Home

Atdec SD-SA-DK-DB-P flat panel desk mount

image

Contents

1. D A Cp iN apnanaaae WA J j WL Swing Arm Spacer Tube Assembly x2 Assembly x2 16mm Cable Wrap x2 Threaded Rod and Top Cap Inner Tube Post x1 L 5mm Allen e p Key xl these lat on ta Plate x1 _ ey Desk Clamp M8 Desk Clamp Bracket x1 Screw x1 Possible Configurations Spacedec Acrobat Swing Arm Double can be assembled in a number of different configurations depending on the users requirements Two such examples are shown below and right Arm Spacer Arm Spacer Side by side displays A Installation Instructions SPACEDEC ACROBAT SWING ARM DOUBLE TN Cable Wrap atl Ys TA Cable Manager N Applicator x1 A Tube Clip x1 _ Cable Clip fj ena M8 Interscrew Z x4 J xl Base Casting x1 Washer x1 M4xl6mm i Countersunk S Screw x3 i M8 Nyloc Nut xl __ E i Extension Clip x8 y Top Cap Tool x1 2 5mm Allen i Key xl Mounting Fasteners he M4x1O0mm gt M4x12mm Screw x8 Screw x8 M4xl mm Screw x8 Arm Arm Spacer Spacer Back to Back displays A Component Checklist Check you have received all parts against the Component Checklist on the previous page Assemble the Arm B 2 Assemble the Swing Arm Assemble the Swing Arm in the desired contigurat
2. e Tight CS for square edged 1g i Threaded Firmly Rod desks only Mounting Options Continued C 2 Bolt Through C 2 1 Drill Mounting Hole Top Cap Tool Drill a 13mm 2 hole in your work surface at the desired location tor your arm Threaded Rod C 2 2 Install as shown Insert the M8 Interscrew up through the hole in the work surtace Using both hands secure the M8 Interscrew with the 5mm Allen Key supplied in the Desk Clamp Box and use the other A gt Washer hand to tighten the Threaded Rod into the Interscrew with the J i M8 Interscrew supplied Top Cap Tool see diagram C 2 3 te Tighten Base Casting D Attaching the Displays 100mm x 100mm 4 x 4 mounting hole pattern Extension Clips 4x12mm or 4xl6mm Screws a Ensure that the i i flat side of each ame Pi A NED Extension Clip sits against the back of the display E Installing Cable Management E 1 Push the four supplied Cable Clips into the holes on the underside of the Swing Arm Double as shown E 2 Feed the cables into the Cable Wrap Applicator E 3 Insert the Cable Wrap Applicator into the Cable Wrap as shown E 4 Squeeze the nose of the Applicator and place inside the Cable Wrap ensuring that the opening edges of the Cable Wrap face towards the nose of the applicator as shown in diagram 4 F 1 Position the displays at their highest possible position to ensure that there is i Abe Cable Wrap s
3. e the Pivot Head 5mm Allen Key supplied in the Desk Clamp Box to tighten the interscrew in a clockwise direction To decrease the resistance of the Pivot Head to suit lighter displays loosen the interscrew in an anti clockwise direction Interscrew 5mm Allen Key NOTE It is recommended the Pivot Head be left at the factory setting for best performance Loosen G 3 Adjusting the Swing Arm Gas Strut Resistance G 3 1 Depending on the weight of the display it may be necessary to adjust the arm This can be done by using the 5mm Allen Key supplied in the Desk Clamp Box 3kg Les G 3 2 If the arm tends to automatically rise or tall when display N Da a A A i r O SUI the display is attached it will be necessary to make small A er fone adjustments to the gas strut see diagram on the right display g m a A A display Lower Gas G 3 3 If the arm tends to rise the gas strut position should be raised If the arm tends to fall the gas strut position should be Strut to suit Smm heavier lowered Allen key display Installation Complete SZTN atdec As LCD Manufacturers are constantly releasing new monitor models Atdec does not accept responsibility if the mounting hole pattern does not comply with the international VESA standards Due to continuing product development the manufacturer reserves the right to alter specifications without notice Published 08 11 07
4. ion ensuring all components are used as shown B 1 Disassemble the Tube Assembly You will need to disassemble the Tube Assembly before assembling the Swing Arm Swing Arm Assembly Top Cap and Threaded Rod Threaded Rod Internal Tube Post and Top Cap Internal Tube Post Spacer Tube Spacer Tube x2 sE a is x2 Tube Clip e Mounting Options C 1 Desk Clamp C 1 1 Assemble the Desk Clamp DESK CLAMP ADJUSTMENT RANGE To assemble the Desk Clamp Assembly first place the M8 Nyloc Nut inside the Base Casting with the Plastic e te E NOTE It is A Suits 12mm 1 2 Ring facing down then screw the Base Casting on to the Te to 88mm 11 2 J Desk Clamp Bracket using the M4xl mm Countersunk a Ue Sa Clamp be surmaces screws attached to M8 Nyloc M4xlomm IH Ceo the rear or Nut Countersunk s Pressure Plate ide ed Screw x3 prj A aude A MB Desk of the work Base ie surface cnn c amp Screw Desk Adjust the Desk Clamp to suit your desk thickness by Clamp turning the M8 Desk Clamp Screw with the supplied Bracket 5mm Allen Key C 1 3 Attaching the Swing Arm Post Use the Top Cap Tool to tighten the Threaded Rod into the Base Casting as shown below C 1 2 Attaching the Desk Clamp Base Casting lt a Top Cap a SS Too Desk Top JS Pressure Plate pee clans M8 Desk Clamp Screw Assembly 5mm Allen Key NOTE Desk Clamp Ea Assembly is suitabl
5. utticient cabling at the end of the arm 7 so the cables are not stretched or pulled out when the displays are moved Cable Tube Manager Clip BEFORE PROCEEDING TO THE NEXT STEP PLEASE NOTE Swing Arm Double will only work when a display is properly installed DO NOT adjust tension screws or gas strut until your display has been attached G Ergonomic Guidelines Recommended Mounting Position When mounting the Spacedec Acrobat Swing Arm Double ensure the correct focal distance can be achieved for ultimate visual comfort H Adjusting the Display The Spacedec Acrobat Swing Arm Double comes factory set to support 6kg displays Adjust the arm to suit the weight of your display as shown in the following steps G 1 Adjusting the Ball Joint Resistance Depending on the weight of the display it may be necessary to make adjustments to the Ball Joint Mechanism It the Gr 4 Tension display doesn t hold its position or is too resistant adjust E TOENA Screws x4 the four tension screws located around the Ball Joint see i diagram on the right using the supplied 2 5mm Allen Key Check the display and then adjust again if necessary A Eim Allen Key Ball Joint NOTE Be sure to adjust screws evenly G 2 Adjusting the Pivot Head Resistance It is possible to control the amount of resistance in the Pivot Head to suit your display To increase the resistance of the Pivot Head to suit heavier displays us

Download Pdf Manuals

image

Related Search

Related Contents

  Manual - Fire Systems Ltd  Manuel utilisateur / User Manual  DIVISION EN VOLUMES : MODE D`EMPLOI - Custom  取扱説明書 - Tascam  T'nB Bubble  Worldwide Lighting W83336B20 Installation Guide    PPME0304 - Porta de Enrolar.cdr  VT-DESOL2 : STATION DE DESSOUDAGE  

Copyright © All rights reserved.
Failed to retrieve file