1. TEST NO 2 Purpose To test the check valve for tight ness in the direction of flow Requirement The check valve shall be drip tight in the normal direction of flow when the inlet pressure is at least 1 0 psi and the outlet pressure is atmospheric STEPS 1 Attach high side hose of the differential pressure gauge to test cock 1 Open test cock 1 and bleed all air from the hose and the gauge by opening the high side bleed needle valve Close the high side bleed needle valve 2 Close inlet shut off valve 3 Open test cock 2 The air inlet valve will open and the water in the body will drain out through test cock 2 When this flow of water stops the differential pressure indicated by the gauge after it has settled will be the pressure drop across the check valve This value must be 1 0 psi or greater Record this value If water continues to flow out of test cock 2 then the inlet shut off valve is leaking 4 Close test cocks 1 and 2 and remove equipment Replace air inlet canopy Open inlet shut off valve then outlet shut off valve oOo CANOPY SCREW g CANOPY g BONNET O RING RELIEF T B VALVE gig o_ ASSEMBLY Lo AIR INLET S DISC FLOAT amp SPRING RETAINER Q gt CHECK SPRING o lt SEAL RING OUTLET SHUT OFF VALVE OUTLET SHUT OFF VALVE O RING lt INLET SHUT OFF VALVE 1 SIZE 3 4 SIZE Troubleshooting PRO
2. the internal com ponents of the pressure vacuum breaker should be removed for the duration of the winter 7 Leave all drain valves 2 amp 6 shut off valves 3 amp 5 and test cocks in the half open half closed position 45 for the duration of the winter to prevent freezing CAUTION Be certain that main shut off 1 remains tightly closed to prevent refill ing of the system Also the main shut off valve must be resilient seated to insure no leakage of water into the system replace the valve only WARRANTY ZURN WILKINS Valves are guaranteed against defects of material or workmanship when used for the services recommended If in any recommended service a defect develops due to material or workmanship and the device is returned freight prepaid to ZURN WILKINS within 12 months from date of purchase it will be repaired or replaced free of charge ZURN WILKINS liability shall be limited to our agreement to repair or Proposition 65 Warning This product contains chemicals known to the State of California to cause cancer or birth defects or other reproductive harm ZURN WILKINS www zurn com Maintenance Instructions device Remove canopy screw and canopy AUN Close inlet and outlet shut off valves before disassembling 5 Remove the float assembly spring retainer spring and spider The seat and seat o ring may now be removed 6 Clean all parts with clean water only Bleed
3. BLEM POSSIBLE CAUSES Air inlet valve does not open as gauge drops to 0 0 psid 1 Air inlet disc stuck to seat Air inlet valve does not open and differential on gauge will 1 Leaking No 1 shut off valve not drop Air inlet opens below 1 0 psid Check valve opens below 1 0 psid ZURN WILKINS Dirty or damaged air inlet disc 2 Scale buildup on disc or bonnet Dirty or damaged check disc or seat o ring 2 Damaged seat 1747 Commerce Way Paso Robles CA 93446 Phone 855 663 9876 Fax 805 238 5766 2 ZURN WILKINS IS420XL REV 4 13 www zurn com
4. Model 420XL Pressure Vacuum Breaker 3 4 amp 1 LEAD FREE This product contains a weighted average lead content less than 0 25 for wetted surfaces ZURN WILKINS Installation U Testing Q Maintenance Instructions INSTALLATION INSTRUCTIONS CAUTION Installation of Pressure Vacuum breakers must be performed by qualified licensed personnel Faulty installation could result in an improperly functioning device The installer should be sure the proper device has been selected for the particular installation ZURN WILKINS Model 420XL Pressure Vacuum Breakers are for use on potable water lines where a health hazard could exist if a backsiphonage situation were to occur They must not be installed where backpressure may occur Proper performance depends upon following these installation instructions and prevail ing governmental and industry standards and codes Failure to do so releases ZURN WILKINS of any liability that it might otherwise have with respect to that device Such failure could also result in an improperly functioning device 1 Before installing the ZURN WILKINS Model 420XL Pressure Vacuum Breaker flush the lines thoroughly to remove all debris chips and other foreign matter 2 The Model 420XL must be installed in a vertical position see Fig 1 to provide prop er operation of the air inlet valve 3 Provide adequate space around the installed unit so that the test cocks will be accessible for testin
5. g and servicing 4 CAUTION If installation of a Model 420XL unit is in a building provide a suitable drain arrangement to drain off spillage from the air vent 5 Install valve at least 12 inches above the highest piping or water outlet down stream of the Model 420XL Pressure Vacuum Breaker Always consult local codes for installation methods approvals and guidance The Model 420XL Pressure Vacuum Breaker may be installed outdoors only if the device is protected against any freezing conditions Warning Do not block air vent opening with insulation Exposure to freezing conditions will result in improper function or damage to the device The installation location must be kept above 32 F NO PLACING THE DEVICE IN SERVICE After the installation of a Model 420XL Pressure Vacuum Breaker has been completed place the unit in service as follows 1 Start with both shut off valves closed Open the inlet shut off valve until the Pressure Vacuum Breaker is completely pressurized 2 A brief discharge from the air vent may occur while the device is pressurizing INLET SHUT OFF VALVE 3 OUTLET SHUT OFF VALVE 5 TESTCOCKS 4 12 MIN ABOVE HIGHEST OUTLET OUTLET DRAIN VALVE 6 MAIN SHUT OFF ly VALVE 1 The discharge should cease by the time the shut
6. off pressure by opening the No 2 test cock 7 After completing inspection replace necessary parts and re Unscrew the bonnet from the body by turning counterclock assemble Repair kits are available from your supplier wise CAUTION Apply force at the outside edge of bonnets 8 Retest according to TESTING PROCEDURES DO NOT use wrench or screwdriver on top of bonnet or float guides damage can result Testing Procedures TEST NO 1 Purpose To test the opening pressure dif ferential of the air inlet valve Requirement The air inlet valve shall open when the pressure in the body is more than 1 0 psi above atmospheric pressure The air inlet valve shall be fully open when the water drains from the body STEPS Bleed water through both test cocks to eliminate foreign material Install appropriate fittings for test kit hoses Remove air inlet canopy Install the high side hose of the diffe rential pressure gauge to test cock 2 Open test cock 2 and bleed air from hose and gauge by opening the high side bleed needle valve Close the high side bleed needle valve 5 Close outlet shut off valve then close inlet shut off valve 6 Slowly open the high side bleed needle valve being especially careful not to drop the pressure differential too fast Record the pressure differential at which the air inlet valve opens 7 Close test cock 2 and remove equip ment 8 Open inlet shut off valve N AW
7. off valve is in the full open position 3 Ifthe discharge does not stop refer to MAINTENANCE INSTRUCTIONS Repressurize device as in Step 1 Device should function properly 4 Slowly open the No 2 shut off valve The Model 420XL is now in service 5 After the Model 420XL has been prop erly installed test the device If the device fails the test refer to MAINTENANCE INSTRUCTIONS Drain Procedure for Freeze Protection 1 Turn off main shut off 1 that supplies water to the system 2 Open both inlet and outlet drain valves in the system 2 amp 6 Open inlet and outlet shut off valves on the pressure vacuum breaker 3 amp 5 and all of the test cocks Leave all valves and test cocks in the half open half closed 45 position to allow full drainage of the ball valves and test cocks 3 If you with to blow out the system downstream of the pressure vacuum breaker make sure the outlet drain valve 6 is open and the pressure vacuum breaker shut off valve 5 is closed 4 Connect an air hose to the outlet drain valve 6 and inject an adequate volume of air to remove all water from the downstream portion of the system 5 CAUTION Open outlet shut off valve to the pressure vacuum breaker 5 and outlet drain valve 6 to the half open half closed 45 position after blow out process is completed 6 If drain valves 2 amp 6 are not part of the system and if air pressure is not used to blow out the system