Home

DreamLine DL-6114L-04CL Installation Guide

image

Contents

1. Fig 36 Ver 1 Rev 1 21 Product maintenance To insure long lasting life for your acrylic back walls wipe them off after each use with a soft cloth To clean the acrylic back walls use non abrasive sprays or cream based cleaners Never use abrasive cleansers metal brushes or scrapers that could scratch or dull the surface Acrylic cleaning procedure Acrylic should be cleaned with warm water and a clean nonabrasive cloth If desired a mild non abrasive detergent may also be used Use only light pressure when cleaning Avoid rubbing dirt or grit into the surface Turn the cloth often and replace with a clean cloth frequently Dry by blotting gently with a clean dry cloth DO NOT USE Window cleaning sprays alcohol kitchen abrasive compounds or solvents such as acetone gasoline or thinners Do not use ammonia based cleaning solutions on the acrylic as it will eat into the surface and cause it to damage How do you get scratches out of Acrylic For light scratches use a buffing compound such as a car wax Use a buffer or lightly polish the surface by hand until scratches disappear TABLE OF CONTENTS Required Tools Torinstallaton corinds intros heunean Rue tieedatetstics Page 2 Detailed Diagram with Packing List eeeeeeea aaa Page 3 Preparation for installation of Back Panel 09 Pages 4 7 Prep
2. See Fig 25 for details 20 Apply the sealant to the entire surface of the reverse side of the Side panel 01 Also apply the sealant around the drilled holes See Fig 26 for details Fig 25 Fig 26 Ver 1 Rev 1 21 Slide the narrow edge of the Side panel 01 behind the Corner cover 02 Align trimmed edge of the Side panel from Step 9 with the marked line on the wall in Step 7 and push the Side panel against the wall NOTE Make sure the drilled holes on the Side panel are also aligned with the fixtures on the wall See Fig 27 for details 22 Apply sealant to the entire surface of the reverse side of the other Side panel 01 See Fig 26 for details Slide the narrow edge of the other Side panel 01 behind the Corner cover 02 Align trimmed edge of the Side panel from Step 9 with the marked line on the wall in Step 7 and push the Side panel against the wall Align the top of both Side panels and the Back panel before the sealant sets Apply equal pressure to the whole surface of the Acrylic panels from top to bottom See Fig 28 for details Fig 27
3. es W s W1 D1 A D Z MODEL SPECIFICATION D in W in D1 in W1 in DLT 1132320 32 x32 32 32 16 16 DLT 1136360 36 x36 36 36 15 18 DLT 1136480 36 x48 36 48 15 24 DLT 1130600 30 x60 30 60 15 30 DLT 1132600 32 60 32 60 15 30 DLT 1134600 34 60 34 60 15 30 DLT 1136600 36 x60 36 60 15 30 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Left Hand Drain Configuration P p W Wi 1 D1 D T J Go MODEL SPECIFICATION D in W in D1 in W1 in DLT 1130601 30 x60 30 60 15 12 DLT 1132601 32 x60 32 60 15 12 DLT 1134601 34 x60 34 60 17 12 DLT 1136601 36 x 60 36 60 18 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Right Hand Drain Configuration 3 Ww D1 GR NEJ MODEL SPECIFICATION D in W in D1 in W1 in DLT 1130602 30 x60 30 60 15 12 DLT 1132602 32 x60 32 60 15 12 DLT 1134602 34 x60 34 60 17 12 DLT 1136602 36 x60 36 60 13 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 NEO SHOWER BASE u W C peee i 4 c A A ey W B p A a MODEL SPECIFICATION W in A in B in C in DL
4. 9 Determine the position of both Side panels 01 D L D NOTE Line Ma Line a The narrow edge of the Side oa SE panel fits behind the corner cover and cannot be trimmed b The wide edge of the Side panel can be trimmed to the size of your measurements from Step 8 Measure from the narrow edge of the Side panel and place a mark at a distance of D that you measured in Step 8 Draw a straight line from top to bottom along the wide edge of the Side panel See Fig 11 for details Fig 11 10 Place the Side panel 01 on a flat piece of plywood or particle board Use a sharp industrial knife and a T square to score along the marked wide ends of the Side panel and continue scoring until you have fully R cut through the panel gt NU NMO N S N 7S GAMA Vhs See Fig 12 and Fig 13 for details AW QQY KINANNRA RR GI X V QQ SON SWW aaa aa a 3 5 55 8ISIODUJ 1 Ver 1 Rev 1 9 11 Take exact measurements of the fixture on the wall e from the 1 one inch line in the corner of the shower to the fixture A B C e from the bottom of the wall of the shower to the fixture E F See Fig 14 for details 1 i RE E L B Fig 14 V
5. DREAMLINE ream in style Visions Shower Door Base amp Wall Kit SHOWER Door SHOWER BASE AND BACKWALLS KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page Pa Pa A Z L a A A u 2 STEP 1 Install Shower Base ower Base Installation Instructions STEP 2 Install Shower Backwalls ower Backwalls Installation Instructions STEP 3 Install Shower Door ower Door Installation Instructions Please read these instructions carefully before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Kit please visit www BathAuthority com lt QREAMLINE ream in style VISION SHOWER DOOR amp TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to t
6. 3 Install all of the required plumbing and drainage before securing the shower Have a competent and licensed if required by local code plumber or tradesman do and or approve your plumbing installation 4 Please insure that prior to the installation the installation surface is leveled and solid and will be able to support the total weight of the unit Also make sure the walls are at right angles While some adjustment in leveling of the door is possible irregular installation surface level or improper angle of side walls will result in serious problems for your installation Please note that some adjustments and drilling might be necessary during the installation process Note If glass has silk print or molded designs please make sure that clear side faces inside the shower Tools Required Drill bit Drill bit Tape Phillips EGW e Caulk Measure Pencil each O 5 16 0 1 8 RS A 5 D R au Level Gun Ba dE l Hammer Miter saw or Hacksaw Rev 1 6 2 Detailed Diagram of Shower Door Components 10 9 8 7 tte I lt 3 2 1 11 l Truman M A gt 12 5 Jumm 4 pi 6 15 16 17 Packing List 01 Glass profile 2pcs 10 Round head screw ST4 2x30 8pcs 02 Wall profile 2pcs 11 Round head screw ST4 2x25 8pcs 03 Guide rail 2pcs 12 Round head screw ST4 2x10 4pcs 04 Glass door 2pcs 1
7. PARTS ONLY WARRANTY This warranty is extensive in that it covers replacement of all defects LABOR CHARGES AND OR DAMAGE INCURRED IN INSTALLATION REPAIR OR REPLACEMENT AS WELL AS ANY OTHER KIND OF LOSS OR DAMAGE ARE EXCLUDED COMMERCIAL USE AND OTHER EXCLUSIONS This warranty excludes all industrial commercial and business usage whose purchasers are hereby extended a one 1 year limited warranty from the date of purchase for shower and tub doors a three 3 month limited warranty from the date of purchase for vanities and sinks with all other terms of this warranty applying except the duration of the warranty DREAMLINE JETTED AND STEAM SHOWER CABINS DREAMLINE SHOWER COLUMNS AND DREAMLINE SHOWER SEATS ARE NOT INTENDED FOR COMMERCIAL USE AND THERE IS NO WARRANTY EXTENDED FOR THESE PRODUCTS FOR COMMERCIAL USE DreamLine hereby disclaims all warranties for products sold as dealer or store displays DreamLine hereby disclaims all warranties for products used outside of the United States or Canada whether expressed or implied including but not limited to the implied warranties of merchantability and fitness for a particular purpose WARRANTY TERMS DreamLine will at its election repair or replace the product found by DreamLine in its sole judgment to be defective within the warranty period under normal residential use and maintenance The replacement of a product is limited to supplying a replacement product or part same as existing or if not ava
8. drill bit and insert the Wall Anchors 06 See Fig 20 and Fig 21 for details Yo Wp Fig 19 05 16 Fig 20 Ver 1 Rev 1 ATTENTION Installation of all Acrylic panels must be finished before the sealant sets for easy leveling and adjustments 17 Apply the sealant to the entire surface of the reverse side of the Back panel 09 See Fig 22 for details Wp Fig 21 Wp Fig 22 Vo Wp Ver 1 Rev 1 18 Slide the right edge of the left Back panel 09 all the way behind the Center cover 10 and push the Back panel against the wall Slide the left edge of the right Back panel 09 all the way behind the Center cover 10 and push the Back panel against the wall as well You can adjust the position of the Back panels before the sealant sets Apply equal pressure to the whole surface of the Back panels from top to bottom See Fig 23 and Fig 24 for details Fig 24 Fig 23 Ver 1 Rev 1 02 to the corner of the shower using the Countersunk screws ST4 2x30 07 Do not fully tighten the screws at this time leave them loose for further installation 19 Mount the Corner cover 1
9. 1 Side Panel Wall 4 Decorative Molding Side Panel Decorative Molding 4 a Fig 31 Fig 32 Ver 1 Rev 1 27 Determine the desired height for the wat Glass shelves 05 and mark the LA locations on the wall 5 NOTE The Glass shelves can be installed either two in one corner or one in each Glass Shelves Installation Instruction 1 See Fig 33 for details G H 1 I Fig 33 3 1 2 28 Mark the location for the Shelf brackets 04 according to 3 1 2 the measurements in Fig 28 and Fig 29 1 Drill the holes using 05 16 drill bit and insert the Wall kama anchors 06 3 2 See Fig 34 for details 1 NAS 5 16 s 1 3 Fig 34 Ver 1 Rev 1 20 29 Mount the Shelf brackets 04 to the wall using the Countersunk screws ST4 2x30 07 NOTE the padded set screw of the Glass bracket should be facing down Slide the upper Glass shelf 05 into the upper Shelf brackets and tighten the set screws at the bottom of the brackets Then slide the bottom Glass shelf in place Tighten the set screws on the bottom Shelf brackets as well See Fig 35 and Fig 36 for details
10. 12 Fasten the top and the bottom Wheel assemblies 17 to the Glass door 04 The top wheels can adjust the door level with the 2 adjustable bolt and lock nut The bottom wheel has a press button to fix the wheel on to the bottom Guide rail 03 Note The lock nut of the upper wheel and the press button of the bottom wheel should be 3 pointing up See Fig 11 for details Fig 11 13 Slide the top door wheels into the 1 3 top Guide rail 03 Push the 1 Lan Guide rail by pressing down the bottom wheels into the bottom button on the Wheel assembly Use the Phillips screwdriver 2 do o ra not use power screwdriver to adjust upper wheels make sure they move smoothly and the door closes tight See Fig 12 for details Fig 12 Rev 1 6 14 Install the Handles 06 to the Glass doors 04 Press the anti water strips 08 on the vertical edges of the Stationary glasses 05 and both vertical edges of the Glass doors Press the Magnetic strips 07 on the vertical edges of both Glass doors for tight closing See Fig 13 for details Fig 13 15 Do the fi
11. N Fig 28 Ver 1 Rev 1 23 Once all panels are aligned fasten tight the Corner cover 02 to secure the Side panels 01 and Back panels 09 Cover the screw holes with the Decorative covers 08 See Fig 29 for details 24 Fasten tight the Center cover 10 to secure the Back panels 09 Cover the screw holes with the Decorative covers 08 See Fig 30 for details Fig 29 Fig 30 Ver 1 Rev 1 ATTENTION Prior to the next step please be sure the part of the wall for installation of the Decorative edge molding 03 is clean dry and free from soap oil and any construction debris 25 Gently remove the plastic tape from the adhesive side of the Decorative edge molding 03 and firmly press it to the edge of the Side panel 01 from top to bottom See Fig 31 for details 26 Apply caulk along the top edges of R A the Side panels 01 and the Back ak panels 09 A Apply caulk along the connection of the bottom edges of the Side panels and bottom edges of the Back panels with the Shower base See Fig 32 for details ATTENTION Installation of your QWALL 5 Acrylic shower wall is complete If you want to install Glass shelves 05 to your Shower follow to the next step
12. 3 Flat head screw ST4 2x15 4pcs 05 Stationary glass 2pcs 14 Decorative cover 4pcs 06 Handle 2pairs 15 Wall anchor 8pcs 07 Magnetic strip pair 16 Glass holder 4pcs 08 Anti water strip 4pcs 17 Wheel assembly 4pairs 09 Single side strip 2pcs NOTE Unpack your unit carefully and inspect it Lay it out and identify all parts using parts diagram and part list in your manual as a reference Before discarding the carton check for small hardware bags that tend to fall to the bottom of the box If any parts are damaged or missing please contact DreamLine for replacement Rev 1 6 1 Measure the distance between two walls This distance is marked as W See Fig 1 for details 2 Your Guide rails 03 have been precut for the installation between Shower Door Installation the walls with a distance of 60 If W 60 then it is unnecessary to cut the Guide rails and you can continue to Step 3 If W lt 60 then you will need to cut the Guide rails from both ends a The length to cut off will be L 60 W L 2 See Fig 2 amp Fig 3 for details Fig 1 4 e 4 gt sf a Ek ba rel Fig 2 Rev 1 6 3 Ifthe Guide rails 03 have been cut you will need to reinstall the roller stoppers on each Guide rail on both sides where it has been cut Remove existing stopper Mark the dr
13. 8 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Diagram of the Shower Base in a Cross Section Finished Wall Cement board Shower Base o 2 x4 Stud Mortar Plaster Ban Drain 2 PVC Waste Pipe SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 11 Shower Base Installation Preparation 1 Ensure that the floor and the studs are at right angle Provide a 5 x5 opening in the sub floor for the drain The 2 PVC waste pipe should extend above the surface of the sub floor according to the drain installation instructions and the height of the Shower base Refer to the product drawings in these installation instructions for the drain location See Fig 1 and Fig 2 for details 2 PVC Waste Pipe 5 x5 Opening See Product Chart for Drain Location Fig 1 2 PVC Waste Pipe 5 x5 Opening See Product Chart for Drain Location Fig 2 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 2 Install the shower drain NOT PROVIDED according to the drain installation manual supplied with the drain See Fig 3 for details 3 Place the tray into the designated position so that the Drain Body drops around the Drain Pipe and butt the Shower Base up against the studs See Fig 4 for details Lift an
14. Back Panel to fit your measurement See Fig 5 for details Fig 5 6 Measure from the narrow edge of the by Back panel 09 and place a mark at a ine distance of W 2 that you measured a in Step 3 r From this mark draw a straight line by from top to bottom along the wide L edge of the Back panel 5 See Fig 6 for details Line to cut Fig 6 Ver 1 Rev 1 7 Place the Back Panel 09 onto a flat piece of plywood or particle board Use a sharp industrial knife and a T square to score along the marked side ends of the Back panel and continue scoring until you have fully cut through the panel See Fig 7 and Fig 8 for details z UNIW NIS NESE WG Fig 8 day Ver 1 Rev 1 Preparation for Installation of Side Panels ATTENTION If you are installing a shower door with a wall profile you can hide the edge of the Side panel 01 behind the wall profile See Fig 9 for details 8 Measure the side walls of the shower from the 1 one inch line in the corner g from Step 1 to the distance where you want Side panels 01 to end The distance is D See Fig 10 for details 1 Side Panel Wall Profile Wall Wu xX 2 Side Panel Wall Profile Wall Fig 9 Ver 1 Rev 1
15. T 2036360 36 x36 36 18 5 16 25 12 DLT 2038380 38 x38 38 20 5 16 25 12 DLT 2040400 40 x40 40 225 16 25 14 3 8 DLT 2042420 42 x42 42 24 5 16 25 14 3 8 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 QUARTER ROUND SHOWER BASE MODEL SPECIFICATION W in C in R in DLT 7033330 33433 33 12 21 5 8 DLT 7036360 36 x36 36 12 21 5 8 DLT 7038380 38 x38 38 12 21 5 8 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration W C c AN O w r MODEL SPECIFICATION W in C in DLT 1032320 32 x32 32 12 DLT 1036360 36 x36 36 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Left Hand Drain Configuration MODEL SPECIFICATION D in W in D1 in W1 in DLT 1034481 34 x48 34 48 17 12 DLT 1036481 36 x48 36 48 18 12 DLT 1036601 36 x 60 36 60 18 12 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Right Hand Drain Configuration w I D1 E MODEL SPECIFICATION D in W in D1 in W1 in DLT 1034482 34 x48 34 48 17 12 DLT 1036482 36 x48 36 48 18 12 DLT 1036602 36 x 60 36 60 1
16. a long lasting finish wipe off the metal parts after each use with a soft cloth Do not use abrasive cleaners or cleaning products containing ammonia bleach or acid If accidentally used rinse the surface as soon as possible to prevent finish peeling or corrosion After cleaning the shiny finishes rinse thoroughly and wipe dry with soft cloth Clean stainless steel surfaces at least once a week When applying stainless steel cleaner or polish work with not across the grain Never use abrasive sponge or cloth steel wool or wired brushes Rev 1 6 11 lt QREAMLINE ream in style QWALL 5 2 2 Back Panels SHOWER ACRYLIC WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page Please read these instructions carefully before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Back Wall please visit www BathAuthority com Ver 1 Rev 1 Preparation 1 A
17. al to completely harden before applying weight to the bottom of the shower base Install the cement board or the wallboard above the tile flanges and secure it to the studs Put the tiles or other finishing material over the cement board leaving 1 8 gap between the bottom of the tile and the splash rim of the shower base Use caulk to fill that gap See Fig 8 and Fig 9 for details SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Fig 9 Product maintenance To insure long lasting life for your acrylic back walls wipe them off after each use with a soft cloth To clean the acrylic back walls use non abrasive sprays or cream based cleaners Never use abrasive cleansers metal brushes or scrapers that could scratch or dull the surface To insure long lasting life for your glass shower products wipe them off after each use with a soft cloth Rinse and wipe of the glass using either soft cloth or squeegee to prevent soap buildup Never use abrasive cleaners and cleaning products that contain scoring agent because this may scratch the surface Never use bristle brushes or abrasive sponges To assure a long lasting finish wipe off the metal parts after each use with a soft cloth Do not use abrasive cleaners or cleaning products containing ammonia bleach or acid If accidentally used rinse the surface as soon as possible to prevent finish peeling or corrosion After cleaning th
18. aration for installation of Side Panel 01 Pages 8 14 Back Panel and Side Panel Installation Instruction Pages 14 19 Glass Shelf 05 Installation Instruction wo ccc cece eens Pages 20 21 Ver 1 Rev 1 22 lt QREAMLINE ream in style SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page Please read these instructions carefully before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Bases_ please visit www BathAuthority com Preparation 1 Examine boxes and packages for shipping damage Carefully remove Shower base from the packaging and check for any visual defects or shipping damages If the unit has been damaged has a finishing defect or has missing parts please contact our customer support department within 5 business days of the delivery date Please note that DreamLine will not replace any dama
19. blem please note that additional information such a photos may be required to fully process your warranty claim 4 Proof of purchase You may submit this information by e mail mail or fax to DreamLine Warranty Service Center 75 Hawk Road Warminster PA 18974 F 1 866 857 3638 T 1 866 731 2244 Warranty bathauthority com REAMLINE dream in style TEL 866 731 2244 FAX 866 227 1533 WWW BATHAUTHORITY COM For more information on DreamLine Shower Doors please visit www BathAuthority com
20. d lower base over the center of The drain pipe and set it into the place Fig 4 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 13 4 Level the tray and place marks on the studs above the upper edge of the tile flange See Fig 5 for details 5 Mix the bedding material Mortar Plaster etc Concrete is not recommended Apply enough bedding material to support the entire bottom of the shower base See Fig 6 for details Level base in two directions Fig 5 Mortar Plaster Fig 6 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 14 6 After the bedding material has been poured and before it sets place the shower base into the position with the drain assembly sliding over the PVC waste pipe It will be necessary to push the shower base until the top of the tile flange aligns with the marks drawn on the studs and the front edge is contacting the rough floor along the entire length of the shower base Ensure that the base is level in all directions You may need to use shims to hold the tray in the level until the bedding settles and supports the tray Remove all extra mortar See Fig 7 for details Fig 7 Waterproof Drywall Waterproof Drywall 7 Allow the bedding materi
21. des Make sure the flanges of the Wall profiles faces inside the shower See Fig 8 for details Je Fig 8 Rev 1 6 9 Move the finished frame to the designated position on the shower base the bathtub or the threshold depending on your installation push it against the walls If your top and bottom wall opening measurements are different or if the walls are out of plumb make adjustment by slightly pulling the Wall profiles 02 out of the Glass Profiles 01 Use the level to adjust the frame in the vertical position See Fig 9 for details 10 Using help to hold this assembly in the right position mark the drill holes on the wall through the holes on the flange of the Wall Profiles 02 11 Gently set the assembled unit aside drill the holes using 5 16 drill bit and insert the Wall anchors 15 Apply silicone caulk along the Wall profiles and around the holes on the wall Also apply silicone under the bottom Guide rail 03 Place the whole shower assembly back into the designated position and secure it to the walls using the Round head screws ST4 2x30 10 See Fig 10 for details Fig 9 Rev 1 6 NOTE Glass Door 04 comes with 1 preinstalled Wheel assemblies 17 If not Ow please refer to Fig 11 for detailed U s installation
22. e shiny finishes rinse thoroughly and wipe dry with soft cloth Clean stainless steel surfaces at least once a week When applying stainless steel cleaner or polish work with not across the grain Never use abrasive sponge or cloth steel wool or wired brushes SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 16 DREAMLINE EXCLUSIVE LIMITED WARRANTY AS OF MAY 6 2013 This warranty extends only to the original owner end user for household use only and is not transferable to a subsequent owner This warranty extends for a designated period of time so long as it remains in use in its original place of installation This warranty applies only to DreamLine products purchased from an authorized dealer in United States or Canada Proof of purchase original sales receipt from the original consumer purchase must be provided with all warranty claims IN NO EVENT SHALL THE LIABILITY OF DREAMLINE EXCEED THE PURCHASE PRICE OF THE UNIT DreamLine products must be installed by a fully insured and licensed professional Installation of DreamLine product by anyone other than fully insured licensed professionals shall VOID THE WARRANTY DreamLine recommends that such licensed professionals have experience in the installation of bathroom products Installation of certain products including without limitation glass products i e shower and tub doors by an inexperienced installer may result in glass breakage and consequently cause personal injury or death
23. eamLine is not responsible for product code compliance or for verifying building code restrictions on installation or use and any such compliance is excluded from this warranty DreamLine reserves the right to modify this warranty at any time such warranty modifications will not alter the warranty applicable at the time of sale of the products in question The warranty terms for specific products for consumer non industrial non commercial non business use only are SHOWER BACKWALL SHOWER CABINS JETTED amp STEAM DreamLine warrants shower backwalls and shower cabins to be free from defects in workmanship for a period of one 1 year from initial date of purchase by the owner end user contractor or builder from an authorized dealer SHOWER amp TUB DOORS SHOWER ENCLOSURES DreamLine warrants shower doors tub doors and shower enclosures to be free from defects in workmanship and materials under normal residential use for a period of five 5 years from the initial date of purchase by the owner end user contractor or builder from an authorized dealer Warranty for plastic strips shall be limited to one 1 year Warranty for any part in Oil Rubbed Bronze finish shall be limited to one 1 year SHOWER BASES DreamLine warrants shower bases to be free from defects in workmanship and materials under normal residential use for as long as the original consumer purchaser owns their home in which their product is installed SHOWER COLUMNS DreamLine wa
24. er 1 Rev 1 12 Determine which Side panel 01 will be installed on the side wall with the fixture Mark the fixture location on the Side panel according to the measurements taken in Step 11 See Fig 15 for details 13 Drill the holes for the fixtures in the Side panel 01 using the proper diameter saw bit or a handheld jig saw See Fig 16 for details A D B C Fig 15 Fig 16 Ver 1 Rev 1 11 14 Attach the Center cover 10 1 vertically Acrylic Back Panel and Side Panel Installation Instruction at the center point along 3 the line from Step 3 and mark the z lt IS drilling holes through the predrilled x holes in the Center cover Drill the holes using 05 16 drill bit and insert the Wall Anchors 06 See Fig 17 for details 05 16 Fig 17 15 Mount the Center cover 10 to the centerline of the 1 back wall using the Countersunk screws ST4 2x30 07 Do not fully tighten the screws at this time leave Ng them loose for further installation Xe See Fig 18 and Fig 19 for details Fig 18 Ver 1 Rev 1 16 Attach the Corner cover 02 to the corner of the shower and mark the drilling holes through the predrilled holes in the Corner cover Move aside the Corner cover Drill the holes using 5 16
25. fter opening all boxes and packages read this introduction carefully Check that all of the needed parts are included in the package by marking all the components on the Detailed Diagram of Shower Door Components Examine boxes and packages for shipping damage If the unit has been damaged has a finishing defect or has missing parts please contact our customer support department within 5 business days of the delivery date Please note that DreamLine will not replace any damaged products or missing parts free of charge after 5 business days or if the product has been installed Feel free to contact DreamLine if you have any questions Please note that you should consult your local building codes with questions on installation compliance standards Building and plumbing codes may vary by location and DreamLine is not responsible for code compliance standards for your project This acrylic wall system is specially designed to be installed over any solid surface If you are installing the acrylic walls over existing tiles remove all loose tiles before the installation If you are installing over existing painted walls remove any loose paint Please note that some cutting and drilling may be necessary during the installation process Make sure to turn off the water supply remove faucet handles or any fixture trims protruding from the wall Clean the surface removing any soap film and dirt from all wall surfaces using regular house
26. ged products or missing parts free of charge after 5 business days or if the product has been installed Feel free to contact DreamLine if you have any questions 2 Install all of the required plumbing and drainage before installing the shower Use a competent and licensed if required by local code plumber for all plumbing installation 3 Please note that you should consult your local building codes with questions on installation compliance standards Building and plumbing codes may vary by location and DreamLine is not responsible for code compliance standards for your project 4 Please insure that prior to the installation the installation surface is leveled and solid and will be able to support the total weight of the unit Also make sure the walls are at right angles While some adjustment in leveling of the tray is possible irregular installation surface level or improper angle of side walls will result in serious problems for your installation Please note that some adjustments and drilling might be necessary during the installation process IMPORTANT NOTE Dimensions provided for reference only You must measure the actual shower tray sizes before installation Allowed tolerance for center of the drain is 1 2 Tools Required ef SR 8 Tape Measure Pencil Level SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 2 SINGLE THRESHOLD SHOWER BASE Center Drain Configuration
27. he support BathAuthority com web page Please carefully read the instructions before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at 1 866 731 8378 ext 3 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Doors amp Tub Doors please visit www BathAuthority com Rev 1 6 Preparation 1 After opening all boxes and packages read this introduction carefully Check that all of the needed parts are included in the package by marking all the components on the Detailed Diagram of Shower Door Components Examine boxes and packages for shipping damage If the unit has been damaged has a finishing defect or has missing parts please contact our customer support department within 3 business days of the delivery date Please note that DreamLine will not replace any damaged products or missing parts free of charge after 3 business days or if the product has been installed Feel free to contact DreamLine if you have any questions 2 Please note that you should consult your local building codes with questions on installation compliance standards Building and plumbing codes may vary by location and DreamLine is not responsible for code compliance standards for your project
28. hold detergent and then wipe dry Tools Required a Tape Drill bit i T Square Caulk Measure Pencil Knife 5 16 q i Caulk ae N Phillips Level Gun Sa Hammer Screwdriver Ver 1 Rev 1 Detailed Diagram of Acrylic Shower Wall Components 2 ts 4 1 2 7 6 F g S9 So 3 62n 4 7 7 a 5 r R 6 10 ri U e 8 4 9 Packing List 01 Side panel 2pcs 06 Wall anchor 21pcs 02 Corner cover 2pcs 07 Countersunk screw ST4 2x30 21pcs 03 Decorative edge molding 2pcs 08 Decorative cover 15pcs 04 Shelf bracket 6pcs 09 Back panel 2pcs 05 Glass shelf 2pcs 10 Center cover 1pc NOTE Unpack your unit carefully and inspect it Lay it out and identify all parts using the detailed diagram and packing list in your manual as a reference Before discarding the carton check for small hardware bags that tend to fall to the bottom of the box If any parts are damaged or missing please contact DreamLine for replacement NOTE Retain these installation instructions for future reference Ver 1 Rev 1 3 Preparation for Installation of Back Panel 1 Place a mark on the walls at a distance of 1 one inch from the corner and draw a plumb vertical line from top to bottom See Fig 1 for details NOTE Repeat thi
29. ilable comparable product DreamLine warranty obligation shall be discharged upon tender of parts replacement or repair of the product Purchaser s refusal to accept the tender terminates all warranty obligations and VOIDS THE WARRANTY Cost of freight for returning products to DreamLine for repairs or replacement under this limited warranty are the responsibility of the customer Cost of freight associated with shipping of replacement product or parts to the customer may be charged to customer Any product replaced or repaired during the warranty period will be covered only for the remaining period of the original warranty In no event will DreamLine be liable for costs of repair or replacement of any installation material including but not limited to tiles marble etc DREAMLINE IS NOT RESPONSIBLE FOR INSTALLATION REMOVAL OR REINSTALLATION COSTS OF ANY PRODUCT REQUIRING WARRANTY SERVICES Any modification or alteration of any DreamLine products will void the warranty DreamLine product installations and repairs must be performed by either a DreamLine authorized agent or a licensed insured and experienced professional contractor installation or repairs performed by any other party shall void the warranty This warranty shall not apply to breakage or damages caused by normal wear and tear fault carelessness abuse misuse misapplication improper maintenance alteration or modification of the unit as well as chemical or natural corrosion accident f
30. illing hole with a distance of 2 from the cut off edge of the Guide rail Drill the new hole using 1 8 drill bit then fasten the stopper with screw ATTENTION Do not drill Guide rail throughout only the first layer See Fig 4 for details Fig 3 Fig 4 Rev 1 6 4 Fasten the bottom Guide rail 03 to the Glass profiles 01 with the Round head screws ST4 2x25 11 See Fig 5 for details 5 Slide the Stationary glasses 05 fully into the groove of the Glass profiles 01 and then fasten it by the Glass holders 16 to the bottom Guide rail 03 See Fig 6 for details Q Fig 5 Fig 6 Rev 1 6 6 Slightly tap the Single side strips 09 in between the Stationary glasses 05 and the Glass profiles 01 using wooden shim or other piece of wood The strips should be inserted from the sides that will face inside the shower ATTENTION Do not use the screwdriver or other metal objects you can scratch or damage the glass and aluminum 7 Repeat Step 4 and Step 5 to fasten the upper Guide rail 03 to the Glass profiles and secure the Stationary glasses by the Glass holders 16 See Fig 7 for details Fig 7 8 Slide the Wall profiles 02 all the way onto the Glass profiles 01 on both si
31. ire flood act of God or any other casualty Improper care and cleaning will void the warranty Use of cleaners containing abrasive cleansers ammonia bleach acids waxes alcohol solvents or other products not recommended for chrome or similar finish glass or acrylic will void the warranty For additional product maintenance instructions please refer to product installation manual DreamLine is not responsible for any issues arising in connection with errors or omissions in information provided on DreamLine s websites The warranty does not extend to any non DreamLine plumbing or components installed by installers end users or by any party other than DreamLine THE FOREGOING WARRANTIES ARE IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE BATH AUTHORITY LLC DREAMLINE AND OR SELLER DISCLAIMS ALL LIABILITY FOR SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGES DREAMLINE IS NOT LIABLE FOR PERSONAL INJURIES OR DEATH TO ANY PERSON OR FOR ANY DIRECT SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGE LOSS OF USE LOSS OF TIME LOSS OF PROFITS INCONVENIENCE INCIDENTAL EXPENSES LABOR OR MATERIAL CHARGES OR ANY OTHER COSTS RESULTING FROM THE USE OF ITS PRODUCTS OR PERTAINING TO THE APPLICATION OF THE PRESENT WARRANTY OR RESULTING FROM THE REMOVAL OR REPLACEMENT OF ANY PRODUCT OR ELEMENT OR PART COVERED BY THIS WARRANTY PRODUCT WARRANTY PERIODS Dr
32. nal adjustments of the assembled unit in the Wall 1 4 51 8 profiles 02 Drill the holes in the Glass profile 01 through predrilled holes in the Wall Profile using O 1 8 drill bit B ATTENTION Do not drill the profile throughout only the first layer of 2 the wall profile lt p Secure the Wall profile to the Glass profile using the Round head screws ST4 2 x10 12 4 Cover the exposed screw heads with the Decorative covers 14 See Fig 14 for details 3 A d gt Fig 14 Rev 1 6 16 Apply the sealant along the profiles and guide rails on the seams between the bottom guide rail and the profiles as well as along the shower base or threshold NI See Fig 15 for details Caulk Fig 15 Product Maintenance To insure long lasting life for your acrylic back walls wipe them off after each use with a soft cloth To clean the acrylic back walls use non abrasive sprays or cream based cleaners Never use abrasive cleansers metal brushes or scrapers that could scratch or dull the surface To insure long lasting life for your glass shower products wipe them off after each use with a soft cloth Rinse and wipe of the glass using either soft cloth or squeegee to prevent soap buildup Never use abrasive cleaners and cleaning products that contain scoring agent because this may scratch the surface Never use bristle brushes or abrasive sponges To assure
33. rrants shower columns to be free from defects in workmanship and materials under normal residential use for a period of one 1 year from the initial date of purchase by the owner end user contractor or builder from an authorized dealer SHOWER SEATS DreamLine warrants shower seats to be free from defects in workmanship and materials under normal residential use for a period of one 1 year from the initial date of purchase by the owner end user contractor or builder from an authorized dealer Warranty shall be VOID if the shower seat is not professionally installed on a properly reinforced wall VANITIES AND VESSEL SINKS DreamLine warrants bathroom vanities and vessel sinks to be free from defects in workmanship and materials under normal residential use for a period of one 1 year from the initial date of purchase by the owner end user contractor or builder from an authorized dealer STATE LAWS AND THIS WARRANTY Some states provinces do not allow limitations on how long an implied warranty lasts or the exclusion or limitation of special incidental or consequential damages so these limitations and exclusions may not apply to you This warranty gives you specific legal rights You may also have other rights which vary from state province to state province WARRANTY SERVICE The following information will be required for you to file a Warranty claim 1 Your name address and telephone number 2 Product model number 3 Brief description of pro
34. s step for both corners 2 The Shower back wall kit has two Back Panels 09 Measure the back wall of the shower between the vertical lines you marked in Step 1 This distance is marked as W See Fig 2 for details Fig 1 Fig 2 Ver 1 Rev 1 3 Divide the measurement W by two and place a mark in the center of the back wall and from there draw a plumb vertical line from top to bottom This distance is shown as W 2 See Fig 3 for details 4 Determine the position of both Back panels 09 NOTE a The Narrow side 2 3 4 of the Back panel cannot be trimmed and should face the center of the back wall as shown b The Wide side 3 1 8 of the Back panel must be trimmed to the size of the back wall if necessary and should face the corner See Fig 4 for details P Z e d La W Fig 3 By Fig 4 Wo 8 ZU Ver 1 Rev 1 5 Measure the Back Panel 09 Width of the Back Panel has to be less than or l equal to the distance between the center line and the corner line on the back wall in Step 3 i L lt W 2 4 If the width of the Back Panel is greater than aj the distance between the center line and the corner line on the back wall in Step 3 you have to trim the

Download Pdf Manuals

image

Related Search

Related Contents

Martha Stewart Living 1904500510 Instructions / Assembly  Service Manual - Ottobockdoc.se  Electrolux - Gibson 315541 User's Manual  IH炊飯ジャー JKT-B1  TRP-C08U User's Manual  User Manual - power universe technologies limited  33745取説埋込スクエア300タイプ_A3_A [Converted]  User Manual-iPOLiS Mobile-Android-ITALIAN-v2  Sunny WebBox With Bluetooth® Installation  INSTALLATION & SERVICE MANUAL  

Copyright © All rights reserved.
Failed to retrieve file