Home

Handy Home Products 19948-6 Instructions / Assembly

image

Contents

1. If you are assembling a 12 or 14 Gazebo please begin with step 4 B if you are assembling a 10 Gazebo please go to step 4 A EZH qe For a 10 Gazebo assemble Rafters with pre drilled holes facing up by joining two Rafters on opposite sides to Ridge Block with predrilled Flush holes in Ridge Block facing down using two 3 Q at top screws through predrilled hole in top of Rafter Once two Rafters are connected to Ridge Block carefully turn over and attach two 3 screws through predrilled holes in Ridge Block into Rafter The 10 San Marino has eight Rafters Do not assemble remaining rafters at this time continue with step 4 C Rafter Rafter 10 Gazebo Ridge Block Eight Pre Drilled Holes Facing Down 3 Screw BOTTOM VIEW For 12 and 14 Gazebo assemble Rafters by joining two Rafters on opposite sides to Ridge Block using two 3 screws through predrilled hole in top of Ridge Block Leave a 1 2 gap between ae Rafter the top of the rafter and the Ridge block pum Once two Rafters are connected to Ridge Block Ridge Block Pre Drilled carefully turn over and attach two 3 screws through predrilled holes in Ridge Block into Rafter The 12 has ten Rafters and the 14 has Twelve Rafters Do not assemble remaining rafters at this time continue with step 4 C 8 San Marino RAFTER AND RIDGE BLOCK ASSEMBLY CONTINUED ERN x hs ee angle Centered S lt corner of
2. Optional d Metal L 1 1 4 Bracket Screws Optional Anchor Screws Optional Anchoring of Gazebo OPTIONAL ANCHORING Bracket Heavy Duty Anchors g a ASASSSSSA Optional Bolts 1 2 Concrete Anchor Bolt Optional Heavy Duty Anchoring of Gazebo Install a 2 90 degree metal angle bracket available at most Home Centers and hardware stores inside each corner post using a cement anchor and affixing it to the base with 1 1 4 screws into the post as shown in Fig 2 Local building departments require some sort of anchoring system to meet wind requirements We recommend Simpson HD2A available at most Home Centers and hardware stores or similar for a anchor as shown in Fig 3 You will also need 2 1 2 x3 bolts not included with a rating of 500 Ibs of tension or greater each bolt 2 washers and nuts also for the wall to anchor connection Also you will need a Simpson 1 2 or 5 8 Wedge All anchor Titen Hd or similar available at most Home Cen ters and hardware stores for the anchor to concrete connection If you have a wood floor you would need a 12 long Wedge All and a 6 long for a Concrete slab Anchors need to be imbedded at least 4 1 2 into concrete San Marino 13 INSTALLING ROOF PANELS FOR 10 amp 12 GAZEBO For 14 Models continue with page 15 PARTS LIST 10 GAZEBO Q8 pcs Plywood Triangular Roof Panels PARTS LIST 12
3. Fascia Hoof Pane San Marino 17 Note If installing a Screen Kit skip Step 8 and refer to Screen Kit instruction manual before going to Step 9 Si 1 4 Si 2x4x40 1 4 INSTALLING 2 See uA OO DER Ban Sl L L p LATE Q 9 pcs Sill Plates 2x4 x 40 1 4 QO 18 pcs Corbels 2x4x14 Install Window Sill Plates with ears projecting to the inside of the Gazebo Attach with 2 3 screws and 2 2 1 2 screws as shown in 8 A 3 Screws 12 amp 14 GAZEBO ONLY INSTALLING CORBEL 9 A Lower Corbels are posi tioned and attached to wall post and sill as shown Position 3 4 back from Outside Edge of Sill Plate Secure with 3 screws Note If installing sill from optional Screen Kit Lower Corbels will be flush to outside edge of Sill Plate 18 San Marino SHINGLES METAL CAP 24 Brass pecie o to 50 feet Drip Edge not included for 12 and 14 1 INSTALLING DRIP EDGE 2 amp rdc Shines ot ncludeo for 12 AND SPINDLE O11 Pc Metal Roof Cap O11 Pc Roof Finial QD Utility Knife Upside down First course Caulking the Roof Seams before shingling will improve the water starter course resistance of your Gazebo when installing layers of shingles 3 4 Roofing 7 syl Nail CAUTION Use 3 4 Roofing Nails quy m OCCT Making Ridge D o cap Cutting angle on Ridge Cap Ridge Cap 1 1 i 1 21 1v
4. FLOOR SYSTEM SITE PREPARATION Site must be properly leveled Site should have natural drainage to eliminate puddling under and around the building Site should be covered with plastic film to discourage grass growth under the building and to serve as a vapor barrier Before assembling your gazebo you must first construct a floor system You can A Purchase our optional pre cut Floor Kit B Purchase materials to cut and build your own wooden floor NOTE Our Precut Floor Kits have been designed for normal residential use It is characteristic for the floor panels to Wooden Floor Kit deflect flex during normal use If you intend to store very heavy objects in your Gazebo you may want to consider adding floor joists to reduce the span OR C Install a 4 concrete slab floor system IF USING CONCRETE SLAB FLOOR SYSTEM e Construct 4 Concrete Slab Floor System Upon completion of above steps skip Floor Kit Assembly section and proceed to Step 2 Assembling Wall Panels Concrete Slab Floor System San Marino 3 WOOD FLOOR SITE PREPARATION For optional pre cut floor kit follow assembly instructions included with floor kit It is important to have a solid flat and level foundation for your Gazebo Carefully consider the recommendations listed below prior to creating your foundation LEVEL GROUND INSTALLATION Remove dirt to allow for Floor Frame Shim outside of frame co
5. GAZEBO 10 pcs Plywood Triangular Roof Panels NOTE Make certain the rough cedar sawn side of each Roof Panel is facing down during assembly Fig 1 Roof Panels Should Overhang about 1 Rough sawn Cedar side cai aa Center Panels on or in between 3 4 Marks Plywood side 10 or 12 Roof Panel X a When installing the Roof Panels the rough sawn cedar side should be facing to the inside of your Gazebo Along each Rafter place a mark 3 4 in on each Rafter to help center Roof Panels as shown in Fig 1 and Fig 2 Set first Roof Panel in place on top of Rafters making top of Roof Panels line up where Rafter and Ridge Block meet and nail with one 2 nail at the top of Roof Panel Once top is nailed make sure Roof Panel at bottom is centered between 3 4 marks on both Rafters Once Roof panel is aligned nail with two 2 nails at bottom corners 14 For 10 and 12 continue on page 16 San Marino INSTALLING ROOF PANELS B 13 Pos pic Tanta Roof Panels Large FO R 1 4 A GAZ E BO ON LY C1 12 pcs Temporary Brace 6x14 NOTE Make certain the rough sawn cedar side of each Roof Panel is facing down during assembly 2 Nail Temporary Center Panels on or in Brace connected with 6 3 4 screws between 3 4 Marks Plywood side 2 vai Sed Mark all Roof Panels us i ie 1 from bottom Mark all roof panels 1 From Bottom on Cedar side Rough sawn Cedar side Pla
6. Gusset Bracket Carefully lift the Rafter and Ridge Block assembly on top of the Gusset Brackets at opposite corners of the Gazebo Place Rafter Ends at center of outside corner of Gusset Bracket as shown in Fig 1 Once Rafter is in place attach to Gusset Bracket with two 3 screws through predrilled holes from underside of Gusset Bracket into bottom of Rafter as shown in Fig 2 NOTE Adjust Wall corners in or out to fit San Marino ASSEMBLING AND A EAR piens CONTINUE Install remaining Rafters by insert ing screws through Gusset Bracket as shown in 4 C Fig 2 while holding Rafter in position Install 3 screw through top of Rafter or Ridge Block as shown in 4 A or 4 B top view Once all Rafters are in place install 3 screws in underside of Ridge Block into Rafters as shown in 4 A or 4 B bottom view ASSEMBLING AND ERECTING RAFTERS CONTINUED FOR 12 AND 14 ONLY 4 E For 12 and 14 Gazebo Only For 12 and 14 Gazebos attach Ridge Cap to top of Ridge Block with four 1 5 8 screws as in Fig 1 4 1 5 8 TUUS into each Ridge Cap after Rafters are s 135 installed 2 ce 12 amp 14 GAZEBO qu TOP VIEW COL 12 amp 14 Gazebo Ridge Block For 12 and 14 Gazebos install bottom Ridge Cap cover with 4 1 5 8 Screws and shown in Fig 2 For 12
7. Q8 pcs Plywood Gusset Bracket 12 pcs Plywood Gusset Bracket BRACKETS Q 10 pcs Plywood Gusset Bracket VIEW FROM INSIDE Note Use wood glue not included between Wall Panels and Gussets for added strength and to meet some local building codes Tempo rarily install all gussets with 1 5 8 screws to align walls Remove one gusset apply glue install all screws Continue for all Gussets Rough sawn Cedar side ay facing down Gap may vary in between Gussets 8 1 5 8 Screws ie Wwe each Gusset Install Gusset Brackets with Rough sawn Cedar side facing down using eight 1 5 8 screws for each Gusset Make sure that the Gusset Bracket is flush to the inside of the Wall Panel and that the inside corner is directly over inside corner of Wall Panel as shown in Fig 1 The Gusset Bracket should overhang the outside edge of the Wall Panel by 2 1 2 as shown in Fig 2 This step may require some pulling of the Wall Panel to bring it into proper position Tip to tip measurement on Gus sets is 46 7 8 for 10 Gazebo and 46 3 8 on 12 Gazebo and 46 for 14 Gazebo The gap between Gussets may vary San Marino 7 R A FTE R AN D RI DG E B E Faber es e pee Q 12 pcs Rafters 2x 4x 92 7 8 QM pc Ridge Block 12 Sided B LOC K ASS E M B LY AN D PARTS LIST 12 GAZEBO Q2pc Ridge Cover 12 Sided ERECTING RAFTERS strectes corse Q 1pc Ridge Block 10 Sided U2pc Ridge Cover 10 Sided
8. and 14 Only and after Rafters are Installed Rafter sane TFI each Ridge Cap San Marino 11 PARTS LIST 10 GAZEBO ANCHORING GAZEBO Not included in Kit PARTS LIST 12 GAZEBO C1 Q1 pc Assembled Side Wall and Rafters Q8 pcs Metal L Brackets and Screws Q1 pc Assembled Side Wall and Rafters Q 10 pcs Metal D Brackets and Screws PARTS LIST 14 GAZEBO Q1 pc Assembled Side Wall and Rafters Q 12 pcs Metal L Brackets and Screws Not included in Kit EZH ANCHORING ON WOOD za Put x 108 for 10 Gazebo 137 3 4 for 12 Gazebo 167 for 14 Gazebo WOOD FLOOR OR DECK 10 Floor shown P eS IEAS IEA IES a I 12 FLOOR OR WOOD DECK Anchor to wood floor by predrill ing holes and installing two 3 screws at an angle through corner post into wood floor as shown in Fig 1 There should be equal distance between outside of Gazebo and outside edge of floor all around Gazebo as shown in Fig 1 10 12 and 14 Gazebos are anchored in the same manner 3 Screws Predrill holes VIEW FROM OUTSIDE 6 Equal space on all sides Approx 1 1 2 San Marino ANCHORING GAZEBO CONTINUED PARTS LIST Q Assembled Side Wall and Rafters Q Anchor or Brackets and Screws Not included in Kit Check with our local Building Code Department for any variances D ks
9. finial will be needed for the second tier HANDY d Limited Conditional PRODUCIS Warranty It s Easy l s Handy WARRANTY Handy Home Products warrants the following Every product is warranted from defects in workmanship and manufacturing for one year All hardware and metal components are warranted for two years Trim is warranted for 10 years Waferboard siding and sheathing is warranted for two years SmartSide siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings Mackinaw series buildings siding and trim are warranted for 10 years Phoenix Solar Shed windows are warranted for 1 year Cedar lumber is warranted for 15 years odo com Handy Home Products will repair replace or pay for the affected part In no event shall Handy Home Products pay the cost of labor or installation or any other costs related thereto All warranties are from date of purchase If a cash refund is paid on an affected part it will be prorated from the date of purchase CONDITIONS The warranty is effective only when 1 The unit has been erected in accordance with the assembly instructions 2 The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter 3 The failure occurs when the unit is owned by the original purchaser 4 Handy Home Products has received the warranty registration card within thirty 30 days of purchase and notification of the fail
10. flat to flat or 10 Diameter San Marino 12 actual floor size has to be a minimum of 11 8 3 4 flat to flat or 13 Diameter is recommended San Marino 14 actual floor size has to be a minimum of 14 2 flat to flat or 15 Diameter is recommended 16695 Visit us on the Web at www HandyHome com TREATING YOUR GAZEBO B Staining This Gazebo is constructed of a long lasting western cedar Untreated cedar exposed to sunlight will eventually weather to a silver grey color To validate your warranty and to help keep the original red color read your warranty page on maintaining your Gazebo Applying a minimum of two coats of oil based penetrating stain WITHIN 30 DAYS required by warranty Some sanding to remove rough edges and natural wood stains may be required prior to staining Your Gazebo roof is not waterproof unless it is shingled Caulking the roof seams before shingling will improve the water resistance of your Gazebo STAIN REQUIREMENTS FOR GAZEBOS SIZE OF GALLONS FLOOR SCREEN KIT ae a 12 3 1 5 E NENNEN SENE Bi Tools required Bi Optional tools a Hammer Q Electric Drill w 2 Phillips Tip Q 2 Phillips Screwdriver Q Nail Pouch a Ladder Q 1 8 Drill bit for predrilled holes OQ Tape Measure Wood Glue a Pencil San Marino 10 8 sided Gazebo shown with optional Floor Kit Not Included San Marino 12 10 sided Gazebo not shown San Marino 14 12 sided Gazebo
11. HOME aul PRODUCTS It s Easy It s Handy 1000 Ternes Drive Monroe MI 48162 Toll Free 1 800 437 0784 San Marino 10 12 and 14 Gazebo Revision 2 12 07 Run Made in the U S A BEFORE YOU BEGIN Always wear OSHA APPROVED safety glasses throughout assembly process First Read these instructions thoroughly before you begin assembly Assembly is easiest if you follow the steps in the order shown In a drawing a dotted line represents a part hidden from view like a part under a panel Lumber is graded from only one side Check the part for the most attractive face and make sure to face it to the outside Bi Check all parts Compare parts you have to the list on page 2 If a part is missing circle the part in question in the parts list and call us toll free at 1 800 437 0784 E Assistance required We recommend that you assemble this Gazebo on level ground in the location it will be used Assistance is necessary to handle fit and secure some components Two people are needed for some steps Bi Check local zoning Before starting construction check with your local building code official for any required permits variances etc E Check Floor Kit Size Before starting construction on your floor make sure that you check in the instruction manual to make sure that you are building the correct size floor kit for your Gazebo San Marino 10 actual floor size has to be a minimum of 9 3
12. Nail 3 4 Roofing Nail 1 Roofing Nail B Parts List San Marino 14 Q 11 pcs Pre assembled Wall Panels 44 3 4 x 82 1 2 Q 1pc Pre assembled Door Panel 44 3 4 x 82 1 2 with Spacer Q 1pc Roof Finial Q 1pc Ridge Block 12 Sided Q 1pc Metal Roof Cap C1 12 pcs Plywood Triangular Roof Panels Small Q 12 pcs Plywood Roof Panels Large C1 12 pcs Rafters 2 x 6 x 92 7 8 Q 12 pcs Plywood Gusset Brackets Q 11 pcs Sill Plates Notched 2x4 x 40 1 4 5 8 x 3 1 2 x 46 3 8 x 1 1 2 x 3 3 4 C1 12 pcs Plywood Fascia C1 12 pcs Fascia Trim in Hardware C 2 pcs Ridge 12 Sided Cover 1 2 x 7 1 8 C1 22 pcs Corbels 2x4x 14 Q 12 pcs Temporary Brace 6x14 E Hardware Kit Q 8 3 Screw 8 1 5 8 Screw 8 2 1 2 Screw 3 4 Screw 6d 2 Nail 4d 1 1 2 Finish Nail 3 4 Roofing Nail 1 Roofing Nail SPACER PRE ASSEMBLED WALL PANEL PRE ASSEMBLED DOOR PANEL ROOF FINIAL SILL PLATE A PLYWOOD GUSSET BRACKETS 10 RIDGE BLOCK 12 AND 14 RIDGE BLOCK COVER 12 AND 14 PLYWOOD FASCIA RIDGE BLOCK CORBELS 12 AND 14 ONLY FASCIA TRIM c 14 ROOF PANEL METAL ROOF CAP 2 PIECES 10 AND 12 ROOF PANEL NATIONAL STANDARD LUMBER SIZES Nominal size Actual size 3 4 x 3 1 2 1 1 2 x 3 1 2 1 1 2 x 1 1 2 1 1 2 x 5 1 2 San Marino FLOOR SYSTEM Floor systems not supplied with kit YOU MUST BUILD YOUR GAZEBO ON A
13. ce roof panel pieces as shown in Fig 1 with Plywood side up Place 6x14 temporary brace between to pieces and attach with 6 3 4 screws When installing the Roof Panels the rough sawn cedar side should be facing to the inside of your Gazebo Along each Rafter place a mark 3 4 in on each Rafter to help center Roof Panels as shown in Fig 2 and Fig 3 Next mark on cedar side all Roof Panels 1 from bottom as shown Set first Roof Panel in place on top of Rafters making Bottom 1 mark of Roof Panels line at Rafter ends and nail with one 2 nail at each corner of Roof Panel Once bottom is nailed make sure Roof Panel at top is centered between 3 4 marks on both Rafters Once Roof panel is aligned nail with one 2 nail at top corner San Marino 15 INSTALLING ROOF PANELS CONTINUED 2 Nails every 8 W once all Roof Panels are in place we At noice TT P Follow the same steps as in 6 A to install all remaining Roof Panels only temporarily nail ing in place Once all Roof Panels are in place and fit properly on your Gazebo then nail every 8 with 2 nails 10 model has eight Roof Panels 12 model has ten Roof Panels and 14 has 12 Roof Panels For 14 Gazebo models remove temporary brace when all roof panels are in place and secured with 2 nails every 8 16 San Marino PARTS LIST 10 GAZEBO PARTS LIST 14 GAZEBO l NSTA L LI NG Q8 pcs Fa
14. d be 1 minimium above grade D 4 Sand or Gravel 12 x12 Continuous Footing San Marino 5 ASS E M B LI NG 7 pcs Pre assembled Wall Panels Q 11 pcs Pre assembled Wall Panels WALL PANELS uias a 1 pc Pre assembled Door Panels C91 pc Pre assembled Door Panels PARTS LIST 12 GAZEBO a 9 pcs Pre assembled Wall Panels Pre assembled Door Panels Door Spacer DO NOT REMOVE Widest Bevel on Groun Stand up two adjoining Wall Panels and attach them together using five 3 screws as shown in illustration 2 B HINT Start in middle and work up and down Make sure that the two Wall Panels are flush at the top as shown in Fig 2 Connect all Wall Panels in this same manner making sure not to remove the Door spacer at this time Note Use wood glue not included between Wall Panels for added strength and to meet some local building codes Select desired Door location and position Wall Panels on ground around foundation as shown in Fig 2 A If you are constructing the 12 Gazebo please allow for two additional wall sections when laying out your walls If you are constructing the 14 Gazebo please allow for four additional wall sections when laying out your walls NOTE Wall Panels have beveled edges The widest bevel will face the ground and is the outside of the Gazebo wall as shown in Fig 1 t5 Ht r N 5 3 Screws San Marino INSTALLING
15. erial 42 or Code Treated Post or 12 x12 to be treated 1 ot below Apr ale Pier All above grade material edar CONCRETE PAD FOOTING 8 x 4 Diameter for Treated Post San Marino 1 CONCRETE SLAB SITE PREPARATION It is important to have a solid flat and level foundation for your Gazebo Carefully consider the recommendations listed below prior to creating your foundation CONCRETE SLAB OR HARD SURFACE INSTALLATION Measurements given on the Fig 1 Concrete Slab Dimen GD Concrete Slab Dimensions sions illustration are 1 1 2 larger than the outside dimen sions of the Gazebo You may choose to make your concrete slab larger than the dimensions given Step 5 shows you how to anchor your gazebo Hardware not included in Kit 10 Floor 60 Point to Center Dig out 4 of ground for concrete and 4 for sand gravel per local code so it is level Finish digging 12 wide by 12 deep per local code continuous footing around the perimeter of the pad Use wood forms around the perimeter of gazebo foundation area Use rebar as needed Pour concrete and make sure all points of the concrete top are level and see Fig 2 46 12 Floor OA Flat to Se Flat TS UE Point to Center bac r 14 Floor UTE Flat t 86 1 2 Flat Midde to 89 916 Center J 4 Point to 46 3 8 Center t5 The top of your concrete pad 4 Concrete pad shoul
16. not shown HOME jii PRODUCTS It s Easy It s Handy San Marino 10 12 and 14 Gazebo 8 Sided 10 Sided E Parts List San Marino 10 Q 7 pcs Pre assembled Wall Panels 44 3 4 x 82 1 2 O11 pc Pre assembled Door Panel 44 3 4 x 82 1 2 with Spacer 11 pc Roof Finial O1pc Ridge Block 8 Sided 11 pc Metal Roof Cap Q 8 pcs Plywood Triangular Roof Panels Q 8 pcs Rafters 2 x 4 x 62 3 4 Q 8 pcs Plywood Gusset Brackets Q 7 pcs Sill Plates Notched 2 x 4 x 40 1 4 Q 8 pcs Plywood Fascia 5 8 x 3 1 2 x 46 7 8 8 pcs Fascia Trim in Hardware 3 8 x 1 1 2 x 3 3 4 B Hardware Kit C 8 3 Screw 8 1 5 8 Screw 8 2 1 2 Screw 6d 2 Nail 4d 1 1 2 Finish Nail 3 4 Roofing Nail 1 Roofing Nail B Parts List San Marino 12 C19 pcs Pre assembled Wall Panels 44 3 4 x 82 1 2 11 pc Pre assembled Door Panel 44 3 4 x 82 1 2 with Spacer Q 1pc Roof Finial Q 1pc Ridge Block 10 Sided Q 1pc Metal Roof Cap 110 pcs Plywood Triangular Roof Panels 110 pcs Rafters 2 x 6 x 78 3 8 110 pcs Plywood Gusset Brackets O9pcs Sill Plates Notched 2x4 x 40 1 4 110 pcs Plywood Fascia 5 8 x 3 1 2 x 46 3 8 Q 10 pcs Fascia Trim in Hardware 3 8 x 1 1 2 x 3 3 4 C42pcs Ridge 10 Sided Cover 1 2 x 5 1 4 Q 18 pcs Corbels 2x4x 14 WB Hardware Kit Q 48 3 Screw 8 1 5 8 Screw 8 2 1 2 Screw 6d 2 Nail 4d 1 1 2 Finish
17. rners as needed Follow local codes for anchoring requirement or see local home center for recommendation UNEVEN GROUND INSTALLATION Use treated 4 x 4 posts or concrete piers on each corner and in center of deck Hole depth will vary according to local building codes Cut center post 1 1 2 shorter to allow for Base Plate as shown in Fig 1 Nail or screw Deck to top of 4 x 4 posts Use Simpson Tie or similar for each Concrete pier See local home center HARD SURFACE INSTALLATION Do Not Use the Base Plate in our Floor Kit for Hard Surfaces Measurements given on the illustration are 1 1 2 larger than the outside dimensions of the Gazebo You may choose to make your own floor larger than the dimensions given Step 5 shows you how to anchor your gazebo Hardware not included in Kit D p ois of Floor Kit Wood Floor Dimensions 10 Floor 60 Point to Center In NN Y 46 12 Floor 7 140 3 4 Flat to Flat 74 Point NL EE me 14 Floor 173 Flat t S644 2 Flat Middle to E 899 16 Center A Point to Center Tested Post Concrete Pier 4x4 Treated Post or 12 x12 X Concrete Pier WOOD FLOOR KIT J2 J2 WOOD FLOOR KIT Minimum of Es Base Plate GRADE 6 of Air Space 1 1 2 BEL TE 4x4 All below grade mat
18. scia 5 8 x 3 1 2 x 46 7 8 Plywood 112 pcs Fascia 5 8 x 3 1 2 x 46 Plywood F ASCI A Q8 pcs Fascia Trim 3 8 x 1 1 2 x 3 3 4 Q 12 pcs Fascia Trim 3 8 x 1 1 2 x 3 3 4 PARTS LIST 12 GAZEBO C 10 pcs Fascia 5 8 x 3 1 2 x 46 3 8 Plywood Q 10 pcs Fascia Trim 3 8 x 1 1 2 x 3 3 4 7 A cD Place a mark 3 4 in on end of Rafter as shown in Fig 1 Center Fascia on Wall Panels in between corners and 3 4 marks and butt Fascia to bottom of Roof Panels Tack on the Fascia to the Gus set Brackets at each corner with one 1 1 2 Finish Nails Con tinue attaching remaining seven pieces of Fascia for 10 Gazebos nine pieces for 12 Gazebos and eleven pieces for 14 Gazebos Once all Fascia are in place finish nailing along bottom edge and top of Roof Panel with five more 1 1 2 Finish Nails 10 12 and 14 Gazebo Fascia are installed in the same manner Attach Fascia Trim over seam where two Fascia panel pieces meet and attach with two 1 1 2 Finish nails through Fascia Trim into Fascia Panel as shown in Fig 2 Pre drilling is recommended Rafter End ta Rough sawn Cedar side 1 7 Fascia butts up to Roof Panel Rafter 3 4 Fascia NI Attach Fascia Trim with two 1 1 2 Finish Nails Two 1 1 2 Finish Nails to hold all Fascia in place then once all Fascia in place add five more 1 1 2 Finish Nails e Roof Panel
19. te slab or two and one half inches 2 1 2 from the ground when building is erected or constructed on a treated wood floor kit Water from sprinklers must be kept off unit In no event will Handy Home Products be responsible for any indirect incidental consequential or special damages nor for failure s that are caused by events acts or omissions beyond our control including but not limited to misuse or improper assembly improper maintenance which eventually leads to rot or decay and acts of God Handy Home Products will not be held responsible for any labor costs incurred to construct your unit This warranty gives you certain specific rights that vary from state to state CLAIM PROCEDURE To make a claim under this warranty you can either call 800 437 0784 or prepare a letter Please have ready the information below when you call or include the information when writing T The model and size of the product 2 A list of the part s for which the claim is made 3 Proof of purchase of the Handy Home Products item as shown on the original invoice 4 Run code as listed on the yellow warranty card enclosed in the product package Mail the above information to Handy Home Products Attn Customer Service 1000 Ternes Drive Monroe MI 48162 WARRANTY TERMS MAY VARY OUTSIDE THE U S A IMPORTANT This is your warranty certificate Please complete and mail your warranty card to properly validate your warranty ldr 02 12 07
20. th won ZTE 1 Roofing Nail on rd uu San Marino 19 P T i Edge TES the recommended Drip Edge around the perimeter of the Roof Panels before shingling the Roof Use 3 4 Roofing Nails to install Drip Edge Snip the top of the Drip Edge at corners and bend to meet next Roof Panel Install a starter course of Shingles consisting of a row of Shingles turned upside down Attach with 3 4 Roofing Nails that are supplied with kit After starter course is completed cut excess shingles off along seam of Roof Panels with Utility Knife as shown in 10 A Next place first course of shingles directly over starter course in normal position and nail with 3 4 roof nails Cut excess material off in the same manner as starter course Continue up Roof Panel overlapping Shingles as you go and cutting off excess To create Ridge Caps take a shingle and cut it into six equal pieces as shown in Fig 1 Cut about 1 3 of Shingle at top on an angle as shown in Fig 2 Install Ridge Caps Fig 3 over seams where the excess Shingle material was cut off making sure to cover each of the angled cut ends of the Ridge Cap Attach each Ridge Cap with two 1 roof nails sup plied with kit Fig 4 Place Metal Roof Cap on top of shingled Gazebo and install Finial through hole in cap and screw down snugly Fig 5 Note if you have purchased the second tier option continue to shingle the complete roof as the metal roof cap and
21. ure in writing within the warranty period specified above 5 Handy Home Products has had reasonable opportunity during the sixty 60 days following receipt of notification to inspect and verify the failure prior to commencement of any repair work REQUIREMENTS Storage Buildings amp Playhouses To validate your warranty it is necessary to properly maintain your Handy Home Products unit shingle the roof and paint or solid colored stain the siding using 100 acrylic latex exterior product with a minimum of two 2 coats within thirty 30 days of assembly caulk above all doors and all horizontal and vertical trim boards paint and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos amp Timber Buildings To validate your warranty it is necessary to properly maintain your Handy Home Products unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative an exterior oil based semi transpar ent stain an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement The minimum ground clearance for siding must be one half inch 1 2 inch from concre

Download Pdf Manuals

image

Related Search

Related Contents

Hyundai N700E Inverter-Technical Specifications  Technical Specification  d_e_ATMOS SE 6501.indd  VANTAGE 500 DEUTZ - Lincoln Electric  Brother NC 9100h (4977766610520) Print Server  Réseau d`Observatoires de Surveillance Ecologiques à Long Terme  CED370/51 Philips Car entertainment system  AdBlue® IBC用給水ユニット紹介パンフレット  T-REX and X-ERT User Manual  capas jurisprudencia_2013 - Site seguro do STJ  

Copyright © All rights reserved.
Failed to retrieve file