGER Risk of death or serious injury from electro cution gt Disconnect the solar power inverter from power before removing or inserting the AC plug Ah DANGER Risk of death or serious injury from electro cution Potentially fatal voltage may be applied to the DC connections of the solar power inverter gt Never disconnect the PV modules when the solar power inverter is powered First discon nect the solar power inverter from power so it can no longer feed energy Then open the DC switch gt Make sure the DC connections cannot be accidentally touched Risk of injury due to weight The solar power inverter is very heavy see 15 Technical data p 83 Improper handling May result in injury gt The solar power inverter must be lifted and carried by at least two people 141 Decommissioning Disconnect the solar power inverter from power Open the DC isolating switch Unplug all cables from the solar power inverter Unscrew the solar power inverter f
3. Only for DE LVD and E Inverter Info DK LVD grids 710 Software Vers 720 Inverter Data 800 Standard Menu Menu number 510 Active PwCtrl Power reduction 511 Power reduction Power vs freq a P 512 Power vs freq 520 Reactive PwCtrl Start freq disabled Stop freq Fix cosPhi Gradient Cos phi P Q U S or Only for DE MVD grid Fixed Q lt 530 FRT Settings Only for DE MVD grid Mode k factor DeadBand Vh DeadBand V1 FRT delay t Max I sym Max I asym Operation and Installation Manual for SOLIVIA 10 11 EU G4 TR 87 EN 16 Appendix 400 Production Info 410 Current Data 420 Day Statistics 430 Week Statistics 449 Month Statistics 450 Year Statistics 460 Total Statistics 470 Feed In Settings 4809 Event Journal 4909 History O 471 Statistics Reset Day Stat Reset Week Stat Reset Month Stat Reset Year Stat Reset Total Stat Reset History 491 Day 1 Energy Runtime Revenue L1 Af L2 Af L3 Af L1 Imax L2 Imax L3 Imax L1 AU L2 AU L3 AU L1 Pmax L2 Pmax L3 Pmax L1 Qmax L2 Qmax L3 Qmax L1 Qmin L2 Qmin L3 Qm
4. Li 44 Li dus aude da da be ee A De 6 1 4 Conventions Used in This Document 6 1 4 1 Order of INStructionS 2 20 20406 a0 e222 OAS Pewee REE De him Ewe de E 6 1 4 2 User buttons and LEDS sans os RE A A du 6 1 4 3 Information On DiSpla cier EE a a E A LE Ra KA 6 2 Intended PURPOSE s aanu a a A A a A Re AA 06 GS a oa 7 3 General safety instructions sacs cuss srad aa nu ta ou a ee we 8 4 UNPACKING es w 28 2 we e da dede date ne are ca neue ie a ee ou de de ae de D eut 9 5 Product Description 4 as Manuela aan ans messes ee ae i o e e Y 10 5 1 Overview of Components and Connections 10 5 2 Type plates LES 2226650444484 2464 bee Aa AEE PERG DS 11 5 3 slatus LEDS i 42 e e o E DEER ee Rhee Pew ee RARE TERRE 12 5 4 Display ANA Buttons 2 40 0 202 eee San ee ER ew dame ee ta eee RE d 12 5 4 1 OVGEIVIEW RSS D a2 Sink amp Bee o ee oe die ie OL we Ae eo 12 5 4 2 Display Layout ie a kee EE eee A ORE RE RES De ee Be EA 12 5 4 3 BUUONS 44 Le pee ESR be bee SPREE PR bee Sew Eee be Coe BER EL Bes 12 5 4 4 General Menu Structure a A en OR 4 a eo A one eh af a a 12 5 4 5 Go to Menu TUNCHON 42 2 oa SF Pe a RM AE oe aR E A ER ee ee 13 5 4 6 Button combinallons lt s s usa we eka Aon ee hh She o a Ns Bs nn e a 13 5 4 7 Navigating the Men s ze ed rasan ee ee es ta 8 RARE dodet ee EURE wR ee 4 13 5 4 8 Sele
5. PDD settings Settings for the internal grid and system protection formerly known as ENS Denmark Germany based on VDE AR N 4105 for low voltage grids or BDEW for medium voltage grids The settings you make here depend on how the PV system is connected to the grid supply If in doubt as your energy provider Blocked power limitation In some cases energy providers demand a limit to active or apparent power For All example in Germany a limitation of the active power of 70 can be demanded or the system must not exceed a maximum asymmetric grid load You normally do not need to change the default values however Display format for date and Select the required display format All time Date and time Configure the date and time correctly to ensure that the statistics are displayed All correctly Settings for RS485 When you connect the solar power inverter to a monitoring system you can All change the standard settings for the RS485 interface in this step 30 Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 8 Commissioning 8 3 The solar power inverter must be newly installed Selecting the Correct Commissioning Procedure Country Grid as shown Description Applicable Commissioning Procedure on display Belgium BE C10 11 12 Synergrid C10 11 2012 8 4 Commissioning for grids as per EN 50438 EN Bulgaria BG VDE
6. of that inverter has been limited to HH HW 4H HKVA Power balancing is activated The maximum power 4 131 View grid setup In the main menu press the buttons to select Install Settings and then press the button Press the buttons to select Grid Selection and then press the button Press the buttons to select View Grid Setup and then press the button Depending on the current grid settings different messages may be dis played first When the messages are dis played press the button to confirm each You can view the whole list by pressing the buttons 80 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 13 Maintenance and Repair 13 Maintenance and Repair Risk of death by electrocution Hazardous voltage is applied to the solar power inverter during operation This potentially fatal voltage is still present for five minutes after all power sources have been disconnected gt Never open the solar power inverter The solar power inverter contains no components that must be maintained or repaired by the operator or installer Opening the cover will void the warranty NOTE The solar power inverter contains no compo nents that are to be maintained by the operator or installer 13 1 Replacing the fan The fan can be replaced by the operator if it is not working cor rectly E EJ EJ EJ
7. 14 5 A per phase 16 A per phase Maximum current 20A 20A Rated frequency 50 Hz 50 Hz Frequency range 50 Hz 5 Hz 50 Hz 5 Hz Power factor cos q gt 0 99 at rated apparent power gt 0 99 at rated apparent power Power factor configuration area Total harmonic distortion THD 0 8 cap 0 8 ind lt 5 at rated apparent power 0 8 cap 0 8 ind lt 5 at rated apparent power Nighttime consumption lt 1 3 W lt 1 3 W Typical leakage current lt 3 5 mA lt 3 5 mA Overvoltage category ll ll 9 At cos 1 VA W 2 AC voltage and frequency ranges are programmed according to the respectively applicable national regulations Standards Guidelines SOLIVIA 10 TR SOLIVIA 11 TR Degree of protection IP65 IP54 IP65 IP54 Safety class l Configurable switch off parameters Yes Yes Isolation monitoring Yes Yes Overload behavior Current limiting power limiting Current limiting power limiting ENS grid connection guidelines DIN VDE 0126 1 1 VDE AR N 4105 low voltage directive Synergrid C10 11 July 2012 DIN VDE 0126 1 1 UTE C15 712 1 France islands 60 Hz RD 661 2007 RD 1699 2011 RD 1663 2000 Synergrid C10 11 July 2012 EN 50438 G59 1 2 VDE AR N 4105 BDEW EMV EN61000 6 2 EN61000 6 3 EN61000 6 2 EN61000 6 3 EN61000 3 11 EN61000 3 12 EN61000 3 11 EN61000 3 12 Safety IEC62103 IEC62109 1 2 IEC62103 IEC62109 1 2
8. 6 Mode Fixed Q PQ Sn ind 0 Configurable Parameters In the main menu press the buttons to select User Settings and then press the button Press the button to confirm Press the buttons to se lect Reactive PwCtrl and then press the J button Press the buttons to select Mode and then press the button Press the buttons to set Mode to Q and then press the button Press the buttons to select the parameter Q Sn Press the button to change the value Display Text Designation Description Q Sn Ratio Q S Relationship of reactive power with rated apparent power inductive capacitive 60 60 60 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 10 Settings 10 10 5 Q U Menu 520 Reactive PwCtrl Description This function is available for the grid DE MVD With this function the relationship Q S reactive power to rated apparent power can be set based on grid voltage U USA High Q Sn Inductive Y Low Ulim High Ulim IV Capacitive Low Q Sp Fig 10 6 Example Q U curve Accessing the Menu Main Menu gt User Settings gt Reactive PwCtrl In the main menu press the buttons to select User Settings and then press the button SOLIVIA 1 Production info PUser settings Diagnostic amp Alarm Changes could affect 2 energy producti
9. Italy supporto italia solar inverter com 800 787 920 Free Call Netherlands ondersteuning nederland solar inverter com 0800 022 1104 Free Call www solar inverter com Austria service oesterreich solar inverter com 0800 291 512 Free Call Portugal suporte portugal solar inverter com 49 7641 455 549 Switzerland support switzerland solar inverter com 0800 838 173 Free Call Slovakia podpora slovensko solar inverter com 0800 005 193 Free Call Slovenia podpora slovenija solar inverter com 421 42 4661 333 Spain soporto espana solar inverter com 900 958 300 Free Call Czech Republic podpora czechia solar inverter com 800 143 047 Free Call United Kingdom support uk solar inverter com 0800 051 4281 Free Call Other European countries support europe solar inverter com DELTA
10. Operation and Installation Manual for SOL10 0 1TR3 E4 SOL11 0 1TR3 E4 DELTA This manual applies for solar power inverters with the model ID e SOL10 0 1TR3 E4 e SOL11 0 1TR3 E4 This manual can be amended at any time The latest version of this manual is available at www solar inverter com Delta Energy Systems Germany GmbH TscheulinstraRe 21 79331 Teningen Germany Copyright Delta Energy Systems Germany GmbH All rights reserved This manual is included with our solar power inverter and is intended for use by the installer and end user The technical instructions and illustrations in this manual are to be treated as confidential and no part of this manual may be repro duced without prior written permission from Delta Energy Systems Maintenance technicians and end users may not release the infor mation contained in this manual and may not use it for purposes not directly associated with the proper use of the solar power inverter All information and specifications can be modified without prior notice Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 Table of Contents Table of Contents 1 About This Manual 542 ie ei ee ee a ee a a es a a a 6 1 1 Purpose of This Manual zer se Be Bonn fe See BOA ae Ge a st d a Bon gi go A ig ge a A ae i 6 1 2 Targetauidience of this manual r eac cue ee AB A Re ae ke ee 6 1 3 Wamings and Symbols
11. e Use in mobile PV systems Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 EN 3 General safety instructions 3 General safety instructions Risk of death by electrocution Potentially fatal voltage is applied to the solar power inverter during operation This potentially fatal voltage is still present for five minutes after all power sources have been disconnected gt Never open the solar power inverter gt Always disconnect the solar power inverter from power before installation open the DC isolating switch and make sure neither can be accidentally reconnected gt Wait at least five minutes until the capacitors have discharged Risk of death or serious injury from electro cution Potentially fatal voltage may be applied to the DC connections of the solar power inverter gt Never disconnect the solar modules when the solar power inverter is under load gt First switch off the grid connection so that the solar power inverter cannot feed energy into the grid Then open the DC isolating switch Make sure the DC connections cannot be accidentally touched vv The solar power inverter can be safely and normally oper ated if installed and used in accordance with this manual see IEC 62109 5 3 3 Delta Energy Systems is not responsible for damage incurred by failure to observe the installation and operating instructions in this manual For this reason be
12. p 52 If you press the buttons 4 and 7 the standard menu is displayed In the menu 800 Standard Menu you can define the standard menu see 10 14 Standard menu p 63 400 Production info Current data Day statistics 5 4 9 Exiting a Menu gt Press the E button to return to the higher menu 400 Production info Current data Day statistics la gt ESC SOLIVIA USB features gt Production info User settings Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 13 5 Product Description 5 4 10 Setting Values You can set various parameters on the display Use the but tons to change the parameter values The 1 button increases the value of the parameter The J button decreases the value of the parameter The button can be used to cancel the setting and the original value is then displayed The button applies the new parameter value The example on the next page illustrates the procedure for chang ing the value of a parameter Example Setting the date Buttons Action Result ESC 1 Press the ESC button until the main menu is displayed In the main menu select Install Settings using the buttons SOLIVIA 2 2 E D 1 gt gt E a A gt 2 E E D t N E e X 1 gt am
13. 110 Date and time 3 gt Date 25090512012 Time 1426421 In the main menu press the buttons to select Install Settings and then press the button Press the buttons to select Date and Time and then press the f button Select a parameter with the buttons Press the but ton to change the value Display Text Designation Description Date Date Freely configurable according to the selected date format Time Time Freely configurable according to the selected time format EN Allows the date and time formats to be configured Accessing the Menu Main menu gt Install settings gt Date and time gt For mat SOLIVIA 1 Install settings Options 100 Install settings 2 Language English Date and time Display settings 110 Date and time 3 Time Laos Ph Format aaa Format 4 gt Date DD MM YYYY Time 24h Configurable Parameters In the main menu press the buttons to select Install Settings and then press the button Press the buttons to select Date and Time and then press the button Press the buttons to select Format and then press the button Select a parameter with the buttons Press the J but ton to change the value Display Text Designation Description Date Date format DD MM YYYY DD MM YYYY DD MM YYYY MM DD YYYY MM DD YYYY MM DD YYYY YYYY MM DD YYYY MM DD YYYY MM DD Time Time format 1
14. 130 Grid selection View grid setup PGrid change Custom country 132 Grid change Key HHEH HH HHHH H PPIN 0000 Grid UK G59 2 the buttons to select Standard Menu and then press the button Press the buttons to select Grid Selection and then press the button Press the buttons to select Grid Change and then press the button Communicate the key to Delta Solar Support After receiving the PIN open the menu and enter the PIN You can now change the grid 64 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 11 Saving and loading data and settings 11 Saving and loading data and set tings The IP 65 degree of protection is no longer guar anteed when the USB interface protective cover is removed gt Only remove the protective cover when necessary gt Where possible use a Micro USB stick The protective cover is designed to be screwed down over a Micro USB stick 11 1 Before you begin Information on operating the display is provided in 5 4 Display and Buttons p 12 Data and settings can be saved and loaded via the solar power inverter s USB interface All saving and loading functions are available under the 300 USB features menu The following functions are available e Save swap data e Save load settings e Create reports NOTE The swap data can be loaded only during com missioning see 8 8 Commissioning a
15. 15 EN 5 Product Description 5 5 Electrical connections 5 5 1 Overview O O O IN FAN mi AC O UTPUT e 70 Q O O Fig 5 7 Electrical Connections No Designation Description DC Connections 5 5 2 DC connections and DC isolating switch p 17 AC Connection 5 5 3 AC connection p 17 Fan connection 5 6 Fan p 17 O 2 x RS485 interfaces 5 5 4 RS485 interface EIA485 p 17 O USB Interface 5 5 5 USB interface p 17 Not used DC Isolating Switch 5 5 2 DC connections and DC isolating switch p 17 16 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 5 Product Description 5 5 2 DC connections and DC isolating switch Fig 5 8 DC connections and DC isolating switch The DC connections are used for connecting the PV module string s to the solar power inverter The integrated DC isolating switch can separate the solar power inverter from the DC voltage of the PV modules The maximum permissible input current is 29 A for each DC con nection Connection type Multi contact MC4 connector paired plug DC and socket DC 3 pairs 5 5 3 AC connection The AC connection is used for connecting the solar power inverter to the grid The solar power inverter can be connected to a grid with 3 phases and a grounded star p
16. 4 IP65 for electronics IP54 for cooling area Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 83 15 Technical data Mechanical details SOLIVIA 10 TR SOLIVIA 11 TR Dimensions L x W x D 685 x 410 x 185 mm 685 x 410 x 185 mm Weight 39 kg 39 kg Cooling Fan Plug amp Play Fan Plug amp Play AC Connection Amphenol C16 3 Amphenol C16 3 DC connection 3 pairs MultiContact MC4 3 pairs MultiContact MC4 Communication interfaces DC Isolating Switch 2x RJ45 RS485 1x USB 1x I O interface Integrated 2x RJ45 RS485 1x USB 1x I O interface Integrated Display 3 LEDs 4 line LCD 3 LEDs 4 line LCD General Specifications Model name SOL10 0 1TR3 E4 SOL11 0 1TR3 E4 Delta part number EOE47030453 EOE48030469 Max efficiency 96 8 96 8 EU efficiency 95 6 95 6 Max operating temperature range 25 70 C 25 70 C Operating temperature at full power without throttling 25 58 C 25 55 C Storage temperature range 25 80 C 25 80 C Humidity 0 95 0 95 Max operating height 2 000 m above sea level 2 000 m above sea level 84 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 16 Appendix 16 Appendix 16 1 Order numbers Grounding kit EN The ground connection must be installed near the solar power inverter We recommend usi
17. 8 1 Inductive cos point B 0 8 1 cos p Power ratio P P Inductive cos q Inductive cos point D point C 0 8 1 0 8 1 1 8 o Capacitive cos Capacitive cos Capacitive cos Capacitive cos y point D point A point B 0 8 1 point C 0 8 1 0 8 1 0 8 1 08 2k tk l 0 8 Power ratio point B Power ratio point C 1 49 50 99 Power ratio point A 0 Power ratio point D 100 cannot be changed cannot be changed Fig 10 3 Setting Ranges for cos y P Function 58 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 10 Settings Example The parameters for points A to D are configured in this example as follows Display Text Description A cos phi ind 1 00 Point A cos is set to inductive 1 00 Since cos q 1 00 capacitive could also be configured The power ratio P Pn is automatically set to 0 and cannot be changed B cos phi ind 95 Point B cos q is set to inductive 1 00 Point B Power ratio P Pn is set to 23 B P Pn ratio 23 Point C cos is set to capacitive 1 00 C cos phi cap 0 90 Point C Power ratio P Pn is set to 75 C P Pn ratio 75 D cos phi cap 0 95 Point D cos e is set to inductive 0 95 The power ratio P Pn is automatically setto 100 and cannot be changed This results in the following behavior
18. Active power control p 56 and 10 10 Reactive Power Control p 58 gt Ifthe solar power inverter is configured to the DE LVD DK LVD or DE MVD grids you can also configure active and gt The solar power inverter offers some optional functions available for all grids see 10 Settings p 52 gt On completion of commissioning save the settings see 11 5 Saving settings p 68 and the swap data see 11 7 Saving swap data p 70 on a USB stick so that you can use this information later 46 Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 9 Production information 9 Production information NOTE All production information is provided for orienta tion purposes only The measuring devices and meters provided by the electricity supply com pany are the authoritative source of information for invoicing 9 1 Overview Menu 400 Product Info Description Contains all production data arising since first commissioning of the solar power invertor and the current production data Accessing the Menu Main Menu gt Production Info SOLIVIA 1 USB features PProduction info Diagnostic amp Alarm In the main menu press the buttons to select Produc tion Info and then press the button 409 Production info 2 Press the buttons to se lect the required statistics and PCurrent data then press the button Day statistics Str
19. Change Events SOLIVIA 4 USB features PProduction info Diagnostic amp Alarm In the main menu press the buttons to select Produc tion Info and then press the button Press the buttons to select Event Journal and then press the f button 400 Production info 2 Feed in settings PEvent journal History Press the buttons to se lect Change Events and then press the button 489 Event journal 3 External events PChange events You can view the whole list by 482 Change events 4 pressing the buttons AAEE el EE ERT ise E Max power 100 Max power 90 Message Structure Each message consists of three lines defined as follows 482 Change events 6011217253605 Max power 100 Max power 90 Date and time when the external event occurred 1 Line Source of the change D Display E External RS485 U USB Interface S System 3 Line Name of the changed parameter and previous value Name of the changed parameter and new value 4 Line The current grid settings can be displayed using 131 View Grid Setup The contents of this menu are write protected Accessing the Menu Main menu gt Install settings gt Grid selection gt View grid setup SOLIVIA 1 Install settings Options 100 Install settings 2 Display settings PGrid selection RS485 130 Grid selection 3 gt View grid setup Grid change
20. DC electricity component of AC current for phase L1 48 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 9 Production information Submenu Display messages Displayed values Example display and description 414 Current data L2 415 Current data L3 Same information for phase L2 as in menu 413 Current Data L1 Same information for phase L3 as in menu 413 Current Data L1 414 Current data L2 L2 Voltage M E2 Current MAMA E2R REMRE es lz 415 Current data L3 EN L3 Voltage MIN ESRGURE ente MAMA BSAEDeanE Baz 416 Current data PV PV1 voltage Current DC voltage on MPP tracker 1 PV1 current Current DC current on MPP 416 Current data PV PMA Koala O O W tracker 1 24 cuarteles YA 41A Date and Time Date Current date Aa bakia Ela elas Time Current time Date 25 05 2012 Time 14426451 Use the 110 Date and Time menu to set the values see 10 3 Date and time D 53 41B Actual isolation R iso Current insulation resistance for 41B Current isolat DC DC PLUS ss 0 0 0 00 R iso Current insulation resistance for DC DC MINUS RASE ERPORE R iso kQ Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 49 9 Production information 9 3 Other statistics Sub menus 420 Day Statistics 430 Week Statistics 440 Month Statistics 450 Ye
21. DD YYYY MM DD Available time formats 12h 24h Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 39 8 Commissioning Date and time Time IA Pays Pil Ph continue PID 1 RS485 Termination On Pr continue ENTER to confirm ESC to reselect 17 18 19 20 v Press the buttons to select continue and then press the button The RS485 menu is displayed To change the value press the J button and then set the value using the buttons Press the J button to apply the value Press the buttons to select continue and then press the button The completion screen will be displayed Press the button to complete commissioning or Press the E button to change settings Commissioning is now finished NOTE If multiple solar power invert ers are to be connected via RS485 select a different ID for each inverter The ID is also used when saving and loading settings in order to identify the solar power inverter Available IDs 1 254 Available baudrates 2400 4800 9600 19200 38400 Configuration option RS485 termina tion resistor On Off NOTE If the solar power inverter is configured to the DE LVD DK LVD or DE MVD grids you can also configure active and reactive power control see 10 9 Active power control p 56 and 10 10 Reactive Power Control p 58 The solar power inver
22. For internal events always contact Delta Solar Support before attempting to resolve the failure LEDs Display message Message description Fault correction ex Warning O Internal failure Warning three digit number gt Please contact Delta Support O Failure Internal failure Failure three digit number gt Please contact Delta Support O L1 Voltage failure AC overvoltage or undervoltage on phase L gt Check the grid voltage shown on the display 412 Current Data AC menu gt Ifno voltage is present check the circuit breaker O L1 Frequency error DC inj Failure AC high frequency or low frequency on phase L gt Check the grid frequency shown on the display 412 Current Data AC menu gt Ifno voltage is present check the automatic circuit breaker DC feed in failure gt Restart the solar power inverter Contain your maintenance technician if the failure persists O L1 Islanding Frequency shift failure on phase L gt Ask your electricity supply company about the actual state of the grid gt Check the installation gt Restart the solar power inverter Contain your maintenance technician if the failure persists PV Power too low The solar power is too low Insufficient solar irradiation dawn dusk gt Check the PV cell voltage shown on the display 416 Current Data PV menu Auto tes
23. Press the button to apply the value NOTE If the message Pendrive error is displayed make sure the USB drive is properly inserted or that the file is not damaged NOTE If you wish to change the loaded values select Yes Commis sioning is then continued with grid selection and is the same as the initial commissioning NOTE If multiple solar power invert ers are to be connected via RS485 select a different ID for each inverter The ID is also used when saving and loading settings in order to identify the solar power inverter Available IDs 1 254 Available baudrates 2400 4800 9600 19200 38400 Configuration option RS485 termina tion resistor On Off 42 Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 8 Commissioning RS485 16 Press the buttons to select continue and then Termination On press the f button pcontinue The completion screen will be displayed ENTER 17 Press the button to complete commissioning to confirm ESC to reselect Press the El button to change settings M Commissioning is now finished NOTE b gt Ifthe solar power inverter is configured to the DE LVD DK LVD or DE MVD grids you can also configure active and reactive power control see 10 9 Active power control p 56 and 10 10 Reactive Power Control p 58 gt The solar power inverter offers some optional functions available for all
24. Press the 4 button and then set the second digit of 338 the menu number with the 3130 Grid selection amp LW buttons 5 Press the button and then set the third digit of 131 E the menu number with the 3131 View grid setup A buttons 6 Press the button to finish Configurable Parameters Display Text Menu number Designation Menu number Description Any valid menu number Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 63 EN 10 Settings 10 15 Changing Grid Menu 132 Grid Change Description If the selected grid is changed a completely new commissioning process is started see 8 Com missioning p 30 gt Always contact the Delta Support Team before changing the selected grid You can find contact information on the back of this manual After completion of initial commissioning the configured grid can be changed using a PIN Each time you wish to select a new grid or change the protected settings for the current grid you will need a new PIN You can obtain this PIN from Delta Support Procedure for changing the grid Main Menu gt Grid Selection gt Grid Change You must provide a key in order to receive a PIN You will find the key in the 132 Grid Change menu SOLIVIA 1 Inthe main menu press PInstall settings Options 100 Install settings Display settings Grid selection RS485
25. Production info Diagnostic amp Alarm 400 Production info Total statistics gt Feed in settings Event journal 470 Feed in settings Euro kWh 0 20 Statistics gt Reset day stat Reset week stat Reset day stat No PYes Reset day stat Successful Press ENTER In the main menu press the buttons to select Pro duction Info and then press the button Press the buttons to select Feed In Settings and then press the button Press the buttons to select Statistics and then press the button Press the buttons to select the statistics to be reset and then press the button To reset the statistics use the buttons to select the Yes entry and press the button M The statistics are reset Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 51 EN 10 Settings 10 Settings 10 1 Overview Setting Display language Page 52 Date and Time Page 53 Date and time formats Page 53 Backlighting and contrast Page 54 RS485 ElA485 Page 54 Currency and Credit per kWh Page 55 Reset Statistics Page 55 Active Power Control Active Power Reduction Page 56 Active power by frequency Page 57 Reactive Power Control Power factor by active power Page 58 Constant power factor Page 60 Shadowing extended MPP tracker Page 62 Insulation and grounding monitoring Page 63 Standard menu Page 63
26. Step The end of instructions is designated as follows M End of instructions Instructions consisting of only one step are shown as follows gt Step 1 42 User buttons and LEDs User buttons and LEDs are shown in this document as follows User buttons on solar power inverter button LEDs on solar power inverter Faure LED LED symbol Meaning Ni LED stays on 02 IN Ses LED flashes O LED is off 1 43 Information on Display Information shown on the solar power inverter display includes menus settings and messages This information is shown in this manual as follows Menu names User settings menu Parameter names Cos phi parameter o Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 2 Intended purpose 2 Intended purpose The solar power inverter may only be used as intended Proper use of the solar power inverter meets the following criteria e Use in stationary PV systems connected to the local power grid for converting the direct current in the PV system to alter nating current and feeding it into the grid e Use within the specified power range see 15 Technical data p 83 and under the specified ambient conditions indoor area or covered outdoor area with up to IP65 Any of the following uses of the solar power inverter is considered improper e Isolated operation The solar power inverter has anti islanding and other monitoring features
27. Undervoltage protection V lt 0 10 1 00 V 0 80 V Crit Vmin Undervoltage protection V lt lt 0 10 1 00 V 0 45 Vs Fmax Frequency increase protection f gt 50 0 52 0 Hz 51 5 Hz Fmin Underfrequency protection f lt 47 5 50 Hz 47 5 tVmin Delay for V lt RS 15 2 4s 11 Press the buttons to select continue and then press the 4 button The Locked power limit menu is displayed 12 To change a value press the button and then set the value using the buttons Press the 4 button to apply the value 13 Press the buttons to select continue and then press the button The Format menu is displayed 14 To change the value press the button and then set the value using the buttons Press the button to apply the value 15 Press the buttons to select continue and then press the button The Date and Time menu is displayed 16 To change the value press the j button and then set the value using the buttons Press the button to apply the value NOTE If you change one of the val ues you must fill out the provided label after commissioning and place it next to the type plate NOTE The configured values can only be changed after commissioning with a PIN NOTE The configured values are displayed after commissioning in the 131 View Grid Setup menu Available date formats DD MM YYYY DD MM YYYY DD MM YYYY MM DD YYYY MM DD YYYY MM DD YYYY YYYY MM DD YYYY MM
28. and 12 Diagnos tics and Troubleshooting p 72 are relevant to the operator All other activities may only be performed by qualified electricians 1 3 Warnings and Symbols Where hazards may arise when working with the solar power con vertor the following hazard levels and symbols are used to indicate these hazards DANGER Indicates a hazardous situation An accident will result in death or serious injury Indicates a hazardous situation An accident can lead to death or severe physical injuries Indicates a hazardous situation An accident can lead to medium or light physical injuries Indicates a hazardous situation that can result in property damage NOTE Contains general information on using the solar power inverter A note does not indicate hazardous situations Where required further supplementary warning symbols are used in the safety instructions and warnings This symbol is a warning of a risk of electric shock due to high voltage The type and source of the hazard is explained in the safety instructions or warnings This symbol is a warning of general hazards The type and source of the hazard is explained in the safety instructions or warnings 1 4 Conventions Used in This Document 1 4 1 Order of Instructions Numbered instructions must be performed in the specified order 1 Step When the solar power inverter reacts to a step this reac tion is marked with an arrow 2 Step 3
29. for Internal Events s c c erora ea y d a ae E ee RR ees 76 12 3 Overview of Failure Messages Troubleshooting 76 124 Logging the Messages o chos 4 an haha don af af A ee de Se Bee we oe 0e A 78 12 4 1 Extermakevents 109 24 54484 3 RE ake ee AREA RE A e 78 12 4 2 Internal Events LOG 4 4 44 dois ged idee e a i Bede 78 12 4 3 Log tor BDEW i iioa dew wd wk het eh Rok i he a a A eG Bm 79 12 4 4 Log tor VDEAR N4105 o Be he dia Ha e RE Bo Se a RE Re ee 79 12 4 5 Change Events LOG 3 44 24 da same mea de be RA D AU o 80 125 Displaying current network settings 80 13 Maintenance and Repair 2 2 e 4844 20408 4 dora au d ie de unie Ow de ee ee ie 81 13 1 R placingith fan 20 4 42 ane Bie Gok E we eR RA AS EWS eR eA wR Re Ae 81 14 Decommissioning Transport Storage Disposal 82 1471 DECOMMISSIONING ss 3 sue dee ea EURE ee aa ee bie we eRe wee eee Ree ke eee 82 14 2 Packaging pia B amp G ee oe ee eee oe A A ee oe ee ee ee oe 82 143 Transport 46454245 545 2344469 4440344044828 444 5544464 be bob eteed bea 82 1444 Storages i ee RESOLD Row eR la Ae Ee SS AS Re de a a EE ed 82 14 5 Disposal ics ch ee LR eo BRE die GR RT See ee ee ee ee EE a 82 15 Technical data 2 00 ear ee te DH ee we ae a a ee a 83 16 Appendix
30. info Diagnostic amp Alarm 400 Production info Feed in settings PEvent journal History 480 Event journal PExternal events Change events 481 External events 16 04 2012 17 25 36 In the main menu press the buttons to select Produc tion Info and then press the button Press the buttons to select Event Journal and then press the button Press the buttons to se lect External Events and then press the button You can view the whole list by pressing the buttons Voltage too high Begin 1014V Message Structure Each message consists of three lines defined as follows 481 External events 16 04 2012 17 25 36 Voltage too high Begin 1014V 1 Line Date and time when the external event occurred 2 Line Short description of the failure 3 Line Additional information e g Begin for the occurrence of an event or End for the disappearance of an event 600 Diagnostic amp Alarm 2 Press the buttons to select Internal Log and then press the J button 3 You can view the whole list by 620 Internal log pressing the buttons 16 04 2012 17 25 36 202 222 Message Structure Each message consists of two lines defined as follows 620 Internal log 1604 2022517625436 202 222 1 Line Date and time when the internal event occurred 2 Line One or more failure numbers 78 Operation and Installation Manual f
31. is connected to the DC MINUS connection the positive DC pole to the DC PLUS connection see Fig 7 6 p 26 DC INPUT MINUS DC INPUT PLUS Fig 7 6 Connecting PV modules to DC connections Pay attention to the maximum input voltage of the solar power inverter and the maximum allowed current load of the DC connec tions see Chapter 15 Technical data p 83 The DC MINUS connection is a socket A connection plug is required for the DC cable The DC PLUS connection is a plug A connection socket is required for the DC cable 7 4 2 Required Tools and Accessories Not included in delivery Single core cable Grounding kit The grounding kit is required when the DC PLUS or DC MINUS side of the solar power inverter must be grounded The grounding kit can be ordered from Delta A manual is included and can be downloaded under www solar inverter com eu de grounding kit htm Delta Part Num ber EOE990000275 Grounding kit SOLIVIA EU G4 TR grounding kit Connection Socket and Connection Plug DC Connection Type on Solar Power Inverter Counterpiece Required for Cable A connection plug is required for the DC cable The DC MINUS connection is a socket The DC PLUS connection is a plug A connection socket is required for the DC cable Connection sockets and connection plugs can be ordered from Multi Contact at www multi contact de The
32. of the solar power inverter will begin After the startup process and the automatic self test the commissioning procedure of the inverter starts and the Installation menu is displayed To change the language press the button and then set the language using the buttons Press the button to apply the language Press the buttons to select continue and then press the button This displays the Load USB Data menu Press the buttons to select No and then press the button The Grid Selection menu is displayed To change the grid press the button and then set the grid using the buttons Press the button to apply the grid Press the buttons to select continue and then press the button The PDD Settings settings for grid and system protection will be displayed To change the settings for the grid and system protection press the J button and then set the option using the buttons Press the button to apply the setting Available languages Czech Danish Dutch English French German Italian Polish Portuguese Romanian Slovak Slovenian Spanish NOTE This is where you can select the right grid for your country Available options Standard Loads the settings defined by the VDE AR N 4105 standard Off Grid and system protection is deactivated User The parameters can be manually configured within the limits defined by the VDE AR N 4105 stan dard Operatio
33. runtime There are also special statistics for the last seven days the solar power inverter was in operation All production information is backed up to a separate hard drive monthly Configuration Settings The configuration settings of the solar power inverter can be exchanged between solar power inverters of the same type by using a USB drive This above all makes switching solar power inverters easier 18 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 6 Operating Behavior Warning and Error Messages Every warning or error message is stored in the solar power inverter with a time stamp The messages are stored in the event log or in the internal log depending on the cause of the error The event log is primarily intended for the installer and should make analyzing and resolving problems easier The internal log helps Delta Solar Support when analyzing more difficult problems Reports The reports combine the various information on production events settings parameter changes and errors During use in grids as per VDE AR N 4105 and BDEW the five last failures are saved together with the settings 6 7 Characteristic Curves Efficiency Curves SOL11 0 1TR3 E4 Efficiency 0 97 0 95 2 0 91 t 0 89 0 87 0 85 0 2000 4000 6000 8000 10000 Power W 600V___ 800 V Operation a
34. 0 0 11 0 EU G4 TR 41 8 Commissioning Select RS485 ID PID 1 Load data Successful Press ENTER Change loaded values Mes PNo 2590512912 14 26 51 Date Time Date and time Time Mae 26 5d Ph continue PID 1 10 11 12 13 14 15 Press the buttons to select the ID and then press the button The data is then verified and loaded A message is displayed when the loading process is successful Press the button to confirm If the asymmetrical grid load balancing was activated on the solar power inverter from which the data was loaded the following message appears Power balancing is activated If active or apparent power limitation was activated on the solar power inverter from which the data was loaded the following message appears The maximum power of that inverter has been limited to HH HW HH HKVA Ifthe above mentioned messages appear press the button to confirm each Press the buttons to select No and then press the button The Date and Time menu is displayed To change the value press the button and then set the value using the buttons Press the button to apply the value Press the buttons to select continue and then press the button The RS485 menu is displayed To change the value press the button and then set the value using the buttons
35. 0126 1 1 and VDE 0126 p 32 Denmark DK LVD VDE AR N 4105 8 5 Commissioning for VDE AR N 4105 Germany DE LVD VDE AR N 4105 grids p 35 DE MVD BDEW 8 6 Commissioning for grids as per BDEW p 38 France FR ISL 60Hz French Islands 60 Hz FR UTE UTE 15 712 1 FR VFR 2013 VFR 2013 FR VFR 2014 VFR 2014 Greece GR CONTINENT Greece continental VDE 0126 1 1 GR ISLAND Greece islands VDE 0126 1 1 Netherlands NL VDE 0126 1 1 EN 50438 Poland PL EN 50438 eens Portugal Dr EN 50438 a rca grids as per EN 50438 Romania RO VDE 0126 1 1 Slovakia S VDE 0126 1 1 Spain ES RD661 RD661 ES ISLAND RD1663 Spanish islands ES RD1699 RD1699 Czech Republic CZ VDE 0126 1 1 EN 50438 United Kingdom UK G59 2 230 G59 2 230 V UK G59 2 240 G59 2 240 V The solar power inverter must be set up with the same settings as another identical solar power inverter 8 7 Commissioning by loading the settings from another solar power inverter p 41 The solar power inverter is a replacement device for another identical solar power inverter 8 8 Commissioning after replacing a solar power inverter p 44 The solar power inverter should be newly set up and the grid to which the solar power inverter is connected is not shown in the list above You can set up a customer specific grid Please contact Delta Support by phone Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 31 8 Commissioning 8 4 Co
36. 10 2 Display language Menu 100 Install Settings Description Allows the display language to be configured Accessing the Menu Main Menu gt Install Settings SOLIVIA 1 Inthe main menu press the buttons to select Install Install settings Settings and then press the Options 2 button 100 Install settings 2 Press the buttons to se lect Language and then press gt Language English the button Date and time 100 Install settings 3 Press the JJ buttons to select the language and then Language English press the button Date and time Access via Button Combinations Press the Et and 4 buttons simultaneously Configurable Parameters Display Text Designation Description Language Language The display language Czech Danish Dutch English French German Italian Por tuguese Romanian Slovak Slovenian Spanish 52 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 10 Settings 10 3 Date and time 10 4 Date and time formats Menu 110 Date and time Menu 111 Format Description Description Allows the date and time to be configured Accessing the Menu Main menu gt Install settings gt Date and time PInstall settings Options Language English Date and time Display settings Configurable Parameters SOLIVIA 1 109 Install settings 2
37. 2h 24h Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 53 10 Settings 10 5 Backlighting contrast 10 6 RS485 ElA485 Settings Menu 120 Display settings Menu 140 RS485 Description Description Allows backlighting and contrast to be configured Accessing the Menu Main menu gt Install settings gt Display settings In the main menu press the buttons to select Install Settings and then press the button SOLIVIA 1 PInstall settings Options Press the buttons to select Display Settings and then press the button 109 Install settings 2 Date and time PDisplay settings Grid selection Select a parameter with the buttons Press the 4 but ton to change the value 120 Display settings 3 PContrast 10 Backlight Auto Configurable Parameters Allows the ID and baudrate of the RS485 interface to be configured Accessing the Menu Main menu gt Install settings gt RS485 In the main menu press the buttons to select Install Settings and then press the button SOLIVIA 1 gt Install settings BCPETONSENER Press the buttons to select RS485 and then press 109 Install settings 2 Grid selection gt RS485 the 4 button 140 RS485 3 Select a parameter with the F EEE EEEEEFEEREE buttons Press the J but PID 1 ton to change the value Baudrate 19200 Configurable Parameters Disp
38. 5 Disable the USB interface see 11 3 Enabling disabling the USB interface p 66 SOLIVIA 2 Inthe main menu press the Options features and then press the button PUSB features Anote on IP65 protection is then displayed Without cover you 3 Press the 2 button to confirm will lose the IP65 The 300 USB features menu is then displayed Basso Bes aaa then press the button SFirmware update The data is then loaded from the USB drive to the Save swap data solar power inverter buttons to select USB found is displayed make sure the files are in the main directory of the USB drive 300 USB features 4 Press the buttons to select Firmware Update and NOTE If the message No files NOTE If the message Pendrive error is displayed make sure the USB drive is properly inserted Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 67 11 Saving and loading data and settings 115 Saving settings The solar power inverter settings can be saved to be loaded to another solar power inverter of the same type for use with the same settings The saved settings are e Grid settings e User settings e Display settings e Production settings 1 Enable the USB interface see 11 3 Enabling disabling the USB interface p 66 PUSB features Production info Without cover you 3 Press the button to confirm will lose the IP65 protection Save swap d
39. 664 8 be eG h ede eee bee bee de Bea bes 20 7 1 2 Ambient Conditions swore A a 21 7 1 3 Consideration of Asymmetrical Grid Load 21 7 2 Attaching the Solar Power Inverter aas aas be 44444444 eue sue 22 7 2 1 Required Tools and Accessories 22 7 2 2 Installing Mounting Plate s 2324 22 44 aera 8 das SR ee eee eo ee eae ae ut a 22 7 2 3 Mounting Solar Power Inverter 23 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 3 Table of Contents 10 7 3 Grid CONNECTION e ceea ep ceed be bbaee be Pode bee eed eed db dew de pee pie 23 7 3 1 General INStrUCHONS s s ia hee eee ea o RAS ee hee 23 7 3 2 Required Tools and Accessories 0 0 e ee aa 24 7 3 3 Establishing Connection 24 7 4 Connecting the PV Modules 4 6 4 si a me ge 43e mu Me Re LE D FREE ee 26 74 1 General InStTUCHONS lt se Le Be De ee SRE See ee Se ae dos PER eR du dd 26 7 4 2 Required Tools and Accessories 26 7 4 3 Establishing CONNECTION 20 coa eR due RE Eee A A d s 27 7 4 4 Grounding DC SIde nea e oe Se NO e A a e de tee Sa ee G 27 7 5 Connect RS485 ElA485 optional 28 7 5 1 General Instructions s se s h2 0 244 490 24 be eb babe eee ee Eee Ee 28 7 5 2 Required Tools and
40. 85 16 1 Order numbers eii oro 8 be tbe Pe bee ebb bee DE Se be be e Eee eee 85 16 2 Overview of menu S UGC UTS eye wok a EO ee PS A eS ae a OE Oe E E 86 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 5 1 About This Manual 1 About This Manual This manual will help you become familiar with the solar power inverter You can help keep the product durable and reliable during its use by handling it carefully These are the basic requirements for opti mal use of the solar power inverter 1 1 Purpose of This Manual This manual is part of the product Store the manual in a safe place Read the manual carefully and thoroughly and follow the instruc tions contained therein This manual contains important information on the installation commissioning and operation of the solar power inverter Observe this information for safe use see 3 General safety instructions p 8 The installer and the operator must have access to this manual and must be familiar with the safety instructions The solar power inverter can be safely and normally operated if installed and used in accordance with this manual Delta Energy Systems is not responsible for damage incurred by failure to com ply with the installation and operating instructions in this manual 1 2 Target audience of this manual This manual is aimed at qualified electricians Only chapters 9 Production information p 47
41. 85 ID PID Load data Successful Press ENTER Enable the USB interface see 11 3 Enabling disabling the USB interface p 66 In the main menu press the buttons to select USB features and then press the button Anote on IP65 protection is then displayed Press the J button to confirm The 300 USB features menu is then displayed Press the 4 1 buttons to select Load Settings and then press the 2 button The solar power inverter searches for available files on the USB drive When files are found the Select RS485 ID menu is displayed Press the buttons to select the ID and then press the button The data is then loaded A message is displayed when the loading process is successful Press the button to confirm Disable the USB interface see 11 3 Enabling disabling the USB interface p 66 EN NOTE The STUP_ CFG file must be in the main directory of the USB drive The characters represent the RS485 ID of the solar power inverter from which the data is to be loaded for example 001 NOTE If the message Pendrive error is displayed make sure the USB drive is properly inserted NOTE If the message No files found is displayed make sure the files are in the main directory of the USB drive Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 69 11 Saving and loading data and settings 11 7 Saving swa
42. Accessories i e oter a s a ei a i e e e E E a E aa E E A 28 7 5 3 Connecting Individual Solar Power Inverters 29 7 5 4 Connecting Multiple Solar Power Inverters 29 Commissioning saaa 30 8 1 Before You Begin 2 4 4 sitas hee a a ES ee at DS ae hee eee ER eo 30 8 2 Brief description of the commissioning steps 30 8 3 Selecting the Correct Commissioning Procedure 31 8 4 Commissioning for grids as per EN 50438 and VDE 0126 32 8 5 Commissioning for VDEARN 4105 grids 35 8 6 Commissioning for grids as per BDEW 38 8 7 Commissioning by loading the settings from another solar power inverter 41 8 8 Commissioning after replacing a solar power inverter 44 Production informations 6 3 id He dd e a de e a Re ei he 47 9 1 OVENVIGW se gos ad e a A ae e 47 9 2 Actualidata 2 08 HE nr la a AA ew A ee QE 48 9 3 Other Statistics sac aoe ee PS hae ee Ka SRS Se R LR Pk A ANNE ER ee 50 9 4 Reset SAISIR ice ee he ask ee ia a Sa ee cs eee te Ges oe a ee ee a eee oe 51 SOHINOS 52 a cc A A AR gm Ge Ma Ua we nee A Ua a A a ee eee ae a de 52 10 1 OVEIVIEW sa 24 ode eee eee ee hee eg Rhee eee he a bow ek a SAG ee ee eee 52 10 2 Display language s 4 4 amp 4 434 be rias b
43. Connection of multiple solar power inverters to a data logger via RS485 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 29 EN 8 Commissioning 8 Commissioning 8 1 Before You Begin The solar power inverter must be correctly installed see 7 Installa tion p 20 Information on operating the display is provided in 5 4 Display and Buttons p 12 NOTE As long as the commissioning procedure has not been completed you can go back to any point in the commissioning procedure at any time by pressing the E button NOTE Always read through each step before starting the commissioning procedure The display images in this chapter are examples and do not necessarily represent the settings needed for your own installation Therefore always check the settings 8 2 Brief description of the commissioning steps The table contains a brief description of all commissioning steps Please note that not all commissioning steps apply for every coun try Commissioning step Description Valid for country Set the display language Select the desired display language All Load USB data Optional You can load the settings from other power invertors of the same type All Grid selection The most important commissioning step The grids are sorted by country For All some countries several grids are available and are listed separately Make sure you select the right country grid
44. OLIVIA 1 Production info PUser settings Diagnostic amp Alarm Changes could affect 2 energy production Ask your installer for assistance 500 User settings 3 Reactive PwCtrl PFRT settings ak factor 2 DeadBand Vh 253V Configurable Parameters In the main menu press the buttons to select User Settings and then press the button Press the J button to confirm Press the buttons to select FRT Settings and then press the button Select the individual param eters with the buttons Press the J button to change the value Display Text Designation Description Mode Mode Switches the function on and off On Off k factor k factor 0 10 DeadBand Vh DeadBand upper Upper voltage limit of the voltage limit deadband 231 266 V DeadBand V1 Deadband lower Lower voltage limit of the voltage limit deadband 184 230 V FRT delay t FRT delay time When the voltage once more enters the deadband then the maximum sym metric asymmetric current continues to be fed for the specified delay time 0 01 5s Max I sym Maximum power Maximum reactive current symmetrical in the case of a symmetric failure 3 phases 0 100 Max I asym asymmetrical Maximum power Maximum reactive current in the case of an asymmet ric failure 2 phases 0 100 The Shadowing option is an extended MPP tracker When the option is switched on the MPP tr
45. RE Failure Yellow The menus have up to three levels Main menu Information on the LED messages can be found in 12 Diagnostics and Troubleshooting p 72 oo 300 USB features 5 4 Display and Buttons 400 Production Info 410 Current Data 5 4 1 Overview 411 Current overview 412 Actual data AC 420 Day Statistics O 430 Week Statistics 500 User Settings Fig 5 5 Overview of Display and Buttons Most menu names consist of a three digit number and a menu title An overview of the complete menu structure can be found in Chap ter 16 2 Overview of menu structure p 86 No Designation Display Control Buttons 5 4 2 Display Layout 100 Install settings Language English gt Date and time Display settings Fig 5 6 Display The display has four rows of 20 characters each The first row contains the name and number of the currently dis played menu The second to fourth rows show the menu elements A small arrow in the third row shows the currently selected menu item 12 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 5 Product Description 5 4 5 Goto menu function NOTE You can use the Go to Menu function to directly navigate to a particular menu 1 To start the Go to Menu function press the button for at least three seconds A list of the available menu numbers can be found in 16 2 Overview o
46. Solar power invertor is not in operation tion O Insulation or grounding warning simultane EN N q ously with other warning during synchroniza O ormal operation tion O O A Synchronization f 6 Table 12 2 Status Display of the LEDs Meaning of LED symbols in the overview table O Failure LED symbol Meaning O Are LED stays on 78 O Wamina d ti Sats LED flashes O arning during operation 3 O i ge LED is off re Warning during synchronization 0 o E S Insulation or grounding failure O O O Insulation or grounding failure simultaneously with other failure O O Start operation O O Insulation or grounding failure simultaneously with other warning o O Insulation or grounding warning during normal se operation 0 Insulation or grounding warning during syn 6 chronization O Insulation or grounding warning simultane ously with other failure O Insulation or grounding warning simultane o ously with other warning SAS oe NN Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 73 12 Diagnostics and Troubleshooting 12 1 2 Messages on display Message Cat egory Message Class LED Status Display Text in 411 Current Over view Overview Description Normal operation Limited operation 2 lt Operation O Earth Fault O Failure 8 Operation Earth Fault O Failure Normal operation e g se
47. TR SOLIVIA 11 TR Maximum Permitted Fuse Rating 32 A type B 32 A type B The AC and DC sides of the solar power inverter are electrically isolated This makes it impossible for DC electricity to reach the AC side of the inverter If a residual current device is required we rec ommend using a 300 mA residual current device type A However be sure to always adhere to the specific regulations applicable in your country Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 23 7 Installation The typical leakage current is less than 3 5 mA NOTE For power inverters connected in parallel the short circuit current of the PV system is in creased at the grid connection point to the public power grid To protect the user and the system install the required safety and protection devices e g automatic circuit breaker and or overvolt age protection devices A special kit for France is available from Delta This kit contains all components required to meet the requirements specified in UTE C15 712 1 16 1 Order numbers p 85 7 3 2 Required Tools and Accessories Included in delivery Round AC plug Type Amphenol C016 20E005 Not included in delivery Flexible 5 core cable L1 L2 L3 N PE with a conductor cross section from 4 0 mm to 6 0 mm Cable end sleeves suitable for the conductor cross section Cable strain relief Locking washer for connect
48. U G4 TR 33 8 Commissioning RS485 Termination Ph continue 15 Press the buttons to select continue and then On press the button The completion screen will be displayed ENTER to confirm ES GE to reselect 16 Press the button to complete commissioning or Press the E button to change settings M Commissioning is now finished NOTE The solar power inverter offers some optional functions available for all grids see 10 Settings p 52 On completion of commissioning save the settings see 11 5 Saving settings p 68 and the swap data see 11 7 Saving swap data p 70 on a USB stick so that you can use this information later 34 Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 8 Commissioning 8 5 Commissioning for VDE AR N 4105 grids Commissioning as per VDE AR N 4105 applies for the following countries and grids Country Grid Notes Denmark DK LVD VDE AR N 4105 Germany DE LVD VDE AR N 4105 EN DC DISCONNECT Installation Language continue English Installation Language English continue Grid continue Grid selection Grid DE EVD continue PDD Standard continue Check all connections and cables for damage and correct seating Correct the installation if necessary Switch on the DC isolating switch The startup process
49. VIA Gateway M1 G2 Solarlog or Meteocontrol WEB logger Outdoor cable IP65 with Harting RJ45 3081129500 PushPull and RJ12 plugs Termination resistor for RS485 3072438891 If you wish to make the cables yourself then you must use cable managers from Harting IP67 Push Pull system cable RJ45 We recommend using a blue cable manager on one side and a white cable manager on the other side Accessories Cable manager RJI IP67 data plug PushPull 8 pin white RJI IP67 data plug PushPull 8 pin blue Harting Part No 09 45 145 1500 09 45 145 1510 HARTING Deutschland GmbH amp Co KG PF 2451 D 32381 Min den www harting com 28 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 7 Installation 7 5 3 Connecting Individual Solar Power Inverters Termination resistor switched on LA PA Cover unused connections 7 RS485 00 For cable specification contact Delta Support Data logger Fig 7 8 Connection of a single solar power inverter to a moni toring system via RS485 7 5 4 Connecting Multiple Solar Power Inverters Termination resistor switched on 1 RS485 RS485 RS485 Cable 308116x00 Cable 308116x00 Cover 4 For cable specification unused contact Delta Support connections Data logger Fig 7 9
50. a a a 63 10 14 Standard Menu a 2248528508 dus dae don db an dhe ee at Ee dee eee 63 10 15 Changing Gid a e 5 2 8 Lima a a SRE EES DSR Oe ee Ree a 64 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 Table of Contents 11 Saving and loading data and settings 65 11 1 Beloreyoulbegin ss ss 2 eee BERR we AA ARSE RES PES ew REE Ew eee 65 12 Organize fles 24 LA RES eGR GES Pawel ERS RA Re eg eA Ea eae REE Re es 65 11 3 Enabling disabling the USB interface 66 11 4 Updating firmware sans 53 Damage 4 ee RE ae HS RUE RE auf Ee oe ae we 08 67 11 5 Saving settings 22 65 d a dans a ae See ba dust OS na SR de H bert d 68 110 Loading setings 44 See A a AS AA A IR A a we OR Be 69 117 Saving SWAD data s 4 6 ak no eR au NEG Ro ee E a beer Ra 70 116 Crealngirepolr s Se SR LR OAs He DS we MST De Use Drm e 71 11 9 SENICE 24 oe EU NS END BAR AREA ARA 71 12 Diagnostics and Troubleshooting 72 12 1 Messages on Current Operating Status 12 12 1 1 Status Display ofthe LEDS 73 12 1 2 Messages ON display 44 4 2 bee A 74 12 2 Analyzing Failures s s o La es A eK eR RR EE A Re ee SE 75 12 2 1 Procedure for External Events 2 022524 8220465 Se RES ee den de pu 75 12 2 2 Procedure
51. acker performs an additional search at regular intervals The MPP tracker then searches for the maximum power over a wider voltage range This option should be switched on if shadows regularly pass slowly over the PV modules in the course of a day These types of mov ing shadows can be caused by chimneys or trees for example This function has a relatively small effect in the case of fast moving shadows e g from passing clouds The function is configured depending on the size of the shadowing Accessing the Menu Main Menu gt Options gt Shadowing SOLIVIA 1 Install settings POptions USB features PShading Grounding 210 Shading 3 Mode disabled 210 Shading 4 Mode high Configurable Parameters In the main menu press the buttons to select Options and then press the 2 button Press the buttons to select Shadowing and then press the button Press the button to set the mode Press the buttons to configure the size of the shad owing and then press the button Display Text Designation Description Mode Mode disabled Extended MPP tracking is deactivated high High shadowing time cycle 0 5 hours medium Medium shadowing time cycle 2 hours low Low shadowing time cycle 4 5 hours 62 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 10 Settings 10 13 Insulation and grounding mo
52. age continue English Installation Language English continue PGride continue Grid selection Guide DE MVD continue PDD Standard continue PDD settings PDD Standard Pcontinue seating Correct the installation if necessary Switch on the DC isolating switch The startup process of the solar power inverter will begin After the startup process and the automatic self test the commissioning procedure of the inverter starts and the Installation menu is displayed To change the language press the button and then set the language using the buttons Press the button to apply the language Press the buttons to select continue and then press the button This displays the Load USB Data menu Press the buttons to select No and then press the button The Grid Selection menu is displayed To change the grid press the button and then set the grid using the buttons Press the f button to apply the grid Press the buttons to select continue and then press the button The PDD Settings settings for grid and system protection will be displayed To change the settings for the grid and system protection press the J button and then set the option using the buttons Press the button to apply the setting Press the buttons to select continue and then press the f button Ifthe PDD setting is User an extended PDD Set ti
53. and then press the PYes button Configurable Parameters Display Text Designation Description Day stats Day statistics Week stats Week statistics Month stats Month statistics Year stats Year statistics Total stats Total statistics History History Statistics for the last seven days the solar power inverter was in operation Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 55 10 Settings 10 9 Active power control NOTE Active power control is only available for DE LVD and DK LVD grids NOTE Changes to active and reactive power control can affect energy production 10 9 1 Overview Ask your installer before changing the settings Function Mode Active Power Reduc Description Limits the maximum fed active power tion Active power by fre Limits the fed active power depending on quency grid frequency 10 9 2 Active Power Reduction Menu 511 Power Reduction NOTE The settings in the 511 Power Reduction menu affect the Power Factor by Active Power cos q P function see 10 10 2 Power Factor Description This mode is available for LVD grids by Active Power cos q P p 58 The maximum permissible active power can be set as a percentage of the maximum power of the solar power inverter To deactivate this function set the value to 0 If a power limit was set during commissioning the percent value relates to the maximum active power
54. ar Statistics 460 Total Statistics 490 History Description The statistics for day week month year and total production time all provide the same type of data The 490 History menu shows the statistics for the last seven days the solar power inverter was in operation These seven days do not have to be consecutive Structure Submenu Display messages Displayed values Example Display and Description 421 Day Stats AC Energy Energy fed over selected period A21 Day stat AC 431 Week stat AC Runtime ae time in the selected eave LP Wh pana Runtime deL la 441 Month stat AC Revenue Targeted revenue in the selected Royanye EUR 451 Year stat A period the settings can be made ci in the menu 470 Feed In Set 461 Total stat AC tings see Chapter 10 7 Cur rency and Credit per kWh p 59 L1 Af 50 00 50 10 Hz Minimum maximum frequency L2 AP 34 in the selected period for every L3 AP aex phase L1 Imax Maximum AC current for each L2 Imax phase in the selected period for L3 Imax every phase L1 AU 228 240V Minimum maximum AC voltage L2 AU in the selected period for every L3 AU phase L1 Pmax Maximum fed in active power L2 Pmax in the selected period for every L3 Pmax phase L1 Qmax Maximum fed in active reactive L2 Qmax power in the selected period for L3 Qmax every phase L1 Qmin Minimum fed in active reactive L2 Qmin power in the selected perio
55. ata then press the button Create reports 300 USB features 4 Press the J 7 buttons to select Save Settings and PSave settings The data is saved in a STUP_ CFG file on the USB drive The characters represent the RS485 SOLIVIA 2 Inthe main menu press the buttons to select USB Options features and then press the button Anote on IP65 protection is then displayed The 300 USB features menu is then displayed NOTE If the message Pendrive error is displayed make sure the USB drive is properly inserted ID of the solar power inverter from which the data is to be loaded for example 001 Save data 5 Press the button to confirm Successful Press ENTER 6 Disable the USB interface see 11 3 Enabling disabling the USB interface p 66 68 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 11 Saving and loading data and settings 11 6 Loading settings To simplify the setup procedure the settings from another solar power inverter of the same type can be loaded and used in another solar power inverter that is to use the same settings Information on saving the settings can be found in 11 5 Saving settings p 68 SOLIVIA Options gt USB features Production info Without cover you will lose the IP65 protection 300 USB features Create reports gt Load settings Service Select RS4
56. ayed 20 Press the J button to complete commissioning or Press the 5 button to change settings M Commissioning is now finished NOTE If multiple solar power invert ers are to be connected via RS485 select a different ID for each inverter The ID is also used when saving and loading settings in order to identify the solar power inverter Available IDs 1 254 Available baudrates 2400 4800 9600 19200 38400 Configuration option RS485 termina tion resistor On Off NOTE reactive power control see 10 9 Active power control p 56 and 10 10 Reactive Power Control p 58 gt Ifthe solar power inverter is configured to the DE LVD DK LVD or DE MVD grids you can also configure active and gt The solar power inverter offers some optional functions available for all grids see 10 Settings p 52 gt On completion of commissioning save the settings see 11 5 Saving settings p 68 and the swap data see 11 7 Saving swap data p 70 on a USB stick so that you can use this information later Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 37 8 Commissioning 8 6 Commissioning for grids as per BDEW Commissioning as per BDEW is valid for the following countries and grids Country Grid Notes Germany DE MVD BDEW DC DISCONNECT Check all connections and cables for damage and correct Installation PLangu
57. bdirectory This requires a computer Renaming the files is not recommended When loading data the solar power inverter searches for file names exactly matching the preset template e g STUP_ TXT If the file name does not match this template the file will not be recognized You should always save the files to a computer since a USB drive can break easily The data would then be lost Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 65 11 Saving and loading data and settings 11 3 Enabling disabling the USB interface The USB interface is disabled by default To use the USB interface for saving and loading it must be enabled NOTE The USB interface must be disabled again after use SOLIVIA Options PUSB features Production info Without cover you will lose the IP65 protection 300 USB features Load settings PService 310 Service PState disabled Monitoring Of Ff 310 Service PState enabled Monitoring Off In the main menu press the buttons to select USB features and then press the button Anote on IP65 protection is then displayed Press the button to confirm The 300 USB features menu is then displayed Press the buttons to select Service and then press the J button The menu 310 Service is displayed Press the buttons to select Status and then press the J button The status indicato
58. button The RS485 menu is displayed NOTE If the message No files found is displayed make sure the files are in the main directory of the USB drive NOTE If the message Pendrive error is displayed make sure the USB drive is properly inserted NOTE If you wish to change the loaded values select Yes Commis sioning is then continued with grid selection and is the same as the initial commissioning Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 45 EN 8 Commissioning RS485 AED al Baudrate 19200 RS485 Termination On gt continue ENTER to confirm BS Gls to reselect 15 To change the value press the button and then set the value using the buttons Press the 4 button to apply the value 16 Press the buttons to select continue and then press the button The completion screen will be displayed 17 Press the button to complete commissioning or Press the E button to change settings M Commissioning is now finished NOTE If multiple solar power invert ers are to be connected via RS485 select a different ID for each inverter The ID is also used when saving and loading settings in order to identify the solar power inverter Available IDs 1 254 Available baudrates 2400 4800 9600 19200 38400 Configuration option RS485 termina tion resistor On Off NOTE reactive power control see 10 9
59. cessful Press ENTER Change loaded values Yes PNo 25 95 2012 Time aro rs SEL Date and time Time alos SEL continue 10 11 12 13 14 Press the 11 buttons to select Load Swap Data and then press the button The solar power inverter will then search for files on Press the buttons to select the ID and then press the USB drive When files are found the Select RS485 ID menu is displayed the button gt The data is then verified and loaded A message is displayed when the loading process is successful Press the button to confirm gt gt Ifthe above mentioned messages appear press the If the asymmetrical grid load balancing was activated on the solar power inverter from which the data was loaded the following message appears Power balancing is activated If active or apparent power limitation was activated on the solar power inverter from which the data was loaded the following message appears The maximum power of that inverter has been limited to HH HW KVA button to confirm each Press the buttons to select No and then press the button gt The Date and Time menu is displayed To change the value press the button and then set the value using the buttons Press the button to apply the value Press the buttons to select continue and then press the
60. configured This function alters the fed active power depending on the grid frequency If a starting frequency is exceeded the fed active power is limited If a stopping frequency is exceeded the active power is no longer fed Behavior as per VDE AR N 4105 is described below Variant 1 The grid frequency alters between f an and fsi Gradient Hz gt fstart fstop f Hz Fig 10 1 Function P f variant 1 Once the grid frequency exceeds the value f the value of the active power P being fed at this moment is automatically saved and active power limiting is activated As long as the grid frequency stays above f and under fstop the fed active power value runs along the gradients Active power drops with increasing grid frequency and increases with decreasing grid frequency Variant 2 The grid frequency exceeds Fstop 4 Pm Gradient Hz gt fstart fstop f Hz Fig 10 2 Function P f variant 2 When the grid frequency exceeds f yy but then remains under Togas the solar power inverter behaves as described in variant 1 the active However as soon as the grid frequency exceeds fsp op power feed is stopped Active power feed will resume once the grid frequency falls below fse Once resumed the active power will increase by 10 per minute Accessing the Menu Main Menu gt User Settings gt Active PwCtrl gt Power vs freq SOLIVIA Produ
61. ctinga SUBMENU ica a Seed er a a e a dara 13 5 4 9 Exiting a Menu os a i eee me EMS d a ER eae he ame 13 5 4 10 Setting Values 2 28 La Ree D RoR EERE OAS Sew Ree Due hr bw aw Ss 14 5 5 Electrical connections s s s a pa 66 8556 88 wR eee AR 16 5 5 1 OVEIVIGW SE LL Bae eae Cee oe eee REA Fe BAA RC AR ARR ee 16 5 5 2 DC connections and DC isolating switch 17 5 5 3 ACCONNECTION e oie RR oe ele eS DRE Soe WED Ge oe ee wR BS 17 5 5 4 RS485 interface ElA485 ee 17 5 5 5 WSBAMeMace ta Aero a ees a an Aer ens ees a Ae ac ee 17 5 6 Fan 5 pe Oe do eee RR eee ee ee ee Be eed A E a 17 6 Operating Behavior lt e cT mra a ee a due a A ee a 18 6 1 General Principle of Operation ee 18 6 2 Impact of DC Input Voltage coe omi a a a a sa eE a e a a R a o Pa h E E aaa a D a 18 6 3 Configuring Permanent Active and Reactive Power Reduction 18 6 4 Functions Affecting Operating Behavior 18 6 5 Balancing Asymmetrical Grid Loads 18 6 6 Data Analysis and Communication 18 6 7 Ch raciensic Curves 5 do dona one oe Aes o se oo bw OS oe os Sha ow ice 19 T Installation 22444 ee ae es A eB A eee PE ee eee 20 GA Planning the installations m gs ce Pe ee a RR ee ea ee kee hee ae Be Ee Rss 20 7 1 1 General Instructions ai L e
62. ction info PUser settings Diagnostic amp Alarm 1 Inthe main menu press the buttons to select User Settings and then press the button Changes could affect 2 Press the button to confirm energy production Ask your installer for assistance Press the buttons to select Active PwCtrl and then press the J button 500 User settings 3 PActive PwCtrl Reactive PwCtrl Press the buttons to select Power vs freq and then press the J button 510 Active PwCtrl 4 Power reduction PPower vs freq Select a parameter with the buttons Press the J but ton to change the value PStart freq 50 20Hz Stopufreqs Slcsonz Configurable Parameters Display Text Start freq Designation Start frequency Description Frequency at which the feeding of active power is limited Value range 50 00 65 00 Hz Standard 50 20 Hz Frequency at which the feeding of active power is stopped Value range 50 00 65 00 Hz Standard 51 50 Hz Adjustment of the fed active power in percent per Hz Value range 0 150 Standard 40 Stop freq Stop frequency Gradient Gradient Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 57 EN 10 Settings 10 10 Reactive Power Control NOTE Reactive power control is only available for DE LVD DK LVD and DE MVD grids NOTE Changes to active and reactive power contro
63. d for L3 Qmin every phase 422 Day stat DC PV1 Pmax Maximum DC power in the 422 Day stat DC selected period on MPP tracker 1 432 Week stat DC cee pen aval ekda T OCC W PV1 Imax Maximum DC current in the PV1 Imax A 442 Month stat DC selected period on MPP tracker 1 HH VL Umax Maximum DC voltadeinthe __ PV1 Umax L M 452 Year stat DC PV1 Umax aximum voltage in the selected period on MPP tracker 1 462 Total stat DC 423 Day stat ISO R iso max Maximum insulation resistance in 123 Day stat ISO the selected period 433 Week stat ISO s _ A a R iso min Minimum insulation resistance in Fl alela ee ko 443 Month stat ISO the selected period i aa a R iso min kQ 453 Year stat ISO 463 Total stat ISO 50 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 9 Production information Submenu Display messages Displayed values Example Display and Description 491 day 04 05 12 492 day 493 day 494 day 495 day 496 day 497 day Statistics for the last seven days 491 Day the solar power inverter was in A Energy operation Runtime The statistics contain the same Revenue 04 05 12 information as menus 421 422 and 423 9 4 Reset Statistics Menu 471 Statistics Description All statistics can be reset the old data are saved internally Procedure SOLIVIA USB features gt
64. de of the control panel with safety gloves The control panel itself is protected by a special surface DC operating volt range DC operating volt range MPP DC max input voltage DC max operating current DC max current per string AC nom output voltage AC nom output frequency AC max continuous output current AC max apparent power AC power factor cos Degree of protection Protection rating Ambient temperature derating DC operating volt range DC operating volt range MPP DC max input voltage DC max operating current DC max current per string AC nom output voltage AC nom output frequency AC max continuous output current AC max continuous output power AC power factor IP class Safety class Ambient temperature derating Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 11 5 Product Description 5 3 Status LEDs 5 4 3 Buttons Symbol Use 2 U CC IN e Exit current menu O ESC e Cancel value setting Operation c Earth Fault e Move upwards in menu Failure e Set value increase e Move downwards in menu e Seta value decrease e Select menu item Fig 5 4 Status LEDs e Open configurable value for editing e Finish editing adopt set value No Label Designation Color O OPERATION operation rgen 5 4 4 General Menu Structure EARTH FAULT Earth fault Red FAILU
65. e 4 button Current data AC Structure Submenu Display messages Displayed values Example display and description 411 Current overview Now Current power Atl current overview Day Energy generation on the current Now W Ext Event a t ting stat Bai A xt Events urrent operating state see 1221 ae a Oper EXESE Is PUSWEnES ating Status p 72 If there are error messages the list of messages can be opened by pressing the button For a detailed description see Chapter 12 3 Overview of Failure Messages Troubleshooting p 76 412 Actual data AC L1 voltage Current AC voltage for every Aida Current data Ac L2 voltage hase 13 en R L1 Voltage M L1 current Current AC current for every La epa ERA L2 current phase L3 Voltage AMY L3 current L1 frequency Current frequency for every phase L2 frequency L3 frequency L1 P Currently fed active power for L2 P every phase L3 P L1 Q Currently fed reactive power for L2 Q every phase L3 Q L1 DC inj Current DC electricity component L2 DC inj of AC current for every phase L3 DC inj 413 Current data L1 L1 voltage Current AC voltage for phase L1 Ais current data LA L1 current Current AC current for phase L1 L1 Voltage REY L1 frequency Current frequency for phase L1 L1 Current A L1 P Currently fed active power for L1 Freq He phase L1 L1 Q Currently fed reactive power for phase L1 L1 DC inj Current
66. e AC plug The solar power inverter is connected to the local power grid with an AC connection see Fig 7 4 p 23 Fig 7 4 Location of AC connection The round AC plug has a coupling to protect against accidental removal This coupling can be disengaged with a screwdriver Use a flexible or rigid 5 core cable L1 L2 L3 N PE with a con ductor cross section from 4 0 to 6 0 mm coefficient k 1 The AC plug is designed for use with copper conductors please contact the manufacturer Amphenol when using other conductor materials Observe the required grid impedance at the grid connection point cable length conductor cross section Select the cable length and conductor cross section so that the conductor temperature and cable losses are as small as possible In some countries e g France and Germany specific require ments for the system installation must be satisfied UTE C15 712 1 VDE 0100 712 These requirements specify the minimum cable cross section and the protective measures required to prevent overheating due to high currents Always adhere to the specific requirements of your country The energy meter must be installed between the solar power inverter and the grid feed in point Observe the directives of your local electricity supplier when doing this The following table shows the maximum allowed trigger current for the circuit breaker Solar power inverter SOLIVIA 10
67. e using the buttons Press the button to apply the value Press the buttons to select continue and then press the button The Date and Time menu is displayed To change the value press the button and then set the value using the buttons Press the button to apply the value Press the buttons to select continue and then press the button The RS485 menu is displayed To change the value press the button and then set the value using the buttons Press the button to apply the value EN NOTE If you change one of the val ues you must fill out the provided label after commissioning and place it next to the type plate NOTE The configured values can only be changed after commissioning with a PIN NOTE The configured values are displayed after commissioning in the 131 View Grid Setup menu Available date formats DD MM YYYY DD MM YYYY DD MM YYYY MM DD YYYY MM DD YYYY MM DD YYYY YYYY MM DD YYYY MM DD YYYY MM DD Available time formats 12h 24h NOTE If multiple solar power invert ers are to be connected via RS485 select a different ID for each inverter The ID is also used when saving and loading settings in order to identify the solar power inverter Available IDs 1 254 Available baudrates 2400 4800 9600 19200 38400 Configuration option RS485 termina tion resistor On Off Operation and Installation Manual for SOLIVIA 10 0 11 0 E
68. ed in settings then press the 2 button Event journal 470 Feed in settings 3 Selecta parameter with the buttons Press the 2 but PCurrency EUR ton to change the value Euro kWh 0 20 Configurable Parameters Display Text Designation Description Currency Currency Freely configurable no pre defined values EUR kWh EUR kWh Freely configurable no predefined values The amount per kWh is required for the revenue calculation Statistics Reset Statistics Allows individual statis tics to be deleted see 9 4 Reset Statistics p 51 EN Allows the statistics to be reset The currency and credit per kWh can also be configured Accessing the Menu Main Menu gt Production Info gt Feed In Settings gt Statistics SOLIVIA i USB features PProduction info Diagnostic amp Alarm In the main menu press the buttons to select Produc tion Info and then press the button 4009 Production info 2 Total statistics bFeed in settings Event journal 470 Feed in settings 3 Euro kWh 0 20 Statistics gt Reset day stat Reset week stat Press the buttons to select Feed In Settings and then press the button Press the buttons to se lect Statistics and then press the button Press the buttons to select statistics to delete and then press the button Reset day stat 5 Press the buttons to No select Yes
69. et be dee bee beth A ss 52 10 35 Date and tme s carr yi ie e n a a a e a deme TT IRL TI Re RTS wth ee wet be Ewe oe 53 10 4 Date and time formats k s s 42 4 a d a a rr a a a e pa 53 10 5 Backlighting contrast 2 Le de LE Rae Ha woe ee aed AR OR OO Oe Ee a E da 54 10 6 RS485 EIA485 Settings sii ne modis kasae aaia DA E n La a o aa E aa a A 54 10 7 Currency and Credit per KWh 22 2252 de easa e PO La A 55 10 8 Reset Statisties seror Seen Be beaks Sea eGo eee eee A RER M 55 10 9 Activepowercontoll i s 2 Baoan Heh kha ee eh A A ee ae he ak A Re ee eA me i 56 10 9 1 OVEINVIEWS n Fea kee ee ate a AA ARA 56 10 9 2 Active Power REdUCHON og ecs amp a kee eB AR a ee Pe AAA 56 10 9 3 Active Power by Frequency P f c o cos e 64254 45 sand ge da bee 57 10 19 Reactive Power Control 22 20 20 haut param bo hat be eae M ee ae 58 10 10 1 OVENVIGWS amp m ey Sok is Bees ete O Ace eee a DES ee Be 58 10 10 2 Power Factor by Active Power cos P 58 10 10 3 Constant Power Factor cos p 60 10 10 4 Reactive power constants 60 10 10 55 COMU 22 a a e ES Be A Reso Ke ek se BER AA 61 10 11 FaulttRide Through PRi 24s 52 EL d s cb oe eek SN be ooh ee oe eS eee RA 62 10 12 Shadowing extended MPP tracker 2 2 acedi taui iatna da bodid etti ga 62 10 13 Insulation and grounding monitoring lt s s e s e seca tora st eea a i o d a
70. ew menu additional information can be dis played This is generally divided into two categories e External events incl insulation and grounding failures e Internal events The additional information on the failures are logged in two sepa rate menus e External events Menu 480 Ext Events e Internal events Menu 620 Internal Log Depending on the failure category you will automatically be taken by the system from the 411 Current Overview menu to the appro priate menu with the description of the failure The method for resolving the failure depends on the failure cat egory Events in the external events failure category are generally resolved by the installer Events in the internal events failure category must always be dis cussed with Delta Solar Support first before attempting to resolve the failure If events from both categories occur simultaneously those in the internal events category take priority In this instance therefore Delta Solar Support should always be contacted first 12 2 1 411 Current overview Now W D a y BES awh External events External events Voltage too high PV1 Temp derating Islanding 480 Event journal PExternal events Change events 481 External events TEKOS ZOT2ETT25 736 Voltage too high Begin 1014V 1 Procedure for External Events Switch to menu 411 Current Overview In the 411 Current Overview menu pres
71. f menu structure p 86 Go to menu opens Go to menu 2 gt Menu 411 411 Current data 2 Press the button to enter the menu number The first digit flashes 3 Use the buttons to set the first digit of the menu number You can only set menu numbers that actually exist The name of the associated menu is displayed in the fourth display row 4 Once you have set the first digit press the button The second digit flashes 5 Enter the second and third digit in the same manner 6 Press the button The menu corresponding to the entered menu number is displayed 5 4 6 Button combinations The table lists special button combinations for the display buttons 5 4 7 Navigating the Menu Use the buttons to navigate in a menu Use the 4 button to move down in the menu and the button to move up SOLIVIA Install settings Options SOLIVIA Install settings POptions USB features SOLIVIA Options gt USB features Production info 5 4 8 Selecting a Submenu gt In order to open a submenu press the button SOLIVIA USB features gt Production info User settings Action ESC Pressing the fsi and 4 buttons at the same EVV 15 time displays the 100 Install Settings menu where you can change the display language to be Buttons used see 10 2 Display language
72. from the solar power inverter depending on the current fed active power Power ratio P P 0 50 100 0 8 inductive int B S o 1 oint D 8 oint A capacitive Point C 0 8 Fig 10 4 Example of configuring cos P function When changing the currently fed active power the cos q runs along the plotted line Effects of Active Power Limitation on Behavior of cos q P Function If active power limitation is configured during commissioning and or through the power reduction function the behavior of the cos P function changes Power ratio P P p Fe 50 80 100 0 inductive Point B gt o 1 Point D 8 Point A x capacitive Point C 0 8 5 kW 8 kW 10 kw Example SOLIVIA 10 EU G4 TR limited to 8 kW Fig 10 5 Effect of active power limitation on the cos OD P function This active power reduction to 8 kW means point D can never be achieved This applies for the entire grey area Accessing the Menu Main Menu gt User Settings SOLIVIA 1 Production info PUser settings Diagnostic amp Alarm Changes could affect 2 energy production Ask your installer for assistance 500 User settings 3 Active PwCtrl PReactive PwCtrl PMode Cos phi P A Cos phi ind 1 00 520 Reactive PwCtrl 5 Mode Cos phi P Al Cos phi lind 1 98 gt Reactive PwCtrl In the main menu pres
73. fter replac ing a solar power inverter p 44 11 2 Organize files Here are a couple of notes on organizing saved and loaded files When saving the files are always saved to the main directory of the USB drive The file names are always the same for all SOLIVIA EU G4 TR type solar power inverters For example the settings are saved in a file under STUP_ TXT The stands for the RS485 ID of the solar power inverter e g 001 The RS485 ID is a number for identifying the solar power inverter The RS485 ID for all solar power inverters is set by the factory to gl This can cause the following problem Two solar power inverters are in a PV system The RS485 ID 1 set by the factory was not changed You save the settings of the first solar power inverter to a USB drive You then save the settings from the second solar power inverter to the same USB drive Since the RS485 ID for both power inverters is the same the file name is also the same The file from the first power inverter is then overwritten There are multiple ways to avoid this problem gt If multiple solar power inverters are installed in a PV system set a different RS485 ID for each solar power inverter gt Use a separate USB drive for each solar power inverter gt Create a separate subdirectory on the USB drive for each po wer inverter After saving the files from a power inverter copy EN these files to that power inverter s su
74. ge the language press the button and then set the language using the buttons Press the button to apply the language Press the buttons to select continue and then press the button This displays the Load USB Data menu Press the buttons to select No and then press the button The Grid Selection menu is displayed NOTE This is where you can select To change the grid press the 1 button and then set un the right grid for your country the grid using the buttons Press the f button to apply the grid 32 Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 8 Commissioning Grid selection Grid UK G59 2 continue gt Pmax E Smax Locked power limit Smax MEM VA continue Format gt Date DD MM YYYY Time 24h Format Time 24h continue 254905829112 ale pjs pl gt Date Time Date and time Time aros E gt continue RS485 er Dis al Baudrate 19200 10 11 12 13 14 Press the buttons to select continue and then press the button The Locked power limit menu is displayed To change the value press the J button and then set the value using the buttons Press the 1 button to apply the value Press the buttons to select continue and then press the button The Format menu is displayed To change the value press the button and then set the valu
75. grids see 10 Settings p 52 gt On completion of commissioning save the settings see 11 5 Saving settings p 68 and the swap data see 11 7 Saving swap data p 70 on a USB stick so that you can use this information later Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 43 8 Commissioning 8 8 Commissioning after replacing a solar power inverter It is possible in all countries and for all grids to load the settings from another solar power inverter In this chapter the term swap means the replacement of a damaged solar power inverter with a new device of the same type procedure with you The replacement may only be performed after consulting Delta Solar Support The support team will discuss the correct A The IP 65 degree of protection is no longer guaranteed when the USB interface protective cover is removed gt Only remove the protective cover when necessary gt Where possible use a Micro USB stick The protective cover is designed to be screwed down over a Micro USB stick DC DISCONNECT Installation PLanguage English continue Installation Language English continue Load USB data Insert USB Pendrive and press ENTER 1 If you have not already done so save the settings of the other solar power inverter to a USB drive see 11 7 Sav ing swap data p 70 Check all connections a
76. he solar power inverter will begin After the startup process and the automatic self test the commissioning procedure of the inverter starts and the Installation menu is displayed To change the language press the button and then set the language using the buttons Press the button to apply the language Press the buttons to select continue and then press the button This displays the Load USB Data menu Press the buttons to select Yes and then press the button Insert USB Pendrive and press Press the buttons to select Load Settings and then press the 1 button The solar power inverter will then search for files on the USB drive When files are found the Select RS485 ID menu is displayed NOTE The STUP_ CFG file must be in the main directory of the USB drive The characters represent the RS485 ID of the solar power inverter from which the data is to be loaded for example 001 Available languages Czech Danish Dutch English French German Italian Portu guese Romanian Slovak Slove nian Spanish NOTE The STUP_ CFG file must be in the main directory of the USB drive The characters represent the RS485 ID of the solar power inverter from which the data is to be loaded for example 001 NOTE If the message No files found is displayed make sure the files are in the main directory of the USB drive Operation and Installation Manual for SOLIVIA 1
77. in PV1 Imax PV1 Umax PV1 Pmax R ISO max R ISO min 492 Day 2 493 Day 3 494 Day 4 495 Day 5 496 Day 6 497 Day 7 410 Current Data Current Overview Current Data AC Current Data L1 Current Data L2 Current Data L3 Current Data PV Date and Time Current Isolation 420 Day Statistics 411 Current Overview Now Day Curr operating state 412 Current Data AC L1 voltage L2 voltage L3 voltage Day stat AC 421 Day Stats AC L1 current Day stat PV Energy L2 current L3 current L1 freq L2 freq L3 freq L1 L2 L3 L1 L2 1 O O O U U TU L3 L1 DC inj L2 DC inj L3 DC inj 413 Current Data L1 L1 voltage L1 current L1 freq L1 P L1 Q L1 DC inj Day stat ISO Runtime 430 Week Statistics Revenue 440 Month Statistics L1 Af 450 Year Statistics L2 Af 460 Total Statistics L3 Af L1 Imax 470 Feed in settings L2 Imax Currency L3 Imax EUR kWh L1 AU Statistics L2 AU L3 AU 480 Event Journal L1 Pmax 481 External Events L2 Pmax 482 Change events L3 Pmax L1 Qmax 490 History L2 Qmax Day 1 L3 Q
78. ing the ground wire to the solar power inverter see Fig 7 3 p 22 item C 7 3 3 Establishing Connection 1 Remove the cable sheath as shown and remove 10 mm of insulation from each wire end NOTE Observe the correct polarity of the round plug An incorrect configuration can destroy the solar power inverter 52 5 mm PE 57 5 mm 10 mm E E I Place the end sleeves on the exposed wire ends and crimp them on SS fi i es Connect the AC cable to the AC plug as described below Unscrew the nut and cable housing 2 from the socket insert If the cable diameter lies between 16 and 20 mm then remove the blue hexagonal inlay inside the nut Slide the nut and cable housing Y onto the AC cable O 24 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 7 Installation Slide the cable conductors of the AC cable into the connec recommend also using a strain relief clamp for cables of other tions in the pin insert and screw tight Observe the correct diameters prase sequence wnendoing ihis gt Ground the grounding conductor of the AC cable at the con nection provided for this purpose A 4 Ground the mounting plate 5 a gt Screw the nut cable housing Y and pin inser
79. l can affect energy production 10 10 1 Overview Ask your installer before changing the settings Function Mode Description Power Factor by Active Setting the power factor cos based on Power cos q P relationship P P active power to rated active power Setting a constant power factor cos Q inductive or capacitive Setting a constant reactive power Constant power factor Reactive power con stants Reactive power over To configure a relationship Q S reactive voltage Q U power to rated apparent power depending on the grid voltage U Only one mode can be active at one time 10 10 2 Power Factor by Active Power cos P Menu 520 Reactive PwCtrl Description This function is available for DK LVD DE LVD DE MVD grids This function can be used to determine a separate cos for four different power ratios P P see Fig 10 3 auf Seite 58 P P is the ratio between the current active power and the rated power of the solar power inverter Power ratio and cos q are assigned to points in pairs The power ratios for points A and D are fixed at 0 100 For points B and C the power ratios can be con figured within the predefined limits The cos can be configured for all four points For example the parameters B P Pn ratioandB cos phi belong to point B The parameters A P Pn ratio and D P Pn ratio are not displayed since they are fixed at 0 100 Inductive cos point A 0
80. lay Text Designation Description Display Text Designation Description Backlight Display backlightingAuto On ID Solar Power 1 254 Auto The backlighting Inverter Idenulieer tion Number switches on when a display button is pressed Baudrate Baudrate 2400 4800 9600 19200 38400 the standard is On The backlighting is 19200 always switched on Contrast Display contrast 1 10 NOTE Connecting Multiple Solar Power Inverters via RS485 gt Select a different ID for each solar power inverter gt A termination resistor must be connected to the last solar power inverter in the series see 7 5 Connect RS485 EIA485 op tional p 28 gt This termination resistor can be ordered from Delta see 16 Appendix p 85 54 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 10 Settings 10 7 Currency and Credit per kWh 10 8 Reset Statistics Menu 470 Feed In Settings Menu 471 Statistics Description Description Allows the currency and credit per kWh to be configured The sta tistics can also be reset Accessing the Menu Main Menu gt Production Info gt Feed In Settings SOLIVIA 1 In the main menu press the USB features buttons to select Produc PProduction info tion Info and then press the Diagnostic amp Alarm E button 400 Production info 2 Press the buttons to Total statistics select Feed In Settings and PFe
81. lf test synchronization When the green OPERATION LED is solid the solar power inverter is feed ing power into the grid When the green OPERATION LED flashes the solar power inverter is not feeding power into the grid External event Warning For external events For a warning the yellow Faure LED 0 Operation flashes The solar power inverter con Internal event IN ESE EVenes tinues to feed power into the grid O carti SUR For internal events 0 Failure PES Warning 3 digit number External event Failure For external events For a failure the yellow FAILURE i LED is solid The feed to the grid is Internal event Operation Ext Events I stopped O FA RAUN For internal failures e we O Failure EN Failure 3 digit number Insulation and Warning Ext Events For an Isolation alarm the red EARTH grounding failure O Operation Fautt LED flashes The solar power LIS inverter continues to feed power into 0 Earth Fault the grid Failure Failure Ext Events For an insulation failure the red EARTH O Operation Fautt LED is solid The feed to the rid is stopped 0 Earth Fault 9 PR IN O Failure Table 12 3 display Display of message categories on the LEDs and 74 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 12 Diagnostics and Troubleshooting 12 2 Analyzing Failures When a warning is given or a failure shown by the LEDs and the 411 Current Overvi
82. ly be touched with safety gloves The solar power inverter is very heavy see 15 Technical data The solar power inverter must be lifted and carried by at least two people Only devices in compliance with SELV EN 60950 may be connected to the RS485 and USB interfaces All connections must be sufficiently insulated in order to com ply with the IP65 protection rating Unused connections must be closed by placing cover caps on the solar power inverter Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 4 Unpacking 4 Unpacking Risk of injury due to weight The weight of the solar power inverter see 15 Technical data p 83 can cause injury if _ not handled properly gt The solar power inverter must be lifted and carried by at least two people Mounting plate a Operation and installation manual b AC plug Amphenol C16 3 AC c 2 M6 nuts and 2 M6 washers d Power limit label e Solar power inverter f Retaining clip gt Check all parts for signs of damage gt Store the packaging in a safe place Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 5 Product Description 5 Product Description 5 1 Overview of Components and Connections Fig 5 1 Solar Power Inverter Components and Connections N
83. max Day 2 L1 Qmin Day 3 L2 Qmin Day 4 L3 Qmin Day 5 431 Week stat AC Day 6 441 Month stat AC Day 7 451 Year stat AC 414 Current Data L2 461 Total stat AC L2 voltage L2 current 422 Day stat DC L2 freq PV1 Imax L2 P PV1 Umax L2 Q PV1 Pmax L2 DC inj 432 Week stat DC 442 Month stat DC 415 Current Data L3 452 Year stat DC L3 voltage 462 Total stat DC L3 current L3 freq 423 Day stat ISO L3 P R ISO max L3 Q R ISO min L3 DC inj 433 Week stat ISO 443 Month stat ISO 416 Current Data PV 453 Year stat ISO PV1 voltage 463 Total stat ISO PV1 current 41A Date and Time Date Time 41B Current Isolat R iso R iso 88 Operation and Installation Manual for SOLIVIA 10 11 EU G4 TR SERVICE EUROPE Belgium support belgium solar inverter com 0800 711 35 Free Call Bulgaria support bulgaria solar inverter com 421 42 4661 333 Denmark support danmark solar inverter com 8025 0986 Free Call Germany service deutschland solar inverter com 0800 800 9323 Free Call France support france solar inverter com 0800 919 816 Free Call Greece support greece solar inverter com 49 7641 455 549 Israel support israel solar inverter com 49 7641 455 549
84. menu corresponding to the entered menu number is displayed 86 Operation and Installation Manual for SOLIVIA 10 11 EU G4 TR 16 Appendix Main Menu 100 Install Settings 200 Options 300 USB features 400 Production Info 500 User Settings 600 Diagnostic amp Alarm 700 Inverter Info 800 Standard Menu 100 Install Settings Language German Date and Time 110 Date and time Display settings Date Grid selection Time RS485 i Format 111 Format Date 120 Display settings Time Backlight Bel Contrast 130 Grid Selection View grid setup Grid Change Custom Country 140 RS485 ID Baudrate 200 Options Shadowing 210 Shadowing Grounding Mode Tes 230 Grounding Pv1 300 USB features Updating firmware Save swap data Save settings Create reports Load settings Service 310 Service Status Monitoring 400 Production Info See next page Only for DE LVD and DK LVD und DE MVD grids a 500 User Settings Active PwCtrl Reactive PwCtrl FRT Settings 600 Diagnostic amp Alarm Only for 620 Internal log DE MVD grid 630 Report MVD __ 640 Report LVD
85. mmissioning for grids as per EN 50438 and VDE 0126 This commissioning applies to the following countries and grids Country Grid Notes Belgium BE C10 11 12 Synergrid C10 11 2012 Bulgaria BG VDE 0126 1 1 France FR ISL 60Hz French Islands 60 Hz FR UTE UTE 15 712 1 FR VFR 2013 VFR 2013 FR VFR 2014 VFR 2014 Greece GR CONTINENT Greece continental VDE 0126 1 1 GR ISLAND Greece islands VDE 0126 1 1 Netherlands NL VDE 0126 1 1 EN 50438 Poland PL EN 50438 Portugal PT EN 50438 Romania RO VDE 0126 1 1 Slovakia SK VDE 0126 1 1 Spain ES RD661 RD661 ES ISLAND RD1663 Spanish islands ES RD1699 RD1699 Czech Republic CZ VDE 0126 1 1 EN 50438 United Kingdom UK G59 2 230 G59 2 230 V UK G59 2 240 G59 2 240 V DC DISCONNECT Installation PLanguage continue English Installation Language English Pr continue PGrid continue Check all connections and cables for damage and correct seating Correct the installation if necessary Switch on the DC isolating switch The startup process of the solar power inverter will begin After the startup process and the automatic self test the commissioning procedure of the inverter starts and the Installation menu is displayed Available languages Czech Danish Dutch English French German Italian Polish Portuguese Romanian Slovak Slovenian Spanish To chan
86. n and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 35 8 Commissioning PDD settings PDD Standard Ph continue PDD settings Umax continue PDD settings Umax 253V continue PPmax _kW Smax _kVA Locked power limit Smax MINA Ph continue Format gt Date DD MM YYYY Time 24h Format Time 24h Ph continue 2595 29 12 14 26 51 Date Time Date and time Time MA Paves SL Ph continue 10 11 12 13 14 15 16 17 Press the buttons to select continue and then press the button Ifthe PDD setting is User an extended PDD Set tings menu will be displayed Continue with Step 10 Ifthe PDD setting is Standard or Off the Locked Power Limit menu will be displayed Continue with Step 12 To change the value press the button and then set the value using the buttons Press the button to apply the value Press the buttons to select continue and then press the button The Locked power limit menu is displayed To change a value press the button and then set the value using the buttons Press the 4 button to apply the value Press the buttons to select continue and then press the button The Format menu is displayed To change the value press the button and then set the value using the buttons Press the button to apply the value Press
87. n info PDiagnostic amp Alarm Inverter info 600 Diagnostic amp Alarm 2 Internal log bReport LVD Press the buttons to select Report LVD and then press the button You can view the whole list by pressing the buttons 640 Report LVD 3 wvyvvv ERROR 5 vYWvvvvyY 16 04 2012 17 25 36 Critical OverVolt Message Structure Each message consists of three or more lines defined as follows 640 Report LVD VYYYY ERROR 5 VYVYYY 1EN04 201281762586 Critical OverVolt 1 Line Failure number the higher the number 1 Line Failure number the higher the number the more current the failure the more current the failure 2 Line Date and time when the event occurred 2 Line Date and time when the event occurred 3 and Other Lines Brief description of the failure s 3 and Other Lines Brief description of the failure s Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 79 12 Diagnostics and Troubleshooting 12 4 5 Change Events Log 125 Displaying current network settings Menu 482 Change events Menu 131 View Grid Setup Description Description The log contains a chronological list of all changes to parameters that affect energy production and thereby profit Change events can be made on the display via the service soft ware or by a ripple control signal Accessing the Menu Main Menu gt Production Info gt Event Journal gt
88. n to confirm Disable the USB interface see 11 3 Enabling disabling the USB interface p 66 70 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 11 Saving and loading data and settings 11 8 Creating reports The reports contain the following information e Firmware serial number of the model e Statistics events comparisons with a summary of statistics and events e Internal logs e AT reports e LVD reports only for DE LVD and DK LVD grids SOLIVIA Options PUSB features Production info Without cover you will lose the IP65 protection 300 USB features Save settings gt Create reports Load settings Create reports Successful Press ENTER 11 9 Service Enable the USB interface see 11 3 Enabling disabling the USB interface p 66 In the main menu press the buttons to select USB features and then press the button Anote on IP65 protection is then displayed Press the f button to confirm The 300 USB features menu is then displayed Press the 4 buttons to select Create Reports and then press the button The data is saved in a SWAP_ CFG file on the USB drive The characters represent the RS485 ID of the solar power inverter from which the data is to be loaded for example 001 Press the 4 button to confirm Disable the USB interface see 11 3 Enabling disabling the USB i
89. nd Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 19 EN 7 Installation 7 Installation Risk of death by electrocution Potentially fatal voltage is applied to the solar power inverter during operation This potentially fatal voltage is still present for five minutes after all power sources have been disconnected gt Never open the solar power inverter gt Always disconnect the solar power inverter from power before installation open the DC isolating switch and make sure neither can be accidentally reconnected gt Wait at least five minutes until the capacitors have discharged NOTE Read this Chapter before you start installation 7 1 Planning the installation 7 1 1 General Instructions gt Possible noise emissions can be disruptive when the device is v used in living areas Therefore choose your installation loca tion carefully Always use the mounting plate supplied with the solar power inverter Check that the wall is capable of bearing the heavy load of the device Mount the solar power inverter on a fireproof wall First mount the solar power inverter on the wall and then establish the electrical connections Mount the solar power inverter so that the LEDs and display can be easily seen Make sure the reading angle and installa tion height are sufficient Mount the solar power inverter on a vibration free wall to avoid disruptive vibrations Use dowels a
90. nd cables for damage and correct seating Correct the installation if necessary Switch on the DC isolating switch gt To change the language press the button and then set the language using the buttons Press the The startup process of the solar power inverter will begin After the startup process and the automatic self test the commissioning procedure of the inverter starts and the Installation menu is displayed button to apply the language Press the buttons to select continue and then press the 4 button gt Press the buttons to select Yes and then press the button This displays the Load USB Data menu Insert USB Pendrive and press NOTE The SWAP_ CFG file must be in the main directory of the USB drive The characters represent the RS485 ID of the solar power inverter from which the data is to be loaded for example 001 Available languages Czech Danish Dutch English French German Italian Polish Portuguese Romanian Slovak Slovenian Spanish NOTE The STUP_ CFG file must be in the main directory of the USB drive The characters represent the RS485 ID of the solar power inverter from which the data is to be loaded for example 001 44 Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 8 Commissioning Load USB data Load settings Load swap data Select RS485 ID PID ll Load data Suc
91. nd screws for the installation that are suitable for the wall material and the heavy weight Mount the solar power inverter vertically see Fig 7 1 p 20 TA TA J q E 4 0000 hu I 4 1d Dn Y Fig 7 1 Mounting alignment 20 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 7 Installation 7 1 2 Ambient Conditions gt The solar power inverter has an IP65 degree of protection and can be installed indoors or in protected outdoor areas gt Note the operating temperature range at full power without derating and the maximum operating temperature range When the first operating temperature range is exceeded the solar power inverter reduces the amount of power generated Be sure to adhere to the specified minimum clearances from walls and other solar power inverters when installing the device see Fig 7 2 p 21 Do not install two solar power inverters directly above one another Avoid direct sunlight Ensure adequate air circulation Hot air must be able to dissipate upward For this reason installation directly under a closed roof is not recommended LLLLSLL S SL o o 10 A gt 10 cm p d gt 10 cm E 0060 D 4 o o o A
92. ndards and settings EN see manual see manual IP class IP65 Clr A C i5min IP class IP65 C amp A C ismin Safety class 1 a Safety class 1 met Ambient temp 25C 70T derating gt 55T Ambient temp 25T 70T derating gt 55T Sol10 0 1TR3 E4 nan SOL11 0 1TR3 E4 mua EOE47030453 EOE48030469 Rev XX Rev XX Date code YYWW Date code YYWW S N LLLMMMXXYYWWZZZZZZ S N LLLMMMXXYYWWZZZZZZ LLLMMMXXYYWWZZZZZZ LLLMMMXXYYWWZZZZZZ A MELTA www solar inverter com A NELTA www solar inverter com Designed in Germany Made in Thailand Designed in Germany Made in Thailand SN SN Fig 5 2 SOL10 0 1TR3 E4 type plate Fig 5 3 SOL11 0 1TR3 E4 type plate Information on the Type Plate Meaning of the Information A Risk of death by electrocution amin Potentially fatal voltage is present when the solar power inverter is in operation that remains for five minutes after being disconnected from power Never open the solar power inverter The solar power inverter contains no components that must be maintained or repaired by the operator or installer Opening the cover will void the warranty Read the manual before working with the solar power inverter and follow the instructions con tained in the manual Risk of injury from high temperatures When in operation the housing of the solar power inverter can become very hot Only touch the housing of the solar power inverter outsi
93. ng cable from the last solar power inverter to a monitoring gateway device e g Solivia Basic Gateway Solarlog or Meteocontrol WEB logger Outdoor cable IP65 with Harting RJ45 PushPull and RJ12 plugs Contact Delta support Termination resistor for RS485 3072438891 If you wish to assemble cables yourself in order to connect inverters to each other then you must use cable managers from Harting IP67 PushPull system cable RJ45 We recommend using a blue cable manager on one side and a white cable manager on the other side Cable manager Harting Part No RJI IP67 data plug Push Pull 8 pin white 09 45 145 1500 RJI IP67 data plug Push Pull 8 pin blue 09 45 145 1510 HARTING Deutschland GmbH amp Co KG PF 2451 D 32381 Minden www harting com Operation and Installation Manual for SOLIVIA 10 11 EU G4 TR 85 16 Appendix 16 2 Overview of menu structure NOTE You can use the Go to Menu function to directly navigate to a particular menu 1 To open the Go to Menu function press the E button for at least three seconds Goto menu opens Go to menu rMenu 411 411 Current data 2 Pressthe button to enter the menu number The first digit flashes 3 Use the buttons to enter the first digit of the menu number and then press the button The second digit flashes 4 The second and third digits are entered in the same manner 5 Press the button to complete The
94. ng the Grounding Set A Solar grounding kit from Delta Grounding kit Delta Part Number Grounding Set A Solar EOE990000275 Cable couplings Cable coupling types for the DC connections to the inverter The DC connection of the solar power inverter is a plug the DC connection is a socket DC connection on Cable coupling type Wire Cross Section Cable sheath Order number solar power inverter diameter mm AWG mm 3 6 32 0010P0001 UR DC plug Socket ave a 5 5 9 32 0012P0001 UR 4 6 10 3 6 32 0014P0001 UR 5 5 9 32 0016P0001 UR 15 25 14 3 6 32 0011P0001 UR DC socket Plug 5 5 9 32 0013P0001 UR 416 10 3 6 32 0015P0001 UR 5 5 9 32 0017P0001 UR Multi Contact UTE Kit The Multi Contact UTE Kit is designed to conform to the latest French standard UTE C 15 712 1 The UTE kit contains 8 DC measuring ele ments a mounting tool and an additional signaling sticker The UTE kit allows you to conform to the DC protection and signal requirements specified in UTE C 15 712 1 Multi Contact UTE Kit Delta Part Number Multi contact UTE kit for SOLIVIA EU Solar Inverter EOE90000341 RS485 cable RS485 connection cable Delta Part Number Cable for connecting solar power inverters Push Pull cable from Harting IP67 one side with a blue cable manager the other side with a white cable manager 1 5m 3081186300 3 0m 3081186500 5 0 m 3081186600 10 0 m 3081186200 20 0 m 3081186400 Connecti
95. ngs menu will be displayed Continue with Step 10 Ifthe PDD setting is Standard or Off the Locked Power Limit menu will be displayed Continue with Step 12 Available languages Czech Danish Dutch English French German Italian Polish Portuguese Romanian Slovak Slovenian Spanish NOTE This is where you can select the right grid for your country Available options Standard Loads the settings as defined by the BDEW standard Off Grid and system protection is deactivated User The parameters can be manually configured within the limits defined by the BDEW standard 38 Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 8 Commissioning PDD settings 276V 184V PCrit Umax Umin 10 To change the value press the button and then set the value using the buttons Press the button to apply the value The following values can be configured based on BDEW NOTE Steps 10 and 11 are only necessary when the mode User was set in Step 9 EN PDD settings tUmin 1 50s continue gt Pmax Smax Locked power limit Smax ams continue Format gt Date DD MM YYYY Time 24h Format Time 24h continue 254905829112 ALN PAGS il Display Text Designation Configurable values Recommend by BDEW Crit Vmax Voltage increase protection V gt gt 1 00 1 30 V TAN Vmin
96. nitoring 10 14 Standard menu Menu 230 Grounding Menu 800 Standard Menu Description The DC side of the solar power inverter has an insulation and grounding monitor The insulation monitoring offers two modes e ISO Error e ISO Warning If the positive or negative pole of the PV modules must be grounded to meet the requirements of the module manufacturer then this grounding can be monitored The grounding monitoring has four modes e GND Error e GND Warning e GND Error e GND Warning Before delivery the solar power inverter is set at the factory to ISO Warning insulation warning mode Description of the monitoring modes Monitoring Mode Description ISO GND off Monitoring is deactivated xxx Failure In the event of an insulation or ground ing failure the solar power inverter is disconnected from the grid xxx Warning If an insulation or grounding failure occurs the solar power inverter logs and displays the failure but is not disconnected from the grid Accessing the Menu Main Menu gt Options gt Grounding SOLIVIA 1 Inthe main menu press the Install settings buttons to select Options POptions and then press the J button USB features 200 OPpigas 2 Press the buttons to se Shadiagie lect Grounding and then press PGrdaemd nge the 2 button 230 Grounding 3 Press the button to set the as mode PPV1 ISO warning 23 G
97. nterface p 66 This function is used for servicing purposes You will be contacted by the Delta Support Team when this function must be used NOTE If the message Pendrive error is displayed make sure the USB drive is properly inserted Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 71 EN 12 Diagnostics and Troubleshooting 12 Diagnostics and Troubleshooting 12 1 Messages on Current Operating Status The following message categories are defined for displaying the operating status of the solar power inverter Message Category Description Message Classes Grid Feed In Limited operation Non critical factors that can affect the produc Various tion results but which are not failures e g self test External event External events occur outside the solar power Warning Yes inverter and affect its operating behavior Failure No e Insulation and grounding There is one or more problems with the insu Warning Yes failure lation or grounding Insulation and grounding problems are con Failure No sidered external events However these mes sages are only displayed when insulation and grounding monitoring is active see Chapter 10 13 Insulation and grounding monitoring p 63 Internal event Internal events are problems within the solar Warning Yes power inverter Failure No Change events Certain parameters can be changed manu Yes ally in the display or exte
98. o Component Connection Description O Status LEDs See Chapter 5 3 Status LEDs p 12 Display and Buttons See Chapter 5 4 Display and Buttons p 12 Type Plate See Chapter 5 2 Type plate p 11 a Electrical Connections See Chapter 5 5 Electrical connections p 16 O Fans See Chapter 5 6 Fan p 17 10 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 5 Product Description 5 2 Type plate SOLiVi4 10 TR SOLWi4 11 TR DC operating volt range 375 1000V it DC operating volt range 375 1000V Le DC operating volt range MPP 375 850V Eh DC operating volt range MPP 375 850V eH DC max input voltage 1000V ERY DC max input voltage 1000V ERY DC max operating current 26 4A DC max operating current 29A DC max current per string 26 4A DC max current per string 29A 3x400V 3P N PE wye connected AC nom output voltage 3x400V 3P N PE wye connected AC nom output voltage AC nom output frequency 50Hz AC nom output frequency 50Hz AC max continuous output current 3x20A AC max continuous output current 3x20 0A AC max continuous output power 10 0kVA AC max continuous output power 11 0kVA AC reactive current Cap 0 8 Ind 0 8 CE DaS Country specific standards and settings VDE 0126 1 1 VDE AR N 4105 AC reactive current Cap 0 8 Ind 0 8 VDE 0126 1 1 D ee CE DaS VDE AR N 4105 Country specific sta
99. oint L1 L2 L3 neutral conductor and pro tective ground conductor The grid must have one of the following grounding systems e TN C e TN S e TN C S e TT Connection type Amphenol C16 3 AC plug supplied in the scope of delivery 5 5 4 RS485 interface ElA485 The solar power inverter has two RS485 interfaces to which a PC or a monitoring system can be connected The RS485 interfaces are internally wired 1 1 This means that both RS485 interfaces can be used as an input or an output If multiple solar power inverters are connected together each solar power inverter must have a unique ID identification number Monitoring systems require the ID to recognize each solar power inverter in a PV system The last solar power inverter must have an RS485 termina tion resistor connected which can be ordered from Delta see 16 Appendix p 85 The ID can be configured during commissioning see 8 Commis sioning p 30 and can be changed at any time during operation see 10 6 RS485 ElA485 Settings p 54 Connection type 2 x RJ45 5 5 5 USB interface The USB interface is used for saving and loading data and reports Supported functions Updating firmware Saving and loading settings Saving swap data EN Create reports e Service See 11 Saving and loading data and settings p 65 for a detailed description of the functions USB A Connection type 5 6 Fan The external fan i
100. on Ask your installer for assistance Press the J button to confirm 500 User settings 3 Active PwCtrl PReactive PwCtrl Press the buttons to se lect Reactive PwCtrl and then press the button Press the buttons to select Mode and then press the button Mode Fix cosPhi ind 1 00 529 Reactive PwCtrl 5 Mode Q U Press the buttons to set Mode to Q U and then press the button 6 Select the individual param eters with the buttons Press the J button to change the value Configurable Parameters Display Text Designation Description Low Q Sn Lower limit Q S 0 60 Capacitive Display Text Designation Description High Q Sn Upper limit Q S 0 60 Inductive Low Ulim Lower voltage limit 184 230 V High Ulim Upper voltage limit 231 266 V Hysteresis Hysteresis Defines different behavior EN for rising and falling volt age 0 50 V Delay Time Delay Time Defines the period of time over which a voltage limit must be exceeded before the function is switched on 0 655 35 s Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 61 10 Settings 10 11 Fault Ride Through FRT 10 12 Shadowing extended MPP tracker Menu 530 FRT Settings Menu 210 Shadowing Description Description This function is available for the grid DE MvD Accessing the Menu Main Menu gt User Settings gt FRT Settings S
101. or SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 12 Diagnostics and Troubleshooting 12 43 Log for BDEW 12 4 4 Log for VDE AR N 4105 Menu 630 Report MVD Menu 640 Report LVD Description For grids in accordance with BDEW the last five failure messages must be saved in a separate log The log is available for the grid DE MVD Accessing the Menu Main menu gt Diagnostic amp Alarm gt Report MVD In the main menu press the buttons to select Diagnostic amp Alarm and then press the button SOLIVIA 1 Production info PDiagnostic amp Alarm Inverter info 600 Diagnostic amp Alarm 2 Internal log gt Report MVD Press the buttons to select Report MVD and then press the button You can view the whole list by pressing the buttons 630 Report MVD 3 ivwvvvv ERROR 5 vYvvvvy 16 04 2012 17 25 36 Critical OverVolt Message Structure Each message consists of three or more lines defined as follows 630 Report MVD VYYYY ERROR 5 VYYYYY 16 92020128174254386 Critical OverVolt Description EN For grids in accordance with VDE AR N4105 the last five failure messages must be saved in a separate log The log is only available for the grids DE LVD and DK LVD Accessing the Menu Main menu gt Diagnostic amp Alarm gt Report LVD In the main menu press the buttons to select Diagnostic amp Alarm and then press the J button SOLIVIA 1 Productio
102. p 2 7 gt 10 Press the button to open 100 Install Settings Select Date and Time using the buttons Press the button to open 110 Date and Time Select Date using the buttons Press the BUTTON TO BEGIN CONFIGURATION The digits for the first value in this case the day flash Select the day using the buttons Press the button to apply the new value The digits for the second value in this case the month flash Select the month using the buttons Press the button to apply the new value The digits for the last value in this case the year flash Install settings Options 100 Install settings PLanguage English Date and time 10 Install settings Language English gt Date and time Display settings 110 Date and time gt Date 25 05 2012 Time 11426251 110 Date and time Date 2540552812 Time 12426751 SN L 723 gt Na 52 21 2 NS S Ll 05 SN Ll 7013 SN L g12 lt Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 5 Product Description Buttons Action Result 12 Select the year using the buttons 4 13 Press the button to apply the new value MT The value is adopted and the editing mode is exited L 213 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4
103. p data NOTE In this chapter the term swap means replac ing a solar power inverter with a new device of the same type without changing the installation parameters e g those of the solar modules The replacement may only be performed after consulting Delta Solar Support The support team will discuss the correct procedure with you The following information is saved e Grid settings e User settings e Display settings e Production settings e RS485 ID e Statistics e Date of first installation SOLIVIA Options PUSB features Production info Without cover you will lose the IP65 protection 300 USB features Firmware update PSave swap data Save settings Save data Successful Press ENTER Enable the USB interface see 11 3 Enabling disabling the USB interface p 66 In the main menu press the buttons to select USB features and then press the button Anote on IP65 protection is then displayed Press the button to confirm The 300 USB features menu is then displayed NOTE If the message Pendrive error is displayed make sure the Press the buttons to select Save Swap Data and then press the button USB drive is properly inserted The data is saved in a SWAP_ HH CFG file on the USB drive The characters represent the RS485 ID of the solar power inverter from which the data is to be loaded for example 001 Press the butto
104. power and or reactive power can be configured during initial commissioning After completion of initial commissioning the values can only be changed using a PIN 6 4 Functions Affecting Operating Behavior The solar power inverter offers various functions for affecting oper ating behavior e Active Power Control e Reactive Power Control e Insulation and grounding monitoring e Extended MPP tracking in the case of partial shadowing of the PV modules The availability of individual functions depends on the configured grid A detailed description of the functions is provided in Chapter 10 Settings p 52 6 5 Balancing Asymmetrical Grid Loads The 3 phase solar power inverters have integrated grid load bal ancing This ensures that the fed in power is always distributed equally across all phases 6 6 Data Analysis and Communication The solar power inverter has a comprehensive system for recording operating behavior The log can be viewed directly on the display It is also possible to view the log on a computer using the communication interface RS485 Connecting a SOLIVIA Gateway M1 G2 to the solar power inverter allows this information to be accessed worldwide via the Internet All information can be saved to a USB drive to be used later The following information and data are logged Production Information The most important production information is recorded in statistics for day week month year and total
105. r flashes Press the buttons to select the desired item and then press the button The USB interface is now enabled disabled 66 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 11 Saving and loading data and settings 11 4 Updating firmware The firmware can be updated via the USB interface The firmware update is performed in the solar power inverter in two steps e Manual loading of data from USB drive e Automatic updating of solar power inverter s individual cont rollers It is possible to load the data under AC or DC voltage The data can also be loaded at night with no DC voltage The solar power inverter s individual controllers can however only be updated under DC voltage The DC voltage must be applied for 10 minutes uninterrupted so that the firmware update is automati cally performed The following instructions describe loading the firmware data from a USB drive to the solar power inverter The firmware update is then automatic NOTE The file containing the firmware data must have the name Image hex and must be located in the main directory of the USB stick Rename the file correctly if necessary This requires a computer 1 Enable the USB interface see 11 3 Enabling disabling the USB interface p 66 Production info protection Once DC voltage has been applied for at least 10 minutes the firmware is updated
106. required size depends on the wire cross section and thickness of the cable used You can also download the manual from the Multi Contact website This manual will also tell you which tools are required 26 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 7 Installation Sa as 36 sleg e 53 Es 59 ES o se le 5 SS a cw oT 52 PA 22 E cojo 1 Q 2 oO lo w Oo g o e Of S o Q O 3 g a amp 5 a mm AWG mm 3 6 32 0010P0001 UR 15149 14 5 5 9 32 0012P0001 UR DC Socket 416 10 3 6 32 0014P0001 UR 5 5 9 32 0016P0001 UR 3 6 32 0011P0001 UR 15 25 14 DC Plug 5 5 9 32 0013P0001 UR 3 6 32 0015P0001 UR 4 6 10 5 5 9 32 0017P0001 UR Multi Contact UTE kit for France 22 E The Multi Contact UTE Kit is designed to conform to the latest French standard UTE C 15 712 1 It contains eight couplings an installation and removal key and a signal sticker This UTE kit allows you to meet the DC protection and signal requirements specified in UTE C 15 712 1 Delta Part Num ber Multi Contact UTE Kit Multi Contact UTE kit for SOLIVIA EU G4 TR EOE90000341 7 4 3 Establishing Connection 1 Check the polarity of the DC voltage at the DC connections before connecting the PV system 2 Install the connection plug socket on the DC cable Follow the connection plug manual when doing this 3 Inser
107. rewdriver or wrench fitting the screws 7 2 2 Installing Mounting Plate You can use the mounting plate as a template for marking the posi tions of the holes to be drilled Sa Ad 320 200 38 Lo gt gt 90 gt gt ro 150 319 5 410 0 5 12 Q Fig 7 3 Dimensioned drawing of the mounting plate 1 Attach the mounting plate to the wall using at least four screws 6 mm and dowels Use the four holes A or the four holes B for the four screws see Fig 7 3 p 22 2 Screw the screws tightly into the wall 22 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 7 Installation 7 2 3 Mounting Solar Power Inverter 1 Attach the solar power inverter to the mounting plate PAN A 2 Place the retaining clip on the stud bolts of the mounting plate and attach the retaining clip with the washer and the mounting nuts lt GT gt 22Check the Installation M Physical installation of the solar power inverter is now com plete 7 3 Grid Connection Ah DANGER Risk of death or serious injury from electro cution gt Disconnect the AC conductor from power EN 7 3 1 General Instructions before removing or inserting th
108. rnally via the service software All parameter changes are logged and can be read later The configurations made determine whether or not a change event affects the production result However it is possible that a change event prevents the solar power inverter from feeding into the grid Table 12 1 Message categories on operating status The current operating status is indicated by the LEDs and text mes sages on the display in the 411 Current Overview menu When a new event occurs this is indicated automatically by the LEDs To read a text message for the event switch to the menu 411 Cur rent Overview A brief description of the event is then shown on the fourth display line 411 Current overview Now W Day Wh External events The software of the solar power inverter determines whether a warning is given or a failure occurs For problems with the insulation or grounding you can use the 230 Grounding menu to define whether a warning is given or a failure is triggered see Chapter 10 13 Insulation and grounding monitor ing p 63 72 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 12 Diagnostics and Troubleshooting 12 1 1 Status Display of the LEDs LED Display Meaning Insulation or grounding warning simultane LED Display Meaning ously with other warning during normal opera
109. rom the wall bracket a ON Lift the solar power inverter off of the wall bracket 142 Packaging Use the original packaging or packaging of the same quality 14 3 Transport Always transport the solar power inverter in the original packaging or packaging of the same quality 144 Storage Always store the solar power inverter in the original packaging or packaging of the same quality Observe the specifications relating to storage conditions described in Chapter 15 Technical data p 83 14 5 Disposal Dispose of the solar power inverter in an appropriate manner according to the legal requirements of your country Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 15 Technical data 15 Technical data Input DC SOLIVIA 10 TR SOLIVIA 11 TR Maximum recommended PV power 12 100 W 13 300 W Rated power 10 600 W 11 600 W Maximum input voltage 1 000 V 1 000 V EN Input voltage range for grid feeding 375 1 000 V 375 1 000 V MPP working range 375 850 V 375 850 V Rated current 17 7 A at 600 V 19 5 at 600 V Maximum operating current 26 4 A 29A Maximum allowed current load at the DC input 29A 29A Overvoltage category ll ll Output AC SOLIVIA 10 TR SOLIVIA 11 TR Rated apparent power 10 000 VA 11 000 VA Voltage range 3 phases 5 conductor 3 x 400 V N PE 18 20 3 x 400 V N PE 18 20 Rated current
110. rounding 4 Press the buttons to set the mode and then press the gt PV1 GND Error 3 button Configurable Parameters Display Text Designation Description PV1 PV1 monitoring ISO Error ISO Warning GND Error GND Warning GND Error GND Warning ISO GND off Description A standard menu can be defined which is automatically displayed when the display buttons are not used for a certain period of time When the standard menu is displayed pressing the button dis plays the main menu The standard menu is set at the factory to 411 Current Over view This menu shows the current data and current operating messages The number must be a valid menu number See 16 2 Overview of menu structure p 86 for an overview of all available menu numbers Accessing the Menu Main Menu gt Standard Menu In the main menu press the buttons to select Standard Menu and then press the button SOLIVIA fl Inverter info gt Standard menu The menu number of the current standard menu is displayed 800 Standard menu 2 Press the f button gt Menu number 411 411 Current overview The first number and the menu name flash 5441 3411 Current overview JIN 3 Press the buttons to set the first digit of the 31 0 menu number 2110 Date and time amp S gt The menu name is automatically changed to match the current selection 4
111. s makes it impossible for DC electricity to reach the AC side of the inverter Anti Islanding The integrated anti islanding device switches off the solar power inverter when the grid fails Temperature Control The convection cooling system combined with the external fan provides optimal heat dissipation An internal temperature controller reduces the output power at ambient temperatures in the upper operating range The higher the operating temperature the greater the power reduction It is pos sible for the power reduction to be adjusted to O kW 6 2 Impact of DC Input Voltage The DC input voltage values mentioned in this section can be found in Chapter 15 Technical data p 83 The maximum input voltage must never be exceeded Measure the input voltage and use an overvoltage protection device on the DC side to prevent higher voltages from reaching the inverter The maximum open circuit voltage occurs at the lowest assumed tem perature More exact information on temperature dependency is provided in the PV module data sheet The feed in voltage range of the solar power inverter defines the range of input voltages over which the solar power inverter will feed electricity into the grid The MPP input voltage range of the solar power inverter defines the range of input voltages over which the MPP tracker is activated 6 3 Configuring Permanent Active and Reac tive Power Reduction The settings for reduction of active
112. s of sufficient dimensions to ensure sufficient cooling of the solar power inverter within the operating temperature range You can find the order number at Information on replacing the fan is provided in 13 1 Replacing the fan p 81 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 17 6 Operating Behavior 6 Operating Behavior 6 1 General Principle of Operation The solar power inverter converts DC electricity into AC electricity which is then fed into the local power grid MPP Tracking The solar power inverter has an MPP tracker The MPP Maximum Power Point tracker is an automatic function that continuously searches for the operating point with the highest possible power On the normal setting the MPP tracker searches the DC input volt age range near the current operating point If a higher power point is found the solar power inverter sets this as the new operating point The manual Shadowing function can be used to set the MPP tracker to scan over a wider DC voltage range This MPP tracking function is especially useful when small shadows regularly pass over the solar modules e g from chimneys or trees In order to adapt the function to local conditions as precisely as possible the extended MPP tracking can be configured in three stages Electrical Isolation The AC and DC sides of the solar power inverter are electrically isolated by a high frequency transformer Thi
113. s the buttons to select User Settings and then press the button EN Press the button to confirm Press the buttons to se lect Reactive PwCtrl and then press the button Press the buttons to select Mode and then press the 2 button Press the buttons to set Mode to Cos phi P and then press the button 6 Select a parameter with the buttons Press the J but ton to change the value Configurable Parameters see Fig 10 3 auf Seite 58 Display Text Designation Description A cos phi ind Point A cos q inductive 0 8 1 0 or 1 00 capacitive 0 8 1 0 B cos phi ind PointA cos q inductive 0 8 1 0 or 1 00 capacitive 0 8 1 0 B P Pn ratio Point B Power ratio1 49 PIP C cos phi ind Point C cos q inductive 0 8 1 0 or 1 00 capacitive 0 8 1 0 C P Pn ratio Point C Power 50 99 ratio P P D cos phi ind Point D cos inductive 0 8 1 0 or 1 00 capacitive 0 8 1 0 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 59 10 Settings 10 10 3 Constant Power Factor cos q 10 10 4 Reactive power constants Menu 520 Reactive PwCtrl Menu 520 Reactive PwCtrl Description This function is available for DK LVD DE LVD DE MVD grids This function allows configuration of a constant cos q power factor Accessing the Menu Main Menu gt User Settings gt Reactive PwCtrl SOLIVIA 1 Produc
114. s the The message Ext events is shown in the 411 button Current Overview menu This displays a list of the most recent failures You can view the whole list by pressing the buttons Press the button This displays the 480 Event Journal menu Press the button The 481 External Events menu is dis played You can view the whole list by pressing the A description of resolving the failure can be found buttons in this manual under Chapter 12 3 Overview of Failure Messages Troubleshooting p 76 for Additional information is also shown for each the displayed failure text in this example Volt failure age too high Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 75 EN 12 Diagnostics and Troubleshooting 12 2 2 Procedure for Internal Events 411 Current overview Now A Day AENA Failure 202 620 Internal log LOROsE 200 20 27258286 202 222 1 Switch to menu 411 Current Overview In the 411 Current Overview menu press the button This displays the 620 Internal Log menu You can view the whole list by pressing the buttons Contact Delta Solar Support and provide the displayed failure numbers 12 3 Overview of Failure Messages Troubleshooting The message is displayed in the 411 Current Overview menu as Warning or Failure HHH If multiple failures occur multiple failure numbers are displayed NOTE
115. sure to observe and follow all instructions The solar power inverter can only be connected to the energy provider s grid with advance approval Installation and commis sioning may only be performed by an electrician using the in stallation and commissioning instructions found in this manual The solar power inverter must be disconnected from power and the PV modules before any work on it can be performed Follow the security regulations of the country in which the solar power inverter is installed The ground wire must be connected before commissioning Do not remove any warning signs that the manufacturer has installed on the solar power inverter Improper handling of the solar power inverter my result in physical injury and damage to property For this reason ob serve and follow all general safety instructions and warnings The solar power inverter contains no components that must be maintained or repaired by the operator or installer All repairs must be performed by Delta Energy Systems Opening the cover will void the warranty Do not disconnect any cables when the solar power inverter is powered due to risk of a fault arc To prevent lightning strikes follow the relevant regulations ap plicable in your country The surface of the solar power inverter can become very hot The display section is protected by a special layer and can be touched with bare hands Outside the display area the solar power inverter should on
116. t together Tighten the nut to 5 Nm and the cable housing to 1 2 Nm gt Insert the AC plug into the AC socket on the solar power inverter and tighten the locking ring to a torque of 6 to 8 Nm 6 Check the installation M The grid connection has been established gt Fita cable strain relief clamp directly behind the round plug when using cables of diameters between 11 and 13 mm We Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 25 7 Installation 7 4 Connecting the PV Modules Risk of death or serious injury from electro cution Potentially fatal voltage may be applied to the DC connections of the solar power inverter gt Never disconnect the solar modules when the solar power inverter is under load First switch off the grid connection so the solar power inverter cannot feed energy into the grid Then open the DC isolating switch gt Make sure the DC connections cannot be accidentally touched NOTE To ensure protection conforming to IP65 all unused connections and interfaces must be 7 4 1 closed using the covers on the solar power inverter General Instructions The strings of the PV modules are connected to the DC connec tions see Fig 7 5 p 26 Fig 7 5 Location of DC connections The negative DC pole of the string
117. t failure Failure during Italian autotest For Italy only gt Repeat the autotest 76 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 12 Diagnostics and Troubleshooting EN LEDs Display message Message description Fault correction PV1 ISO startup warn The startup insulation is too low y gt Check the insulation resistance at the DC side of the PV modules O PV1 ISO running warn The insulation voltage is too low gt Check the insulation resistance on the PV modules 7 2 PV1 Grounding warn DC DC not correctly grounded gt PV1 Grounding warn gt Check the GND connection f l gt Check the insulation resistance of the GND connection gt Replace the grounding kit if necessary PV1 ISO startup fail The startup insulation is too low 7 C gt Check the insulation resistance at the DC side of the PV modules O PV1 ISO running fail Operating insulation lt 150 kQ 7 C gt Check the insulation resistance at the DC side of the PV modules O PV1 Grounding fail DC DC not correctly grounded X _ PV1 Grounding fail 0 lt gt Check the GND connection O CA PV1 Voltage too low The DC voltage is too low PS gt Check the PV cell voltage shown on the display 416 Current Data PV menu O AZ L1 power reduction Power reduction active for L1 7 S PV1 PW limit to Pn Power limiting active for PV1 PV1
118. t the DC cable into the DC connections for the solar power inverter 5 Check the installation M The PV module is now connected 7 4 4 Grounding DC Side The solar power inverter can be grounded at either the DC side or the DC side The ground connection must be installed near the solar power inverter We recommend using the grounding kit from Delta The DC side of the solar power inverter has an insulation and EN grounding monitor Monitoring can be configured in the 230 Grounding menu see 10 13 Insulation and grounding monitor ing p 63 gt Install the ground kit according to the manual delivered with the kit Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 27 7 Installation 7 5 Connect RS485 ElA485 optional To ensure IP65 protection all unused connec tions and interfaces must be closed using the covers on the solar power inverter 7 5 1 Only the cables described below may be used Standard cables are not permitted General Instructions One or more solar power inverters can be connected to a monitor ing system using the RS485 interfaces see Fig 7 7 p 28 BEBE LODO SENS POO Fig 7 7 Location of RS485 connection The two RS485 interfaces are internally wired 1 1 Each RS485 interface can be used as an input or output If multiple solar power inverters are connected to a moni
119. temp derating Temperature derating active for PV1 Reduced electricity production The internal temperature of the solar power inverter is between 55 and 70 C gt Check the ventilation of the solar power inverter gt Prevent direct sunlight from reaching the solar power inverter Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 77 12 Diagnostics and Troubleshooting 12 4 Logging the Messages All important events and messages are logged in the solar power inverter The following logs are created e External events e Internal events e Log as per VDE AR N 4105 e Log as per BDEW e Change events e Autotest for Italy 12 4 1 External events log 12 4 2 Internal Events Log Menu 620 Internal log Description Internal events are problems within the solar power inverter Inter nal events should be resolved by Delta Solar Support Accessing the Menu Main menu gt Diagnostic amp Alarm gt Internal Log In the main menu press the buttons to select Diagnostic amp Alarm and then press the J button SOLIVIA 1 Production info PDiagnostic amp Alarm Inverter info Menu 781 External Events Description External events occur outside the solar power inverter and affect its operating behavior Accessing the Menu Main Menu gt Production Info gt Event Journal gt External Events SOLIVIA USB features PProduction
120. ter offers some optional functions available for all grids see 10 Settings p 52 gt Oncompletion of commissioning save the settings see 11 5 Saving settings p 68 and the swap data see 11 7 Saving swap data p 70 on a USB stick so that you can use this information later 40 Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 8 Commissioning 8 7 Commissioning by loading the settings from another solar power inverter It is possible in all countries and for all grids to load the settings from another solar power inverter A amemon O The IP 65 degree of protection is no longer guaranteed when the USB interface protective cover is removed gt Only remove the protective cover when necessary gt Where possible use a Micro USB stick The protective cover is designed to be screwed down over a Micro USB stick DC DISCONNECT Installation gt Language continue English Installation Language English continue Load USB data Insert USB Pendrive and press ENTER Load USB data Load settings Load swap data 1 If you have not already done so save the settings of the other solar power inverter to a USB drive see 11 5 Sav ing settings p 68 Check all connections and cables for damage and correct seating Correct the installation if necessary Switch on the DC isolating switch The startup process of t
121. that was set Example You have a SOLIVIA 5 0 EU G4 TR and the maximum active power Pmax at commissioning is limited to 4 kW If you set 80 in the 511 Power Reduction menu the maxi mum permitted active power is calculated as 4 kW x 80 3 2 kW Accessing the Menu Main Menu gt User Settings gt Active PwCtrl gt Power Reduction SOLIVIA 1 Production info PUser settings Diagnostic amp Alarm In the main menu press the buttons to select User Settings and then press the button Changes could affect 2 Press the button to confirm energy production Ask your installer for assistance Press the buttons to select Active PwCtrl and then press the button 500 User settings 3 PActive PwCtrl Reactive PwCtrl 510 Active PwCtrl 4 Press the buttons to select Power Reduction and PPower reduction then press the 2 button Power vs freq 511 Power reduction 5 Press the button to change the value PMax power 0 Configurable Parameters Display Text Designation Description Max power Maximum active Limits the active power to power the set value 56 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 10 Settings 10 9 3 Active Power by Frequency P f Menu 512 Power Frequency Description Allows the statistics to be reset The currency and credit per kWh can also be
122. the buttons to select continue and then press the J button The Date and Time menu is displayed To change the value press the button and then set the value using the buttons Press the button to apply the value Press the buttons to select continue and then press the button The RS485 menu is displayed NOTE Steps 10 and 11 are only necessary when the mode User was set in Step 9 Available Umax settings 253 264 V corresponds to 110 115 of 230 V default is 253 V NOTE If you change one of the val ues you must fill out the provided label after commissioning and place it next to the type plate NOTE The configured values can only be changed after commissioning with a PIN NOTE The configured values are displayed after commissioning in the 131 View Grid Setup menu Available date formats DD MM YYYY DD MM YYYY DD MM YYYY MM DD YYYY MM DD YYYY MM DD YYYY YYYY MM DD YYYY MM DD YYYY MM DD Available time formats 12h 24h 36 Operation and Installation Manual for SOLIVIA 10 0 11 0 EU G4 TR 8 Commissioning PID 1 RS485 Termination On continue ENTER to confirm ESER to reselect 18 To change the value press the button and then set the value using the buttons Press the button to apply the value 19 Press the buttons to select continue and then press the button The completion screen will be displ
123. tion info PUser settings Diagnostic amp Alarm Changes could affect 2 energy production Ask your installer for assistance 500 User settings 3 Active PwCtrl PReactive PwCtrl Fix cosPhi ind 1 00 Fix cosPhi ind 1 00 520 Reactive PwCtrl 6 Mode Fix cosehi Cos phi ind 1 00 Configurable Parameters In the main menu press the buttons to select User Settings and then press the button Press the button to confirm Press the buttons to se lect Reactive PwCtrl and then press the button Press the buttons to select Mode and then press the button Press the buttons to set Mode to Cos phi P and then press the f button Press the buttons to select the parameter Cos Phi Press the J button to change the value Display Text Designation Description Cos Phi cos Defines cos to be the set value inductive capacitive 1 0 8 Description This function is available for the grid DE MVD This function allows selection of a constant reactive power Accessing the Menu Main Menu gt User Settings gt Reactive PwCtrl SOLIVIA 1 Production info PUser settings Diagnostic amp Alarm Changes could affect 2 energy production Ask your installer for assistance 500 User settings 3 Active PwCtrl PReactive PwCtrl 520 Reactive PwCtrl 4 Fix cosPhi ind 1 00 520 Reactive PwCtrl
124. toring system using the RS485 a separate RS485 ID must be configured for each solar power inverter The solar power inverters have an integrated RS485 termination resistor that can be activated and deactivated A separate external RS485 termination resistor is not required For an individual solar power inverter and the last solar power inverter in a sequence the RS485 termination resistor must be activated The RS485 ID and RS485 termination resistor can be set during commissioning see 8 Commissioning p 30 and during ongo ing operation see 10 6 RS485 ElA485 Settings p 54 Pin Assignments 5 Assignment Reserved Reserved Reserved GND Reserved Reserved TX A RX_B mike LH 8 1 o alo Juan 4 0 7 5 2 Required Tools and Accessories Not included in delivery Connection cable from solar power inverter to monitoring device Connection cable from solar power inverter to solar power inverter You can order the required accessories from Delta Accessories Delta Part Num ber Connection cable from solar power inverter to solar power inverter Push pull cable by Harting IP67 one side with blue cable manager other side with white cable manager 15m 3081186300 3 0m 3081186500 5 0 m 3081186600 10 0 m 3081186200 20 0 m 3081186400 Connection cable from solar power inverter to monitoring device e g SOLI
125. ucture Submenu Contents Description 410 Current Data Current data for power AC PV 9 2 Actual data p 48 insulation 420 Day Statistics 430 Week Statistics 440 Month Statistics 450 Year Statistics 460 Total Statistics Statistics for AC PV and ISO 9 3 Other statistics p 50 470 Feed In Settings Settings for currency and revenue per kWh reset statistics 10 7 Currency and Credit per kWh p 55 480 Event Journal 490 History List of operating state messages Statistics for the last seven days the solar power inverter was in operation 12 4 1 External events log p 78 9 3 Other statistics p 50 Operation and Installation Manual for SOL10 0 1TR3 E4 and SOL11 0 1TR3 E4 47 9 Production information 9 2 Actual data Menu 410 Current Data Description Displays the current production data for the solar power inverter Accessing the Menu Main Menu gt Production Info gt Current Data SOLIVIA 1 Inthe main menu press the 4 USB features buttons to select Produc PProduction info tion Info and then press the Diagnostic amp Alarm 2 button 408 Production info 2 Press the buttons to HHHH select Current Data and then PCurrent data press the button Day statistics 419 Current data 3 Press the buttons to se lect the required statistics and PCurrent overview then press th

Download Pdf Manuals

image

Related Search

Related Contents

GuideDepannage_ROCHE  prodotti per la pulizia irisun texout  SW-2GT-2SFP 4-Port Gigabit Switch USER MANUAL  ETM/V 214-325 - Jungheinrich  Full Text Mapper V2.0 User Manual  Brochure Swisscom  マイページについて  Troy-Bilt 830 Lawn Mower User Manual  LG L194WS User's Manual  ISW-10D デジタル変位センサ用スイッチボックス  

Copyright © All rights reserved.
Failed to retrieve file